1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | J-18/LAB revamp/N-butanol project at Gujarat Refinery | (b)Name of the Company / Organisation | Indian Oil Corporation Limited (IOCL) | (c)Registered Address | Gujarat Refinery,
PO Jawaharnagar,,Vadodara,Vadodara,Gujarat-391320 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Soumitra Ray Choudhuri | (b)Designation (Owner/ Partner/ CEO) | Deputy General Manager | (c)Address | DGM(HSE), Room no 206,
I floor, Technical Building, Gujarat Refinery,PO Jawaharnagar, Vadodara,,Vadodara,Gujarat-391320 | (d)Pin code | 391320 | (e)E-mail | makwanabb@indianoil.in | (f)STD Code. | 265(f)Telephone No. | 2237371 | (g)Fax No. | 02652233300 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry 5(c) Petro-chemical complexes (industries based on processing of 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/60736/2016 | (d)Master Proposal Number(Single Window) | SW/132320/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Gujarat refinery | (b)Pincode | 391320 | (c)Bounded Latitudes (North) | | From | | Degree | 22.222687 | Minutes | | Second | | From | | Degree | 22.23278 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.62828 | Minutes | | Second | | From | | Degree | 73.72394 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43H3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 40 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Jamnagar | Jamnagar | Sikka | (2.) | Gujarat | Vadodara | Vadodara | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/96/2015-IA II(I) | (c)Date of Issue of TOR | 07 Sep 2016 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 29 Nov 2016 | (c)Date of Issue of EC | 20 Mar 2017 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | PP proponent has requested to EAC for exemption of | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-74/2015(ENV)/412 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 12 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | INDMAX | 0 | 2.7 | 2.7 | Others | MTPA | Others | Pipeline/tanker | (2.) | INDMAX GDS | 0 | 0.65 | 0.65 | Others | MTPA | Others | Pipeline/tanker | (3.) | SRU | 0 | 400 | 400 | Others | TPD | Others | Pipeline/tanker | (4.) | CR LPG TREATER | 0 | 1.073 | 1.073 | Others | MTPA | Others | Pipeline/tanker | (5.) | PRU | 0 | 0.580 | 0.58 | Others | MTPA | Others | Pipeline/tanker | (6.) | ARU | 0 | 350 | 350 | Others | TPH | Others | Pipeline/tanker | (7.) | SWS | 0 | 330 | 330 | Others | TPH | Others | Pipeline/tanker | (8.) | AVU | 0 | 15 | 15 | Others | MTPA | Others | Pipeline/tanker | (9.) | KHDS | 0 | 0.7 | 0.7 | Others | MTPA | Others | Pipeline/tanker | (10.) | LAB Revamp | 120 | 42 | 162 | Others | KTA | Others | Pipeline/ tanker | (11.) | SR LPGTU | 0 | 0.2 | 0.2 | Others | MTPA | Others | Pipeline/tanker | (12.) | CCRU | 0 | 1.6 | 1.6 | Others | MTPA | Others | Pipeline/tanker | (13.) | ISOM | 0 | 0.925 | 0.925 | Others | MTPA | Others | Pipeline/tanker | (14.) | PP | 0 | 0.420 | 0.42 | Others | MTPA | Others | Pipeline/tanker | (15.) | N-BUTANOL | 0 | 90 | 90 | Others | KTA | Others | Pipeline/tanker | (16.) | REVAMP OF HGU-II FOR SYN GAS | 0 | 8500 | 8500 | Others | Nm3/hr | Others | Pipeline/tanker | (17.) | NHT/NSU | 0 | 2.4 | 2.4 | Others | MTPA | Others | Pipeline/tanker | (18.) | revamp of HGU -II for Hydrogen | 0 | 4300 | 4300 | Others | Nm3/hr | Others | Pipeline/ tanker | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | crude processing | 13.7 MMTPA | 4.3 MMTPA | 18 MMTPA | | (2.) | Revamp of HGU-II for Syn gas production | 0 | 8500 Nm3/hr | 8500 Nm3/hr | Revamp | (3.) | N- Butanol | 0 | 90 KTA | 90KTA | Revamp | (4.) | Revamp of HGU-II for Hydrogen production | 15000 Nm3/hr | 4300 Nm3/hr | 4300 Nm3/hr | Revamp of HGU -II for production of Hydrogen and Syn gas. | (5.) | LAB Revamp | 120 KTA | 42 KTA | 162 KTA | Revamp | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 04 Nov 2016 | (iv)Valid Upto | 07 Sep 2021 | (v)File No. | AWH 83554 | (vi)Application No. | 114419 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 22210 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 295.