Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Pooja Chemical Industries
(b)Name of the Company / Organisation POOJA CHEMICAL INDUSTRIES
(c)Registered Address Plot No. 702/2, GIDC Estate, Ankleshwar, DIst.: Bharuch,,Bharuch,Gujarat-393002
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinubhai Nagjibhai Malani
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address 402/6/A, Alkapuri Society, GIDC New Colony, Ankleshwar,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail poojachemind@gmail.com
(f)STD Code. 2646(f)Telephone No. 220466
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B1
   Reason for Applying at Ministry general
(c)Proposal Number IA/GJ/IND2/130649/2018
(d)Master Proposal Number(Single Window) SW/130593/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 702/2
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.61444444
Minutes
Second
From
Degree 21.61472222
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.02000000
Minutes
Second
From
Degree 73.02027778
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 38.25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 46
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/116912/2018
(b)Date of Apply of TOR 29 Nov 2018
(c)Date of Issue of TOR / Standard ToR 29 Jan 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located in notified industrial area, pu
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Vessel25 kl1 No.
(2.)Vessel10 kl1 No.
(3.)Trey dryer200 Trey
(4.)Pulverizer---2 Nos.
(5.)Filter Press36” x 36”1 No.
(6.)Hot Air Generator---1 No.
(7.)Boiler600 kg/hr.1 No.
(8.)Reactor3 kl1 No.
(9.)Vessel3 kl1 No.
(10.)Ice Cutter---1 No.
(11.)Blender---1 No.
(12.)ETP filter press18” x 18”1 No.
(13.)Centrifuge---1 No.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Direct Black – G And /OR300Tons per AnnumRoad
(2.)Acid Patent Blue – V And /OR300Tons per AnnumRoad
(3.)Acid Brown – FBR And /OR300Tons per AnnumRoad
(4.)Acid Brilliant Blue -FF And /OR300Tons per AnnumRoad
(5.)Acid Black – WA And /OR300Tons per AnnumRoad
(6.)Leather Black CB And /OR300Tons per AnnumRoad
(7.)Acid Brown – WG And /OR300Tons per AnnumRoad
(8.)Acid Yellow – 23 And /OR300Tons per AnnumRoad
(9.)Acid Black – MSRL And /OR300Tons per AnnumRoad
(10.)Acid Brown – RD And /OR300Tons per AnnumRoad
(11.)Acid Orange – II And /OR300Tons per AnnumRoad
(12.)Bismark Brown – G And /OR300Tons per AnnumRoad
(13.)Chrysoidine – Y And /OR300Tons per AnnumRoad
(14.)Acid Patent Blue – AS And /OR300Tons per AnnumRoad
(15.)Acid Havana – 2RL And /OR300Tons per AnnumRoad
(16.)Acid Black – 10 BX And /OR300Tons per AnnumRoad
(17.)Acid Black – MT And /OR300Tons per AnnumRoad
(18.)Dark Green – B And /OR300Tons per AnnumRoad
(19.)Acid Red – 87 And /OR300Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Sep 2018
(iv)Valid Upto 24 Jun 2023
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.4
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.0435
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.008
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.0326
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 13518.12
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 13518.12
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aniline232.20Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(2.)SPCP90.00Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(3.)Sulphanilic Acid237.00Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(4.)Acid Yellow – 73 (Flouroscine)21.42Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(5.)Liquid Bromine64.24Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(6.)Additives104.49Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(7.)Diethyl Aniline158.56Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(8.)Ethyl Benzyl Aniline192.00Tons per AnnumLocalRoad1.20 LinkageCopy of Linkage
(9.)Lead Peroxide75.60Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(10.)Soda ash989.15Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(11.)Hydrochloric Acid2036.50Tons per AnnumLocalRoad1.70 LinkageCopy of Linkage
(12.)H Acid545.90Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(13.)Beta Naphthol255.60Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(14.)MPD125.40Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(15.)Anthanilic Acid98.70Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(16.)Chromium Fluoride49.20Tons per AnnumLocalRoad1.20 LinkageCopy of Linkage
(17.)NaOH51.00Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(18.)Benzaldehyde Disulfonic Acid262.84Tons per AnnumLocalRoad1.30 LinkageCopy of Linkage
(19.)Sodium Sulfate393.60Tons per AnnumLocalRoad1.70 LinkageCopy of Linkage
(20.)Dichromate30.00Tons per AnnumLocalRoad1.20 LinkageCopy of Linkage
(21.)Ethyl Benzyl Aniline Sulfonic Acid225.39Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(22.)Natural Gas41.34OthersSCM/DayLocalRoad1.40 LinkageCopy of Linkage
(23.)Para Nitro Aniline212.07Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(24.)Sodium Nitrite756.30Tons per AnnumLocalRoad1.20 LinkageCopy of Linkage
(25.)NaNO212.00Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(26.)DASA142.20Tons per AnnumLocalRoad1.30 LinkageCopy of Linkage
(27.)Salt3038.42Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(28.)Sodium Sulfide121.50Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(29.)Sodium Bi Carbonate63.00Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(30.)Acetic Acid141.20Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(31.)Oxalic Acid224.11Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(32.)Ortho Benzaldehyde Sulfonic Acid81.07Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(33.)Caustic lye386.88Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(34.)6-Nitro257.40Tons per AnnumLocalRoad1.30 LinkageCopy of Linkage
(35.)Basic Chromium Sulphate241.50Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(36.)Salicylic acid28.2Tons per AnnumLocalRoad1.60 LinkageCopy of Linkage
