Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kakra-Panna Limestone mine
(b)Name of the Company / Organisation JAYKAYCEM CENTRAL LIMITED
(c)Registered Address Kamla Tower, Kanpur, UP,,Kanpur Nagar,Chhattisgarh-208001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri Anil Badgotri
(b)Designation (Owner/ Partner/ CEO) Unit Head
(c)Address H.No. 253, Shashi Kunj, Peptech City, Sohawal Mod,,Satna,,Satna,Madhya Pradesh-485001
(d)Pin code 485001
(e)E-mail jkamanganj@gmail.com
(f)STD Code. 755(f)Telephone No. 2442070
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/MIN/130137/2016
(d)Master Proposal Number(Single Window) SW/130132/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 66,99,101,102,103,104,105,106,107,108,109,124,125,
(b)Pincode 488441
(c)Bounded Latitudes (North)
From
Degree 24.32961111
Minutes
Second
From
Degree 24.37091667
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.93750000
Minutes
Second
From
Degree 79.99388889
Minutes
Second
(e)Survey of India Topo Sheet No. 55P/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 323
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.06
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratRajkotRajkotNearby village Bharudi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/190/2016-IA.II(M)
(b)Date of Apply of TOR 10 Sep 2016
(c)Date of Issue of TOR / Standard ToR 06 Jul 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0.250
panchayat bhawan
State :Madhya Pradesh
District :Panna
Tehsil :Amanganj
Village :Devra
222Action Plan And Budget Pertins To Issues Raised During The Public During S.No. Name & Address (Shri) Raised issues Action Plan Budget 1 Smt Monika Tiwari Sarpanch Village- Devra (MP) We are thanOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Sub-grade mineral0.58 Million TPA
(2.)limestone4.08 million TPA
(3.)OB/Top soil/Waste1.61 million TPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)OB/Top soil/Waste1.61OthersMillion TPARoad
(2.)Limestone4.08OthersMillion TPARoad
(3.)sub-grade mineral0.58OthersMillion TPARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. na
(vi)Application No. na
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 572.58
(b) Funds Allocated for Environment Management (Capital) (in Crores) 33.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 30.80
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 11.92
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA0 OthersnaCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 16
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube35.915.835.760
(2.)SO2Micro Gram per Meter Cube20.17.419.980
(3.)NOxMicro Gram per Meter Cube32.610.932.180
(4.)PM10Micro Gram per Meter Cube63.834.763.4100
    14.2.     No. of Ground Water monitoring locations : 16
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.76.96.58.5
(2.)OthersNitratemg/l360.0145100
(3.)Chloridesmg/l91.362501000
(4.)Fluoridemg/l0.70.31.01.5
(5.)Heavy MetalsFemg/l0.20.050.31.0
(6.)TSSmg/l101000
(7.)TDSmg/l10763745002000
(8.)Total Hardnessmg/l62872300600
    14.3.     No. of Surface Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.107.00C
(2.)DOmg/l6.85.4C
(3.)BODmg/l102C
(4.)CODmg/l304C
(5.)OthersFemg/l0.20.05C
    14.4.     No. of Ambient Noise monitoring locations : 16
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))49.441.855
(2.)Leq(Night)A-weighted decibels(dB(A))42.839.445
    14.5.     No. of Soil Sample Monitored locations : 16
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare87.456.2
(2.)pH8.416.59
(3.)N(Nitrogen)Kilogram per hectare614.287.87
(4.)K(Potassium)Kilogram per hectare570.029.71
(5.)Electric ConductivityMillisiemens per Centimetre1.00.19
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 24
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 15
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/MIN/ORIG/2020/7959
(f)Date of Issue 03 Feb 2020
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2300.2Copy of Permission LetterPipelineTube WellCGWA/NOC/MIN/ORIG/2020/795903 Feb 202020
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic55soak pitOtherssoak pit05
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5
(b)Total Discharged Water (Kilolitre per Day) 5
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)sub grade mineralIndustrial Waste584161Tons0.50RoadOthersdump at mine site
(2.)Top soilIndustrial Waste620452Tons0.5RoadOthersdump at mine site
(3.)mine wasteIndustrial Waste186932Tons0.5RoadOthersdump at mine site
(4.)overburdenIndustrial Waste806520Tons0.5RoadOthersdump at mine site
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube25.200.750.0525.5060
(2.)PM10Microgram per Meter Cube49.600.750.5051100
(3.)NOxMicrogram per Meter Cube24.301.0305580
(4.)SO2Microgram per Meter Cube141.001429.0080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)limestone crusherNA306.0PM109.97
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3600
(b)Source captive power plant of 80 MW and WHR plant of 30 M
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 110
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1518.586
(c)Government Land (ha.) 75.754
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1594.34
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 26404
(b)Waste/Barren Land (ha.) 1007
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1220
(e)Settlements (ha.) 204
(f)Industrial (ha.) 0
(g)Forest (ha.) 8457
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : road 0
    Total (ha.) 37292
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area1280.33pit area
(2.)Othersun worked area145.85
(3.)Green belt2.25
(4.)Area for Solid Waste Management164.76
(5.)Built Up Area0.46infrastructure i.e. mine office
(6.)Safety Zone0.69Road, other use
Total (ha.) 1594.34
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA16none within 10km radius
(2.)ESAsPanna Biosphare5.50from mine
(3.)CorridorsNA16none within 10km radius
(4.)Wildlife CorridorsNA16none within 10km radius
(5.)Critically Polluted AreaNA100none within 10km radius
(6.)WLSNA16none within 10km radius
(7.)ESZsNA100none within 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA100NONE WITHIN 10KM RADIUS
(2.)Defence InstallationsNA100NONE WITHIN 10KM RADIUS
(3.)ForestPagra RF5.50West
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 220.66
(b)Land yet to be acquired(Ha) 1373.68
(c)Status of Land acquisition if not acquired To be purchased
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 764
(e)Funds Allocated for R&R(in INR) (in Lacs) 470.92
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Mouse Deer, Black Buck, Indian Gazelle, Sloth Bear, Panther or Leopard, Jungle Cat & Indian Pangolin
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 289.9 lakhs
(iii)Period of Implementation 10year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. s. no. / vpra/ma.chi/8847
(iii)Date of issue 13 Dec 2019
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Devra Nalla
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ken river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.06
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 250
(e)No. of working days 300
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Total Area of Green Belt 528.20
(b)Percentage of Total Project Area 33.13
(c)No. of Plants to be Planted 992127
(d)Funds Allocated for Plantation 751.95
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe Company will continue to have among its objectives, promotion and growth of the economy through increased productivity, effective utilization of material and manpower resources and continued application of modern scientific and managerial techniques. In keeping with the national aspiration; and the company shall continue to be sensitive its social and moral responsibilities to consumers, employees, shareholders, society and the local community
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)limestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 2769016.00m3
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Mp/panna/limestone/MPLN/g-16/14-15/4140
(b)Date of Approval 04 Aug 2015
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 1594.34
(f)Approved Capacity 4089123
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 494.84
(b)Mineable Reserves (Million Ton) 395.87
(c)Extractable Reserves(Million Ton) 263.38
(d)Percent(%) of Extraction 66.53
(e)Grade of Coal /Ore /Mineral cement
(f)Stripping Ratio 1:0.19 : 1:1.559
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 57
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)11800
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1594.34
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 03 May 2016
(iii)Validity of LOI 50
(iv)Reference No. of LOI f-3-03/2016/12-1
(c)Whether Lease Deed Executed ? No
(i)Reason thereof after obtaining EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof fresh lease area
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 01
(ii)Total Area (in Hectare) 1.06
(iii)Height (in meter) 6
(iv)Quantity (in Million Cubic meter) 0.038066
(v)No. of year back fill up 02
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 49.8032
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 49.8032
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1280.332
(b)Depth (in meter) 29
(c)Volume (in Million Cubic meter) 0.03713
12.
Details of Quarry:
(a)Final Void of 1280.332 (hectare) at a Depth of 25 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 752.122
13.