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 27.76 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.68 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 13.54 | (c)Total quantity of raw material/fuel | 13.54 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | CRUDE OIL | 18000 | Others | TMTPA | Mix crude | Others | pipeline | 450 | Open Market | | Copy of Linkage | (2.) | Benzene | 80.7 | Others | TMTPA | IOCL panipat | Others | tank and truks | 1100 | Others | same sister company | Copy of Linkage | (3.) | Natural Gas | 651 | Others | TMTPA | GAIL & GSPL | Others | Pipeline | 120 | Open Market | | Copy of Linkage | (4.) | Methanol | 13.54 | Others | TMTPA | open market | Road | | 250 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 16 | 5.14 | 15.81 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 38.2 | 16.6 | 37.6 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 19.6 | 8.63 | 19.1 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 70 | 40 | 70 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 833 | 434 | 500 | 2000 | (2.) | pH | | | NA | | 7.96 | 7.34 | 0 | 0 | (3.) | Fluoride | | | mg/l | | 0.87 | 0.52 | 1.0 | 1.5 | (4.) | Chlorides | | | mg/l | | 185 | 107 | 250 | 1000 | (5.) | Total Hardness | | | mg/l | | 440 | 240 | 200 | 600 | (6.) | Heavy Metals | | copper | mg/l | | 0 | 0 | 0.05 | 1.5 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.33 | 7.49 | C | (2.) | DO | | NA | | 7.2 | 6.4 | C | (3.) | COD | | mg/l | | 26 | 16 | C | (4.) | BOD | | mg/l | | 2.5 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.1 | 48.8 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 51.8 | 40.5 | 70 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.05 | 7.48 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.26 | 0.09 | (3.) | P(Phosphorus) | Kilogram per hectare | | 39.4 | 17.5 | (4.) | N(Nitrogen) | Kilogram per hectare | | 477 | 296 | (5.) | K(Potassium) | Kilogram per hectare | | 366 | 258 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.5 To 3.15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.05 To 20.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 78216 | 14 | Copy of Permission Letter | Pipeline | | Others | Existing french wells | 0 | 09 Jun 2018 | 95457 | (2.) | Others | VMC | 21000 | 2 | Copy of Permission Letter | Pipeline | | Others | Treated Sewage water channel | 00 | 09 Jun 2018 | 21000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process and domestic water | 39600 | 45240 | ETP | Others | Reuse | 34704 | 4896 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 39600 | (b)Total Discharged Water (Kilolitre per Day) | 4896 | (c)Total Reused Water (Kilolitre per Day) | 34704 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15678 | Tons | 0 | Others | Used in plant premises | Authorized Recyclers | | (2.) | No. of Ethyl mercaptan drums/empty drums | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 14502 | Tons | 0 | Others | Used in plant premises | Authorized Recyclers | | (3.) | Solid(Bio Sludge Disposed) | Municipal Solid Waste | | 4400 | Tons | 1 | Others | Tractor Trolleys | Others | used as Manure for plantation | (4.) | Tank bottom and CETP | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 140000 | Tons | 0 | Others | used in plant premises | Others | Bioremediation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 16 | 0 | 15.51 | 31.51 | 80 | (2.) | NOx | | Microgram per Meter Cube | 18.5 | 0 | 4.59 | 23.10 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 38.2 | 0 | 0.05 | 38.26 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 70 | 0 | 0.09 | 70.9 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | crude charge heater | fuel gas | 60 | 4 | SO2 | | 1.3 | (2.) | Vaccum charge heater | fuel gas | 60 | 3.5 | Others | CO | 3 | (3.) | MS block-1808-F-001 charge heater | Fuel gas | 60 | 3.9 | PM10 | | 0 | (4.) | MS Block-1808-F-001 charge heater | fuel gas | 60 | 3.9 | SO2 | | 0.11 | (5.) | MS Block- 1808-F-001 charge heater | fuel gas | 60 | 3.9 | Others | CO | 0 | (6.) | MS Block- 1808-F-002 Naphta Spliter Reboiler | fuel gas | 60 | 3.9 | PM10 | | 0 | (7.) | MS Block 1808 -F002 Naphtha sulitter reboiler | fuel gas | 60 | 3.9 | NOx | | 5.06 | (8.) | 1809-F-003 NO2 Interheater | fuel gas | 60 | 3.9 | PM10 | | 0 | (9.) | 1809-F-003 No 2 Interheater | fuel gas | 60 | 3.9 | SO2 | | 0.18 | (10.) | 1809-F-004 No 3 interheater | fuel gas | 60 | 3.5 | PM10 | | 0 | (11.) | 