(37.)Caustic Flakes197.10Tons per AnnumLocalRoad1.40 LinkageCopy of Linkage
(38.)Resorcinol155.70Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(39.)Picramic Acid50.40Tons per AnnumLocalRoad1.50 LinkageCopy of Linkage
(40.)Sodium Nephthalene228.00Tons per AnnumLocalRoad1.30 LinkageCopy of Linkage
(41.)Liq. Ammonia90.00Tons per AnnumLocalRoad1.30 LinkageCopy of Linkage
(42.)Sulphuric Acid311.58Tons per AnnumLocalRoad1.6 LinkageCopy of Linkage
(43.)Meta Phenyl Aniline187.80Tons per AnnumLocalRoad1.70 LinkageCopy of Linkage
(44.)Sodium Acetate41.53Tons per AnnumLocalRoad1.20 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube30.5218.3730.3580
(2.)NOxMicro Gram per Meter Cube48.5921.8448.3780
(3.)PM10Micro Gram per Meter Cube76.2555.9076.09100
(4.)PM2.5Micro Gram per Meter Cube36.2421.5936.1460
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l442211395002000
(2.)pHOtherspH Unit8.557.256.58.5
(3.)Heavy MetalsIronmg/l0.920.100.31
(4.)TSSNA000000000
(5.)Total Hardnessmg/l1600180300600
(6.)Chloridesmg/l1557.54226.732501000
(7.)Fluoridemg/l0.800.1010.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l3.102.40A
(2.)BODmg/l2205A
(3.)CODmg/l100024A
(4.)pHOtherspH Unit8.397.18A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))534470
(2.)Leq(Day)A-weighted decibels(dB(A))705475
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)00
(2.)Electric ConductivityOthersµmhos/cm225183
(3.)pH7.957.75
(4.)N(Nitrogen)Kilogram per hectare2.390.27
(5.)K(Potassium)Othersgm/kg0.160.03
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water supply9.251.36Copy of Permission LetterPipelineOthersGIDC Water SupplyNTA/ANK/DEE(WS)/119018 Jun 201910
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process + Washing + Boiler4.004ETPOthersFinally discharged to CETP-ETL004.00
(2.)Domestic1.150---Otherssoak pit/septic system001.15
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5.15
(b)Total Discharged Water (Kilolitre per Day) 5.15
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15.80Tons10.5RoadOthersReprocess/Blend with finished product.
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.20Tons9.50RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Process residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)38Tons9.5RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube34.128.280.0140.2280
(2.)PM2.5Microgram per Meter Cube0000.10
(3.)SO2Microgram per Meter Cube27.248.280.0427.2880
(4.)PM10Microgram per Meter Cube66.588.280.0272.80100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler - 600 kg/hr.Natural gas100.5OthersPM, SO2, NOxPM < 150 mg/Nm3, SO2 < 100 ppm, NOx < 50 ppm
(2.)Hot Air GeneratorNatural gas100.5OthersPM, SO2, NOxPM, 150 mg/Nm3, SO2 < 100 ppm, NOx < 50 ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Not Applicable
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.125
    Total Land (ha.) 0.125
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0040
(b)Waste/Barren Land (ha.) 0.0014
(c)Grazing/ Community Land (ha.) 0.00
(d)Surface Water Bodies (ha.) 0.0006
(e)Settlements (ha.) 0.0026
(f)Industrial (ha.) 0.00
(g)Forest (ha.) 0.00
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : Scrub land/Rand land/Follow land/Crop land 0.0225
    Total (ha.) 0.0311
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Area0.12Total Area = 0.125 ha
Total (ha.) 0.12
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANot applicable0Not applicable
(2.)ESAsNot applicable0Not applicable
(3.)ESZsNot applicable0Not applicable
(4.)CorridorsNot applicable0Not applicable
(5.)WLSNot applicable0Not applicable
(6.)Wildlife CorridorsNot applicable0Not applicable
(7.)Critically Polluted AreaAnkleshwar GIDC0Project is located within GIDC
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0Not Applicable
(2.)Archaeological SitesNot Applicable0Not Applicable
(3.)Defence InstallationsNot Applicable0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.12
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area GIDC Water Reservoir
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 5.19
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 30
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.05
(b)Percentage of Total Project Area 40.00
(c)No. of Plants to be Planted 20
(d)Funds Allocated for Plantation 32500
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation, CSR activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High Court Stay Order
(ii)Name of the EIA Consultant Environ
(iii)Address 1103, 1104, Ganesh glory, Godrej Garden City Road, Jagat Pore, S. G. Highway, Ahmedabad.
(iv)Mobile No. 9825926676
(v)Landline No. 07777777
(vi)Email Id info_environ@environindia.net
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 09 May 2029
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) TOR granted by the SEIAA as Category B Project, Now PP submitted the Project in Category A Project. Please clarify. (ii) Please submit plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (iii) In S. No. 6 of Form 2, details of TOR/EC mentioned NIL, however it is case of expansion. (iv) This is expansion case however PP has not uploaded Certified compliance report from regional Office MoEFCC. (v) All old CTOs not uploaded to verify the violation, if any done by PP. (vi) Details of Industrial Estate and its documents are not uploaded on Form 2. (vii) In S. No. 2 of Form 2, the Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency has not been submitted. (viii) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. (ix) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Reports. The EIA/EMP Reports shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submit the application as per the provisions of the EIA Notification, 2006. 07 Jan 2020
2.NAThe correction have been made as per the instruction received 15 Jan 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA