Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Manufacturing of Synthetic Resin Adhesive by M/s. Maruti Mica
(b)Name of the Company / Organisation M/S. DELL LAMINATE
(c)Registered Address Survey no. 22 , plot no.1,B/h. Pentagon Forgings,National Highway 27 (8B), Tal. Gondal,Dist. Rajkot,,Rajkot,Gujarat-360311
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhavinkumar Gandubhai Manvar
(b)Designation (Owner/ Partner/ CEO) Finance
(c)Address Survey Mo.22, plot no 1 B/H pentagon forgings, National Highway 27 , Tal. Gondal , Dist. Rajkot.,,Kotda Sangani,Rajkot,Gujarat-360311
(d)Pin code 360311
(e)E-mail delllaminate2019@gmail.com
(f)STD Code. 281(f)Telephone No. 2233
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/92387/2019
(d)Master Proposal Number(Single Window) SW/129986/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey no 22 plot no 1 B/h Pentagon Forgings Natio
(b)Pincode 360311
(c)Bounded Latitudes (North)
From
Degree 224102
Minutes
Second
From
Degree 224290
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70462533
Minutes
Second
From
Degree 70462733
Minutes
Second
(e)Survey of India Topo Sheet No. F42Q5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 583
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratRajkotKotda Sangani
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/38/2019-IA-II(I)
(b)Date of Apply of TOR 28 Jan 2019
(c)Date of Issue of TOR / Standard ToR 05 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :1.5
Hadamtala Industrial Association Hall Hadamtala Industrial Association Survey No 177 P18 Plot No 01 Rajkot Gondal NH 8B Bharudi Chowkdi Near Toll Plaza Opp 66 KV Power Station Ta Gondal Dist Rajkot 36
State :Gujarat
District :Rajkot
Tehsil :Rajkot
Village :Nearest Village Bharudi
40Issues were raised related to wastewater generation, contribution of unit for development of nearby villages, contribution of unit in education and scholarshipDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Hydraulic Press1 Tonne1 no.
(2.)DryerNA3 no.
(3.)Boiler3 Tonne1 no.
(4.)Reaction Vessel10 Tonne3 no.
(5.)Storage Tanks3 Tonne4 no.
(6.)Reactors5 Tonne, 3 Tonne, 1 Tonne3 no.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Urea Formaldehyde Resin175OthersMTMRoad
(2.)Melamine Formaldehyde Resin30OthersMTMRoad
(3.)Phenol Formaldehyde Resin75OthersMTMRoad
(4.)Cardanol Phenol Formaldehyde Resin75OthersMTMRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Oct 2016
(iv)Valid Upto 07 Sep 2021
(v)File No. No. GPCB/CCA/RJ-3180/ID-62126/
(vi)Application No. AWH-82000
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.9547
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.065
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0238
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.048
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 427.62
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 427.62
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Kraft Paper600Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
(2.)Acetic Acid10.5Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
(3.)Phenol783Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
(4.)Urea840Tons per AnnumMTMOpen MarketRoad6 Open MarketCopy of Linkage
(5.)Formaldehyde 37%2464.5Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
(6.)Melamine144Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
(7.)Caustic Soda22.5Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
(8.)Design Paper180Tons per AnnumOpen MarketRoad6 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube20.210.819.980
(2.)PM10Micro Gram per Meter Cube96.351.494.7100
(3.)PM2.5Micro Gram per Meter Cube41.422.140.760
(4.)SO2Micro Gram per Meter Cube10.65.710.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.450.3011.5
(2.)TDSmg/l101485920002000
(3.)Total Hardnessmg/l500220600600
(4.)TSSmg/l10.10.51
(5.)Chloridesmg/l30514510001000
(6.)pHNA7.817.106.58.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.817.19C
(2.)DOmg/l75A
(3.)BODmg/l84C
(4.)CODmg/l3216C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.846.1Industrial 75 Silence Zone 50
(2.)Leq(Night)A-weighted decibels(dB(A))64.237.9Industrial 70 Silence Zone 40