Details of Transportation:
(a)In Pit/Underground to Surface DUMPER
(b)Surface to Siding/Loading dumper
(c)Transportation / Conveyor Details by road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND75.754932.2461008
(2.)AGRICULTURE LAND1518.58624885.41426404
(3.)SURFACE WATER BODIES012201220
(4.)GRAZING LAND000
(5.)FOREST LAND084578457
(6.)SETTLEMENTS0203203
TOTAL1594.3435697.6637292
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY528.20752.12201280.322
(2.)GREEN BELT0000
(3.)TOP SOIL STORAGE0000
(4.)VIRGIN AREA00145.848145.848
(5.)EXTERNAL OB DUMPS0000
(6.)ROADS000.50.5
(7.)Othersub-grade dump00164.76164.76
(8.)INTERNAL OB DUMPS0000
(9.)BUILT UP AREA (COLONY/OFFICE)002.912.91
TOTAL528.2752.122314.01801594.34
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 752.122
(d)Safety Zone(in hectare) 96.44
(e)Final Void of 1280.332 (hectare) at a Depth of 25 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1200
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 528.20
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Taluk Courts
(c)Name of the Sub Court
(d)Case No. 12/2019
(e)Orders/Directions of the court ,if any and its relevance with the proposed project no order/ direction passed by court till date
(f)Case Details Conciliation Proceeding U/s 22 of The Legal Servic
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA-0071
(ii)Name of the EIA Consultant Creative Enviro Services
(iii)Address 42, Doorsanchar Colony, Near Savoy Complex, Behind UCO Bank,, Gulmohar, Bhopal- Pincode - 462039
(iv)Mobile No. 9425009319
(v)Landline No. 0755429931
(vi)Email Id creative.bpl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 24 May 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAOn examination of the proposal, the following observations were made:- 1) Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency in not proper 2) Complete copy of Public Hearring viz..attendance, questions asked etc. are not uploaded, instead summary in hindi language is uploaded. 3) PP has uploaded copy of application for obtaining permission from Central Ground Water Authority 4) PP has uploaded incomplete copy of Conservation Plan which is not approved by the competent authority. 5) Copy of Mining Plan copy not uploaded Therefore, it is requested to submit reply on the above observations and submit the requisite documents 01 Apr 2020
2.NAOn examination of the proposal, the following observations were made:- 1) Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency in not proper 2) Complete copy of Public Hearring viz..attendance, questions asked etc. are not uploaded, instead summary in hindi language is uploaded. 3) PP has uploaded copy of application for obtaining permission from Central Ground Water Authority 4) PP has uploaded incomplete copy of Conservation Plan which is not approved by the competent authority. 5) Copy of Mining Plan copy not uploaded Therefore, it is requested to submit reply on the above observations and submit the requisite documents 01 Apr 2020
3.NAOn examination of the proposal, the following observations were made:- 1) Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency in not proper 2) Complete copy of Public Hearring viz..attendance, questions asked etc. are not uploaded, instead summary in hindi language is uploaded. 3) PP has uploaded copy of application for obtaining permission from Central Ground Water Authority 4) PP has uploaded incomplete copy of Conservation Plan which is not approved by the competent authority. 5) Copy of Mining Plan copy not uploaded Therefore, it is requested to submit reply on the above observations and submit the requisite documents 01 Apr 2020
4.NAThe correction have been made as per the instruction received 01 Apr 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Please find the ADS reply against the Observations in line with appraisal for proposal of Environment Clearance of integrated project of Kakra- Panna Limestone Mine of M/s Jaykaycem (Central) Limited with annexures of 17th meeting EAC, MoEFCC during EC, Presentation held on 28.05.2020. With Regards, Aditya Pratap Singh Jaykaycem (Central) Limited. 05 Jul 2020
2.NA

ADS

06 Jun 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri Anil Badgotri
DesignationUnit Head
Name of Company (Applicant Name should not be given here)JAYKAYCEM CENTRAL LIMITED
AddressKamla Tower, Kanpur, UP
Print