Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) J-18/LAB revamp/N-butanol project at Gujarat Refinery
(b)Name of the Company / Organisation Indian Oil Corporation Limited (IOCL)
(c)Registered Address Gujarat Refinery, PO Jawaharnagar,,Vadodara,Vadodara,Gujarat-391320
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Soumitra Ray Choudhuri
(b)Designation (Owner/ Partner/ CEO) Deputy General Manager
(c)Address DGM(HSE), Room no 206, I floor, Technical Building, Gujarat Refinery,PO Jawaharnagar, Vadodara,,Vadodara,Gujarat-391320
(d)Pin code 391320
(e)E-mail makwanabb@indianoil.in
(f)STD Code. 265(f)Telephone No. 2237371
(g)Fax No. 02652233300
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
5(c) Petro-chemical complexes (industries based on processing of
6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/60736/2016
(d)Master Proposal Number(Single Window) SW/132320/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gujarat refinery
(b)Pincode 391320
(c)Bounded Latitudes (North)
From
Degree 22.222687
Minutes
Second
From
Degree 22.23278
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.62828
Minutes
Second
From
Degree 73.72394
Minutes
Second
(e)Survey of India Topo Sheet No. F43H3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 40
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratJamnagarJamnagarSikka
(2.)GujaratVadodaraVadodara
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/96/2015-IA II(I)
(c)Date of Issue of TOR 07 Sep 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 29 Nov 2016
(c)Date of Issue of EC 20 Mar 2017
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PP proponent has requested to EAC for exemption of
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-74/2015(ENV)/412
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 12 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)INDMAX02.72.7OthersMTPAOthersPipeline/tanker
(2.)INDMAX GDS00.650.65OthersMTPAOthersPipeline/tanker
(3.)SRU0400400OthersTPDOthersPipeline/tanker
(4.)CR LPG TREATER01.0731.073OthersMTPAOthersPipeline/tanker
(5.)PRU00.5800.58OthersMTPAOthersPipeline/tanker
(6.)ARU0350350OthersTPHOthersPipeline/tanker
(7.)SWS0330330OthersTPHOthersPipeline/tanker
(8.)AVU01515OthersMTPAOthersPipeline/tanker
(9.)KHDS00.70.7OthersMTPAOthersPipeline/tanker
(10.)LAB Revamp12042162OthersKTAOthersPipeline/ tanker
(11.)SR LPGTU00.20.2OthersMTPAOthersPipeline/tanker
(12.)CCRU01.61.6OthersMTPAOthersPipeline/tanker
(13.)ISOM00.9250.925OthersMTPAOthersPipeline/tanker
(14.)PP00.4200.42OthersMTPAOthersPipeline/tanker
(15.)N-BUTANOL09090OthersKTAOthersPipeline/tanker
(16.)REVAMP OF HGU-II FOR SYN GAS085008500OthersNm3/hrOthersPipeline/tanker
(17.)NHT/NSU02.42.4OthersMTPAOthersPipeline/tanker
(18.)revamp of HGU -II for Hydrogen043004300OthersNm3/hrOthersPipeline/ tanker
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)crude processing13.7 MMTPA4.3 MMTPA18 MMTPA
(2.)Revamp of HGU-II for Syn gas production08500 Nm3/hr8500 Nm3/hrRevamp
(3.)N- Butanol090 KTA90KTARevamp
(4.)Revamp of HGU-II for Hydrogen production15000 Nm3/hr4300 Nm3/hr4300 Nm3/hrRevamp of HGU -II for production of Hydrogen and Syn gas.
(5.)LAB Revamp120 KTA42 KTA162 KTARevamp
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Nov 2016
(iv)Valid Upto 07 Sep 2021
(v)File No. AWH 83554
(vi)Application No. 114419
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 22210
(b) Funds Allocated for Environment Management (Capital) (in Crores) 295.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 27.76
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.68
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 13.54
(c)Total quantity of raw material/fuel 13.54
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CRUDE OIL18000OthersTMTPAMix crudeOtherspipeline450 Open MarketCopy of Linkage
(2.)Benzene80.7OthersTMTPAIOCL panipatOtherstank and truks1100 Otherssame sister companyCopy of Linkage
(3.)Natural Gas651OthersTMTPAGAIL & GSPLOthersPipeline120 Open MarketCopy of Linkage
(4.)Methanol13.54OthersTMTPAopen marketRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube165.1415.8180
(2.)PM10Micro Gram per Meter Cube38.216.637.6100
(3.)NOxMicro Gram per Meter Cube19.68.6319.180
(4.)PM2.5Micro Gram per Meter Cube70407060
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l8334345002000
(2.)pHNA7.967.3400
(3.)Fluoridemg/l0.870.521.01.5
(4.)Chloridesmg/l1851072501000
(5.)Total Hardnessmg/l440240200600
(6.)Heavy Metalscoppermg/l000.051.5
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.337.49C
(2.)DONA7.26.4C
(3.)CODmg/l2616C
(4.)BODmg/l2.50C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.148.875
(2.)Leq(Night)A-weighted decibels(dB(A))51.840.570
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.057.48
(2.)Electric ConductivityMillisiemens per Centimetre0.260.09
(3.)P(Phosphorus)Kilogram per hectare39.417.5
(4.)N(Nitrogen)Kilogram per hectare477296
(5.)K(Potassium)Kilogram per hectare366258
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.5 To 3.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 20.1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface7821614Copy of Permission LetterPipelineOthersExisting french wells009 Jun 201895457
(2.)OthersVMC210002Copy of Permission LetterPipelineOthersTreated Sewage water channel0009 Jun 201821000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process and domestic water3960045240ETPOthersReuse347044896
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 39600
(b)Total Discharged Water (Kilolitre per Day) 4896
(c)Total Reused Water (Kilolitre per Day) 34704
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15678Tons0OthersUsed in plant premisesAuthorized Recyclers
(2.)No. of Ethyl mercaptan drums/empty drumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)14502Tons0OthersUsed in plant premisesAuthorized Recyclers
(3.)Solid(Bio Sludge Disposed)Municipal Solid Waste4400Tons1OthersTractor TrolleysOthersused as Manure for plantation
(4.)Tank bottom and CETPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)140000Tons0Othersused in plant premisesOthersBioremediation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube16015.5131.5180
(2.)NOxMicrogram per Meter Cube18.504.5923.1080
(3.)PM2.5Microgram per Meter Cube38.200.0538.2660
(4.)PM10Microgram per Meter Cube7000.0970.9100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)crude charge heaterfuel gas604SO21.3
(2.)Vaccum charge heaterfuel gas603.5OthersCO3
(3.)MS block-1808-F-001 charge heaterFuel gas603.9PM100
(4.)MS Block-1808-F-001 charge heaterfuel gas603.9SO20.11
(5.)MS Block- 1808-F-001 charge heaterfuel gas603.9OthersCO0
(6.)MS Block- 1808-F-002 Naphta Spliter Reboilerfuel gas603.9PM100
(7.)MS Block 1808 -F002 Naphtha sulitter reboilerfuel gas603.9NOx5.06
(8.)1809-F-003 NO2 Interheaterfuel gas603.9PM100
(9.)1809-F-003 No 2 Interheaterfuel gas603.9SO20.18
(10.)1809-F-004 No 3 interheaterfuel gas603.5PM100
(11.)1809-F-004 No3 Interheaterfuel gas603.5SO20.14
(12.)1809-F-004 No 3 Interheaterfuel gas603.5NOx2.18
(13.)1809-F-005 Debutanizer reboiler heaterfuel gas603.9PM100
(14.)1809-F-005 Debutanizer reboiler heaterfuel gas603.9NOx1.05
(15.)Vaccum charge heaterfuel gas603.5SO21.5
(16.)Vaccum charge heaterfuel gas603.5NOx7.4
(17.)MS Block -1808-F-001 charge heaterfuel gas603.9NOx1.60
(18.)1809-F-001 Charge heaterfuel gas603.5SO20.12
(19.)1809-F-002 No 1 Interheaterfuel gas603.5PM100
(20.)Crude charge heaterfuel gas604OthersCO2.7
(21.)1809-F-001 Charge heaterfuel gas603.5NOx1.78
(22.)1809-F-001 Charge heaterfuel gas603.5PM100
(23.)crude charge heaterfuel gas604NOx6.7
(24.)1809-F-003 No 2Interheaterfuel gas603.9NOx2.72
(25.)1809-F-005-Debutanizer reboiler heaterfuel gas603.9SO20.07
(26.)crude charge heaterfuel gas604PM100
(27.)1809-F002 No1 Interheaterfuel gas603.5SO20.12
(28.)1809-F-002 No1 Interheaterfuel gas603.5NOx3.6
(29.)Vaccum charge heaterfuel gas603.5PM100
(30.)MS Block- 1808 -F002 Naphtha sulitter reboilerfuel gas603.9SO20.33
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 127770
(b)Source Grid import facility being developed at JR
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 315 kVA DG Set at 0.415 kV level for Cooling Tower
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 36.4
    Total Land (ha.) 36.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 374.3
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 374.3
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.99
(2.)OthersProcess area, non process, builtup area32.34Process area, non process, builtup area
Total (ha.) 36.33
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NIL
(2.)Critically Polluted AreaNA0NIL
(3.)WLSNA0NIL
(4.)NPANA0NIL
(5.)ESZsNA0NIL
(6.)Wildlife CorridorsNA0NIL
(7.)CorridorsNA0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NIL
(2.)Archaeological SitesNA0NIL
(3.)Defence InstallationsNA0NIL
(4.)OthersNANA0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 28.84
(b)Land yet to be acquired(Ha) 7.56
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mahi River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 145
(b)Permanent Employment-During Operation 125
(c)Temporary Employment- During Construction 2000
(d)Temporary Employment- During Operation 500
(e)No. of working days 365
(f)Total Manpower 2770
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Funds Allocated0600000600000
(2.)Total Area of Green Belt96.724100.72
(3.)No. of Plants2150006000221000
(4.)Percentage of Total Project Area25.8312.338.129999999999995
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe project will provide indirect employment to unskilled, semiskilled and skilled categories.
(2.)SocialImplementation of the project will indirectly boost up the physical and social infrastructure of the surrounding, like local education, medical and communication of the whole surrounding area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Technolab India Private Limited
(iii)Address ABC Tower, #400, 13th Street , SIDCO Industrial Estate (North Phase) Ambattur -600098, Land Mark Near National Productivity Councial)
(iv)Mobile No. 8619246318
(v)Landline No. 0222758044
(vi)Email Id mumbai@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSoumitra Ray Choudhuri
DesignationDeputy General Manager
Name of Company (Applicant Name should not be given here)Indian Oil Corporation Limited (IOCL)
AddressGujarat Refinery, PO Jawaharnagar,