Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. PARAS INDUSTRIES
(b)Name of the Company / Organisation PARAS INDUSTRIES
(c)Registered Address D-4, SAYONA ESTATEM MEMCO, NARODA ROAD,,AHMEDABAD,Sirohi,Rajasthan-380025
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SHAILESH PATEL
(b)Designation (Owner/ Partner/ CEO) PARTNER
(c)Address DIST-E-67, RIICO GROWTH CENTER,,PHASE-II, ABU ROAD,,Sirohi,Sirohi,Rajasthan-307026
(d)Pin code 307026
(e)E-mail parasindustries67@gmail.com
(f)STD Code. 79(f)Telephone No. 22147550
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/86809/2018
(d)Master Proposal Number(Single Window) SW/132283/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. DIST-E-67, RIICO GROWTH CENTER,,PHASE-II, Abu Road
(b)Pincode 307026
(c)Bounded Latitudes (North)
From
Degree 24252318
Minutes
Second
From
Degree 24252550
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72421065
Minutes
Second
From
Degree 72421370
Minutes
Second
(e)Survey of India Topo Sheet No. G43S7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 241
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.6
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanSirohiAbu Road
(2.)SikkimManganManganSalim Pakyel
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/388/2018-IA-II(I)
(b)Date of Apply of TOR 30 Nov 2018
(c)Date of Issue of TOR / Standard ToR 04 Jan 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is located in the Notified Industrial
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)MSRL Open Vessel125 kl
(2.)Reactor Vessel (SS)110 kl
(3.)Reactor Vessel (SS)17 kl
(4.)Cast Iron Reactor18 kl
(5.)FRP Vessel128 kl
(6.)FRP Vessel128 kl each
(7.)Reactor Vessel (SS)18 kl
(8.)Reactor Vessel (SS)17 kl
(9.)Cast Iron Reactor18 kl
(10.)MSRL Open Vessel220 kl
(11.)Storage Vessel Tank, MS515 kl x 3 nos 10 kl x 2 nos.
(12.)Storage Vessel Tank , HDPE210 kl each
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2, Naphthol, 6,8 Dia Sulphonic Acid (G. Salt)12OthersMTMRoad
(2.)4,4 Dinitro Stilbene, 2,2 Disulphonic Acid12OthersMTMRoad
(3.)Meta Ureido Aniline (MUA)8OthersMTMRoad
(4.)4 Sulpho Ortho Amino Benzoic Acid10OthersMTMRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.72
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.07
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1048.81
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1048.81
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sodium cynate96Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(2.)Potassium Chloride39.72Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(3.)Ortho nitrotoluene48Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(4.)Caustic Soda38.4Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(5.)HCl 30%19.2Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(6.)Caustic Flakes13.39Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(7.)B – Napthol99.31Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(8.)Oleum 23%79.44Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(9.)PNTOSA216.57Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(10.)Sulfuric Acid206.74Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
(11.)Soda ash35.28Tons per Annumopen MarketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube1431480
(2.)NOxMicro Gram per Meter Cube25102480
(3.)PM10Micro Gram per Meter Cube644663100
(4.)OthersHCLMicro Gram per Meter Cube181214.09-
(5.)PM2.5Micro Gram per Meter Cube44254360
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.947.148.58.5
(2.)TDSmg/l24008105002000
(3.)Chloridesmg/l28018010001000
(4.)TSSmg/l10.10.51
(5.)Total Hardnessmg/l1220400300600
(6.)Fluoridemg/l2.61.511.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.8A
(2.)CODmg/l66A
(3.)BODmg/l33A
(4.)DOmg/l55A
(5.)OthersTDSmg/l610610A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.249.7Industrial zone 75 Silence Zone 50
(2.)Leq(Night)A-weighted decibels(dB(A))62.334.1Industrial zone 70 Silence Zone 40
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH87.5
(2.)N(Nitrogen)Percent0.280.2
(3.)P(Phosphorus)Milligram per Kilogram0.080.05
(4.)K(Potassium)Milligram per Kilogram0.180.14
(5.)Electric ConductivityMillisiemens per Centimetre210130
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 12
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 12
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater120.5Copy of Permission LetterPipelineOthersPipelinesRIICO Book 9930 Apr 201912
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Process44ETPOthersMEE0.04
(2.)Boiler0.50.5ETPOthersMEE0.00.5
(3.)Washing & Scrubbing2.272.27ETPOthersMEE0.02.27
(4.)Domestic0.80.8Soak PitOthersSoak Pit0.00.8
(5.)Industrial cooling0.50.5ETPOthersMEE0.00.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8.07
(b)Total Discharged Water (Kilolitre per Day) 8.07
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.1Tons0RoadAuthorized Recyclers
(3.)Carbon WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.7Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Discarded containers/barriers/bagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons0RoadAuthorized Recyclers
(5.)GypsumHazardous Waste (as per Hazardous and Other Waste Management rules 2016)52Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube12.0100.1612.7680
(2.)NOxMicrogram per Meter Cube23100.3924.0980
(3.)PM2.5Microgram per Meter Cube44100.064560
(4.)PM10Microgram per Meter Cube59.8100.0859.88100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerAgro Waste130.2PM1040
(2.)DG SetHSD50.2SO235
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source JVVNL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.4879
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 0.48792
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.4879
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : No Other Land 0.0
    Total (ha.) 0.4879
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Plant Area0.48
Total (ha.) 0.48
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0.0NA
(2.)WLSNA0.0NA
(3.)NPANA0.0NA
(4.)ESZsNA0.0NA
(5.)CorridorsNA0.0NA
(6.)ESAsNA0.0NA
(7.)Wildlife CorridorsNA0.0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0.0NA
(2.)ForestNA0.0NA
(3.)Archaeological SitesNA0.0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 6
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 7
(d)Temporary Employment- During Operation 7
(e)No. of working days 280
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.16
(b)Percentage of Total Project Area 32.79
(c)No. of Plants to be Planted 1500
(d)Funds Allocated for Plantation 1
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject proponent will provide 2% CER of the project cost. Green belt development will benefit the biological environment
(2.)SocialProject Project will contribute towards Occupational health, contribution in education, medicinal aids, scholarship aids
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc.
(iii)Address Green Empire (Anupushpam), above axix Bank, near yash complex, Gotri main road, Vadodara, 390021
(iv)Mobile No. 9311768924
(v)Landline No. 0265237126
(vi)Email Id bsranaenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSHAILESH PATEL
DesignationPARTNER
Name of Company (Applicant Name should not be given here)PARAS INDUSTRIES
AddressD-4, SAYONA ESTATEM MEMCO, NARODA ROAD,
Print