Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Impact Assessment and Environmental Management Plan for Sondur Reservoir Project, District Dhamtari, Chhattishgarh
(b)Name of the Company / Organisation WATER MANAGEMENT DIVISION RUDRI
(c)Registered Address Executive Engineer Water Management Division Rudri Code No. 038 District Dhamtari (Chhattisgarh),,Dhamtari,Chhattisgarh-493770
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Kumar Thakur
(b)Designation (Owner/ Partner/ CEO) ExecutiveEngineer
(c)Address Water Management Division Rudri Code No.038 District Dhamtari Chattisgarh,,Dhamtari,Dhamtari,Chhattisgarh-493770
(d)Pin code 493770
(e)E-mail sondurproject@gmail.com
(f)STD Code. 7722(f)Telephone No. 237956
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/RIV/131439/2017
(d)Master Proposal Number(Single Window) SW/131431/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Nil
(b)Pincode 493778
(c)Bounded Latitudes (North)
From
Degree 29.1900
Minutes
Second
From
Degree 82.104722
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 20.288611
Minutes
Second
From
Degree 81.824722
Minutes
Second
(e)Survey of India Topo Sheet No. 64 L/3, 64 L/4, 64 H/15 and 64 H/17
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 476
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/23/2017-IA-I
(b)Date of Apply of TOR 24 Jul 2017
(c)Date of Issue of TOR / Standard ToR 06 Sep 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site, Village: Mechka, Tehsil: Nagri, District Dhamtari
State :Chhattisgarh
District :Dhamtari
Tehsil :Nagri
Village :Mechka
50Land Compensation amount, canal blocks the nallah due to which the water does not enter to their village and their land and villages were flooded due to the project and then the land in Saloni villOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SONDUR RESERVOIR PROJECT”12260 ha.CCA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)SONDUR RESERVOIR PROJECT12260HectaresOthersRiver
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 Dec 2019
(iv)Valid Upto 14 Dec 2019
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 429.95
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.22
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 350.735
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12260
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 12260
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water12260HectaresRiverRoad1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Aug 2018
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube15.57.215.180
(2.)PM2.5Micro Gram per Meter Cube35.316.634.860
(3.)SO2Micro Gram per Meter Cube7.207.080
(4.)PM10Micro Gram per Meter Cube44.529.844100
    14.2.     No. of Ground Water monitoring locations : 29
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l70.35452501000
(2.)TDSmg/l462.40322.805002000
(3.)Total Hardnessmg/l285.20146.30200600
(4.)Fluoridemg/l0.820.2311.5
(5.)Heavy MetalsSulphatesmg/l34.8019.3200400
(6.)TSSmg/l0000
(7.)pHNA7.946.706.58.5
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.27.6C
(2.)BODmg/l3.21.6C
(3.)CODmg/l6.93.3C
(4.)DOmg/l8.27.2C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.845.365
(2.)Leq(Night)A-weighted decibels(dB(A))46.332.255
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram155.580.1
(2.)P(Phosphorus)Milligram per Kilogram10.37.35
(3.)pH8.127.23
(4.)Electric ConductivityMillisiemens per Centimetre428218
(5.)K(Potassium)Milligram per Kilogram250.8175.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.90 To 20.80
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.70 To 17.65
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface201Copy of Permission LetterCanalOthersSondur Feeder Canal for worksNA14 Dec 201920
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAGreen Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste13.5Tons1RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0000.160
(2.)SO2Microgram per Meter Cube0000.180
(3.)PM10Microgram per Meter Cube37.614.7542.75100
(4.)NOxMicrogram per Meter Cube0000.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 25
(b)Source Chhattisgarh State Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x15KVA
(e)Stack Height (in m) 2
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 2025.14
(b)Private Land (ha.) 304.43
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2329.57
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23255
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 859
(e)Settlements (ha.) 769
(f)Industrial (ha.) 0
(g)Forest (ha.) 31190
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Dry River Bed 616
    Total (ha.) 56689
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersCCA12260
Total (ha.) 12260
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)Wildlife CorridorsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)WLSSitanadi Sanctuary1529.70 ha lies in submergence area
(5.)NPANA0NA
(6.)ESZsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve forest land1550.52 under territorial forest
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 343487
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1249.35
(b)Land yet to be acquired(Ha) 1080.22
(c)Status of Land acquisition if not acquired 529.70 ha under Sitanadi WLS and 550.52 ha. under
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 8
(b)No. of Households 622
(c)No. of PDFs (Project Displaced Families) 302
(d)No. of PAFs (Project Affected Families) 302
(e)Funds Allocated for R&R(in INR) (in Lacs) 796.73
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Gaur, Wild water buffalo, Wolf, Sloth Bear, Leopard, Tiger, Giant squirrel and Chousingha
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 21.60 Crores
(iii)Period of Implementation 2 years during construction and 10 years during op
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sondur river
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 90
(d)Temporary Employment- During Operation 0
(e)No. of working days 240
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 25
(b)Percentage of Total Project Area 1.07
(c)No. of Plants to be Planted 2000
(d)Funds Allocated for Plantation 300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Sondur River
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Barrage26.703231.25529.70012260012260
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %00NA
(2.)75 %00NA
(3.)90 %00NA
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 264000
(c) Utilized for Construction (in cubic meter)264000
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)4.38
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 24
(c) Name of the umbrella Fish Species (Scientific Name)NA
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Monsoon143.12575
(2.)Lean00
(3.)Non-Lean Non-Monsoon00
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 49
(ii)Name of the EIA Consultant Enviro Infra Solutions Pvt. Ltd.
(iii)Address 301,302 & 305, SRBC Building, Sector 9, Vasundhara, Ghaziabad, 201012
(iv)Mobile No. 9818922344
(v)Landline No. 0120415118
(vi)Email Id eis@enviroinfrasolutions.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 13 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Raise LetterSubmit Stage I FC for the forest land involved in the project as per the letter attached. 01 Jun 2020
2. ADS Reply LetterCompliance of additional conditions to be fulfilled prior to grant EC sought by MoEF&CC on dated 27.04.2020. 12 May 2020
3. ADS Raise LetterCompliance to the above letter shall be submitted online along with the Undertaking 27 Apr 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Kumar Thakur
DesignationExecutiveEngineer
Name of Company (Applicant Name should not be given here)WATER MANAGEMENT DIVISION RUDRI
AddressExecutive Engineer Water Management Division Rudri Code No. 038 District Dhamtari (Chhattisgarh)
Print