1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Pooja Chemical Industries | (b)Name of the Company / Organisation | POOJA CHEMICAL INDUSTRIES | (c)Registered Address | Plot No. 702/2, GIDC Estate, Ankleshwar, DIst.: Bharuch,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vinubhai Nagjibhai Malani | (b)Designation (Owner/ Partner/ CEO) | Proprietor | (c)Address | 402/6/A, Alkapuri Society, GIDC New Colony, Ankleshwar,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | poojachemind@gmail.com | (f)STD Code. | 2646(f)Telephone No. | 220466 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | B1 | Reason for Applying at Ministry | general | (c)Proposal Number | IA/GJ/IND2/130649/2018 | (d)Master Proposal Number(Single Window) | SW/130593/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 702/2 | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21.61444444 | Minutes | | Second | | From | | Degree | 21.61472222 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.02000000 | Minutes | | Second | | From | | Degree | 73.02027778 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 38.25 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 46 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | SIA/GJ/116912/2018 | (b)Date of Apply of TOR | 29 Nov 2018 | (c)Date of Issue of TOR / Standard ToR | 29 Jan 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project is located in notified industrial area, pu | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Vessel | 25 kl | 1 No. | (2.) | Vessel | 10 kl | 1 No. | (3.) | Trey dryer | 200 Trey | | (4.) | Pulverizer | --- | 2 Nos. | (5.) | Filter Press | 36” x 36” | 1 No. | (6.) | Hot Air Generator | --- | 1 No. | (7.) | Boiler | 600 kg/hr. | 1 No. | (8.) | Reactor | 3 kl | 1 No. | (9.) | Vessel | 3 kl | 1 No. | (10.) | Ice Cutter | --- | 1 No. | (11.) | Blender | --- | 1 No. | (12.) | ETP filter press | 18” x 18” | 1 No. | (13.) | Centrifuge | --- | 1 No. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Direct Black – G And /OR | 300 | Tons per Annum | | Road | | (2.) | Acid Patent Blue – V And /OR | 300 | Tons per Annum | | Road | | (3.) | Acid Brown – FBR And /OR | 300 | Tons per Annum | | Road | | (4.) | Acid Brilliant Blue -FF And /OR | 300 | Tons per Annum | | Road | | (5.) | Acid Black – WA And /OR | 300 | Tons per Annum | | Road | | (6.) | Leather Black CB And /OR | 300 | Tons per Annum | | Road | | (7.) | Acid Brown – WG And /OR | 300 | Tons per Annum | | Road | | (8.) | Acid Yellow – 23 And /OR | 300 | Tons per Annum | | Road | | (9.) | Acid Black – MSRL And /OR | 300 | Tons per Annum | | Road | | (10.) | Acid Brown – RD And /OR | 300 | Tons per Annum | | Road | | (11.) | Acid Orange – II And /OR | 300 | Tons per Annum | | Road | | (12.) | Bismark Brown – G And /OR | 300 | Tons per Annum | | Road | | (13.) | Chrysoidine – Y And /OR | 300 | Tons per Annum | | Road | | (14.) | Acid Patent Blue – AS And /OR | 300 | Tons per Annum | | Road | | (15.) | Acid Havana – 2RL And /OR | 300 | Tons per Annum | | Road | | (16.) | Acid Black – 10 BX And /OR | 300 | Tons per Annum | | Road | | (17.) | Acid Black – MT And /OR | 300 | Tons per Annum | | Road | | (18.) | Dark Green – B And /OR | 300 | Tons per Annum | | Road | | (19.) | Acid Red – 87 And /OR | 300 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Sep 2018 | (iv)Valid Upto | 24 Jun 2023 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.4 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.0435 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.008 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.0326 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 13518.12 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 13518.12 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Aniline | 232.20 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (2.) | SPCP | 90.00 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (3.) | Sulphanilic Acid | 237.00 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (4.) | Acid Yellow – 73 (Flouroscine) | 21.42 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (5.) | Liquid Bromine | 64.24 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (6.) | Additives | 104.49 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (7.) | Diethyl Aniline | 158.56 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (8.) | Ethyl Benzyl Aniline | 192.00 | Tons per Annum | | Local | Road | | 1.20 | Linkage | | Copy of Linkage | (9.) | Lead Peroxide | 75.60 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (10.) | Soda ash | 989.15 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (11.) | Hydrochloric Acid | 2036.50 | Tons per Annum | | Local | Road | | 1.70 | Linkage | | Copy of Linkage | (12.) | H