1809-F-004 No3 Interheater | fuel gas | 60 | 3.5 | SO2 | | 0.14 | (12.) | 1809-F-004 No 3 Interheater | fuel gas | 60 | 3.5 | NOx | | 2.18 | (13.) | 1809-F-005 Debutanizer reboiler heater | fuel gas | 60 | 3.9 | PM10 | | 0 | (14.) | 1809-F-005 Debutanizer reboiler heater | fuel gas | 60 | 3.9 | NOx | | 1.05 | (15.) | Vaccum charge heater | fuel gas | 60 | 3.5 | SO2 | | 1.5 | (16.) | Vaccum charge heater | fuel gas | 60 | 3.5 | NOx | | 7.4 | (17.) | MS Block -1808-F-001 charge heater | fuel gas | 60 | 3.9 | NOx | | 1.60 | (18.) | 1809-F-001 Charge heater | fuel gas | 60 | 3.5 | SO2 | | 0.12 | (19.) | 1809-F-002 No 1 Interheater | fuel gas | 60 | 3.5 | PM10 | | 0 | (20.) | Crude charge heater | fuel gas | 60 | 4 | Others | CO | 2.7 | (21.) | 1809-F-001 Charge heater | fuel gas | 60 | 3.5 | NOx | | 1.78 | (22.) | 1809-F-001 Charge heater | fuel gas | 60 | 3.5 | PM10 | | 0 | (23.) | crude charge heater | fuel gas | 60 | 4 | NOx | | 6.7 | (24.) | 1809-F-003 No 2Interheater | fuel gas | 60 | 3.9 | NOx | | 2.72 | (25.) | 1809-F-005-Debutanizer reboiler heater | fuel gas | 60 | 3.9 | SO2 | | 0.07 | (26.) | crude charge heater | fuel gas | 60 | 4 | PM10 | | 0 | (27.) | 1809-F002 No1 Interheater | fuel gas | 60 | 3.5 | SO2 | | 0.12 | (28.) | 1809-F-002 No1 Interheater | fuel gas | 60 | 3.5 | NOx | | 3.6 | (29.) | Vaccum charge heater | fuel gas | 60 | 3.5 | PM10 | | 0 | (30.) | MS Block- 1808 -F002 Naphtha sulitter reboiler | fuel gas | 60 | 3.9 | SO2 | | 0.33 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 127770 | (b)Source | Grid import facility being developed at JR | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 315 kVA DG Set at 0.415 kV level for Cooling Tower | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 36.4 | Total Land (ha.) | 36.4 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 374.3 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 374.3 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 3.99 | | (2.) | Others | Process area, non process, builtup area | 32.34 | Process area, non process, builtup area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | NA | 0 | NIL | (2.) | Critically Polluted Area | NA | 0 | NIL | (3.) | WLS | NA | 0 | NIL | (4.) | NPA | NA | 0 | NIL | (5.) | ESZs | NA | 0 | NIL | (6.) | Wildlife Corridors | NA | 0 | NIL | (7.) | Corridors | NA | 0 | NIL | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NIL | (2.) | Archaeological Sites | | NA | 0 | NIL | (3.) | Defence Installations | | NA | 0 | NIL | (4.) | Others | NA | NA | 0 | NIL | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 28.84 | (b)Land yet to be acquired(Ha) | 7.56 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Mahi River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 5.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 145 | (b)Permanent Employment-During Operation | 125 | (c)Temporary Employment- During Construction | 2000 | (d)Temporary Employment- During Operation | 500 | (e)No. of working days | 365 | (f)Total Manpower | 2770 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Funds Allocated | 0 | 600000 | 600000 | (2.) | Total Area of Green Belt | 96.72 | 4 | 100.72 | (3.) | No. of Plants | 215000 | 6000 | 221000 | (4.) | Percentage of Total Project Area | 25.83 | 12.3 | 38.129999999999995 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | The project will provide indirect employment to unskilled, semiskilled and skilled categories. | (2.) | Social | Implementation of the project will indirectly boost up the physical and social infrastructure of the surrounding, like local education, medical and communication of the whole surrounding area. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0048 | (ii)Name of the EIA Consultant | ABC Technolab India Private Limited | (iii)Address | ABC Tower, #400, 13th Street , SIDCO Industrial Estate (North Phase) Ambattur -600098, Land Mark Near National Productivity Councial) | (iv)Mobile No. | 8619246318 | (v)Landline No. | 0222758044 | (vi)Email Id | mumbai@abctechnolab.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Soumitra Ray Choudhuri | Designation | Deputy General Manager | Name of Company (Applicant Name should not be given here) | Indian Oil Corporation Limited (IOCL) | Address | Gujarat Refinery,
PO Jawaharnagar, |
|