Acid | 545.90 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (13.) | Beta Naphthol | 255.60 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (14.) | MPD | 125.40 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (15.) | Anthanilic Acid | 98.70 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (16.) | Chromium Fluoride | 49.20 | Tons per Annum | | Local | Road | | 1.20 | Linkage | | Copy of Linkage | (17.) | NaOH | 51.00 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (18.) | Benzaldehyde Disulfonic Acid | 262.84 | Tons per Annum | | Local | Road | | 1.30 | Linkage | | Copy of Linkage | (19.) | Sodium Sulfate | 393.60 | Tons per Annum | | Local | Road | | 1.70 | Linkage | | Copy of Linkage | (20.) | Dichromate | 30.00 | Tons per Annum | | Local | Road | | 1.20 | Linkage | | Copy of Linkage | (21.) | Ethyl Benzyl Aniline Sulfonic Acid | 225.39 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (22.) | Natural Gas | 41.34 | Others | SCM/Day | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (23.) | Para Nitro Aniline | 212.07 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (24.) | Sodium Nitrite | 756.30 | Tons per Annum | | Local | Road | | 1.20 | Linkage | | Copy of Linkage | (25.) | NaNO2 | 12.00 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (26.) | DASA | 142.20 | Tons per Annum | | Local | Road | | 1.30 | Linkage | | Copy of Linkage | (27.) | Salt | 3038.42 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (28.) | Sodium Sulfide | 121.50 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (29.) | Sodium Bi Carbonate | 63.00 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (30.) | Acetic Acid | 141.20 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (31.) | Oxalic Acid | 224.11 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (32.) | Ortho Benzaldehyde Sulfonic Acid | 81.07 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (33.) | Caustic lye | 386.88 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (34.) | 6-Nitro | 257.40 | Tons per Annum | | Local | Road | | 1.30 | Linkage | | Copy of Linkage | (35.) | Basic Chromium Sulphate | 241.50 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (36.) | Salicylic acid | 28.2 | Tons per Annum | | Local | Road | | 1.60 | Linkage | | Copy of Linkage | (37.) | Caustic Flakes | 197.10 | Tons per Annum | | Local | Road | | 1.40 | Linkage | | Copy of Linkage | (38.) | Resorcinol | 155.70 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (39.) | Picramic Acid | 50.40 | Tons per Annum | | Local | Road | | 1.50 | Linkage | | Copy of Linkage | (40.) | Sodium Nephthalene | 228.00 | Tons per Annum | | Local | Road | | 1.30 | Linkage | | Copy of Linkage | (41.) | Liq. Ammonia | 90.00 | Tons per Annum | | Local | Road | | 1.30 | Linkage | | Copy of Linkage | (42.) | Sulphuric Acid | 311.58 | Tons per Annum | | Local | Road | | 1.6 | Linkage | | Copy of Linkage | (43.) | Meta Phenyl Aniline | 187.80 | Tons per Annum | | Local | Road | | 1.70 | Linkage | | Copy of Linkage | (44.) | Sodium Acetate | 41.53 | Tons per Annum | | Local | Road | | 1.20 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 30.52 | 18.37 | 30.35 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 48.59 | 21.84 | 48.37 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 76.25 | 55.90 | 76.09 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 36.24 | 21.59 | 36.14 | 60 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 4422 | 1139 | 500 | 2000 | (2.) | pH | | | Others | pH Unit | 8.55 | 7.25 | 6.5 | 8.5 | (3.) | Heavy Metals | | Iron | mg/l | | 0.92 | 0.10 | 0.3 | 1 | (4.) | TSS | | | NA | | 00 | 000 | 00 | 00 | (5.) | Total Hardness | | | mg/l | | 1600 | 180 | 300 | 600 | (6.) | Chlorides | | | mg/l | | 1557.54 | 226.73 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 0.80 | 0.10 | 1 | 0.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 3.10 | 2.40 | A | (2.) | BOD | | mg/l | | 220 | 5 | A | (3.) | COD | | mg/l | | 1000 | 24 | A | (4.) | pH | | Others | pH Unit | 8.39 | 7.18 | A | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 53 | 44 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 70 | 54 | 75 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | | | 0 | 0 | (2.) | Electric Conductivity | Others | µmhos/cm | 225 | 183 | (3.) | pH | | | 7.95 | 7.75 | (4.) | N(Nitrogen) | Kilogram per hectare | | 2.39 | 0.27 | (5.) | K(Potassium) | Others | gm/kg | 0.16 | 0.03 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water supply | 9.25 | 1.36 | Copy of Permission Letter | Pipeline | | Others | GIDC Water Supply | NTA/ANK/DEE(WS)/1190 | 18 Jun 2019 | 10 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process + Washing + Boiler | 4.00 | 4 | ETP | Others | Finally discharged to CETP-ETL | 00 | 4.00 | (2.) | Domestic | 1.15 | 0 | --- | Others | soak pit/septic system | 00 | 1.15 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 5.15 | (b)Total Discharged Water (Kilolitre per Day) | 5.15 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15.80 | Tons | 10.5 | Road | | Others | Reprocess/Blend with finished product. | (2.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.20 | Tons | 9.50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Process residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 38 | Tons | 9.5 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 34.12 | 8.28 | 0.01 | 40.22 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 0 | (3.) | SO2 | | Microgram per Meter Cube | 27.24 | 8.28 | 0.04 | 27.28 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 66.58 | 8.28 | 0.02 | 72.80 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler - 600 kg/hr. | Natural gas | 10 | 0.5 | Others | PM, SO2, NOx | PM < 150 mg/Nm3, SO2 < 100 ppm, NOx < 50 ppm | (2.) | Hot Air Generator | Natural gas | 10 | 0.5 | Others | PM, SO2, NOx | PM, 150 mg/Nm3, SO2 < 100 ppm, NOx < 50 ppm | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 50 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Not Applicable | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0.125 | Total Land (ha.) | 0.125 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.0040 | (b)Waste/Barren Land (ha.) | 0.0014 | (c)Grazing/ Community Land (ha.) | 0.00 | (d)Surface Water Bodies (ha.) | 0.0006 | (e)Settlements (ha.) | 0.0026 | (f)Industrial (ha.) | 0.00 | (g)Forest (ha.) | 0.00 | (h)Mangroves (ha.) | 0.00 | (i)Marine Area (ha.) | 0.00 | (j)Others (ha.) : Scrub land/Rand land/Follow land/Crop land | 0.0225 | Total (ha.) | 0.0311 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Total Area | 0.12 | Total Area = 0.125 ha | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Not applicable | 0 | Not applicable | (2.) | ESAs | Not applicable | 0 | Not applicable | (3.) | ESZs | Not applicable | 0 | Not applicable | (4.) | Corridors | Not applicable | 0 | Not applicable | (5.) | WLS | Not applicable | 0 | Not applicable | (6.) | Wildlife Corridors | Not applicable | 0 | Not applicable | (7.) | Critically Polluted Area | Ankleshwar GIDC | 0 | Project is located within GIDC | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Not Applicable | 0 | Not Applicable | (2.) | Archaeological Sites | | Not Applicable | 0 | Not Applicable | (3.) | Defence Installations | | Not Applicable | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.12 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | GIDC Water Reservoir | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narmada River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 5.19 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 10 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 30 | (f)Total Manpower | 10 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.05 | (b)Percentage of Total Project Area | 40.00 | (c)No. of Plants to be Planted | 20 | (d)Funds Allocated for Plantation | 32500 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation, CSR activities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | High Court Stay Order | (ii)Name of the EIA Consultant | Environ | (iii)Address | 1103, 1104, Ganesh glory, Godrej Garden City Road, Jagat Pore, S. G. Highway, Ahmedabad. | (iv)Mobile No. | 9825926676 | (v)Landline No. | 07777777 | (vi)Email Id | info_environ@environindia.net | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 09 May 2029 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) TOR granted by the SEIAA as Category B Project, Now PP submitted the Project in Category A Project. Please clarify.
(ii) Please submit plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area.
(iii) In S. No. 6 of Form 2, details of TOR/EC mentioned NIL, however it is case of expansion.
(iv) This is expansion case however PP has not uploaded Certified compliance report from regional Office MoEFCC.
(v) All old CTOs not uploaded to verify the violation, if any done by PP.
(vi) Details of Industrial Estate and its documents are not uploaded on Form 2.
(vii) In S. No. 2 of Form 2, the Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency has not been submitted.
(viii) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(ix) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Reports. The EIA/EMP Reports shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submit the application as per the provisions of the EIA Notification, 2006. | 07 Jan 2020 | 2. | NA | The correction have been made as per the instruction received | 15 Jan 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | |
|