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram1367.2738.1
(2.)P(Phosphorus)Milligram per Kilogram0.000.00
(3.)Electric ConductivityMillisiemens per Centimetre2187147
(4.)N(Nitrogen)Percent478248.33
(5.)pH7.87.09
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater250Copy of Permission LettermodeOthersSubmersible pumpTube Well21-4/5510/GJ/IND/201923 Nov 201925
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler0.50.5ETPOtherssteamed based forced evaporator0.000.5
(2.)RO Reject3.53.5ETPOtherssteamed based forced evaporator0.003.5
(3.)Industrial cooling11ETPOtherssteamed based forced evaporator0.001
(4.)washing0.50.5ETPOtherssteamed based forced evaporator0.000.5
(5.)Domestic22Septic TankOthersSeptic Tank0.002
(6.)Industrial Process0.30.3ETPOtherssteamed based forced evaporator0.000.3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7.8
(b)Total Discharged Water (Kilolitre per Day) 7.8
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded containers/ BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons0RoadAuthorized Recyclers
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Kilolitre0RoadAuthorized Recyclers
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube73.7100.0673.83100
(2.)NOxMicrogram per Meter Cube15.4100.3415.8280
(3.)SO2Microgram per Meter Cube8100.478.5380
(4.)PM2.5Microgram per Meter Cube34100.134.860
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boilerwhite coal, wood, coal300.5SO239
(2.)DG SetHSD60.12SO235
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source PGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 No. x 62.5 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.00
(b)Private Land (ha.) 0.1084
(c)Government Land (ha.) 0.00
(d)Revenue Land (ha.) 0.00
(e)Other Land (ha.) 0.00
    Total Land (ha.) 0.10840
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.00
(b)Waste/Barren Land (ha.) 0.00
(c)Grazing/ Community Land (ha.) 0.00
(d)Surface Water Bodies (ha.) 0.00
(e)Settlements (ha.) 0.00
(f)Industrial (ha.) 0.1084
(g)Forest (ha.) 0.00
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : No other land 0.00
    Total (ha.) 0.1084
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTOTAL PLANT AREA0.11
Total (ha.) 0.11
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0.0NA
(2.)WLSNA0.0NA
(3.)NPANA0.0NA
(4.)ESAsNA0.0NA
(5.)ESZsNA0.0NA
(6.)CorridorsNA0.0NA
(7.)Wildlife CorridorsNA0.0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0.0NA
(2.)ForestNA0.0NA
(3.)Archaeological SitesNA0.0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.11
(b)Land yet to be acquired(Ha) 0.00
(c)Status of Land acquisition if not acquired 0.00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 3
(b)Permanent Employment-During Operation 2
(c)Temporary Employment- During Construction 2
(d)Temporary Employment- During Operation 2
(e)No. of working days 28
(f)Total Manpower 9
32.
Green Belt in Ha:
(a)Total Area of Green Belt 358
(b)Percentage of Total Project Area 330258.30
(c)No. of Plants to be Planted 1500
(d)Funds Allocated for Plantation 30000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject proponent will contribute at least 2.5% of the project cost as CER activities. The Greenbelt development will benefit the biological environment. The Environmental Management plan will be executed for betterment of environment. The Project will establish environment management cell.
(2.)SocialProject will benefit the social environment by providing drinking water facilities in nearby villages, by providing funds for educational aids, by providing medical camps for villagers, by providing employment to the local people.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green Circle Inc
(iii)Address Green Empire (Anupushpam), Above Axis Bank, near Yash complex, Gotri main road, Vadodara, 390021
(iv)Mobile No. 9311768924
(v)Landline No. 0265237126
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhavinkumar Gandubhai Manvar
DesignationFinance
Name of Company (Applicant Name should not be given here)M/S. DELL LAMINATE
AddressSurvey no. 22 , plot no.1,B/h. Pentagon Forgings,National Highway 27 (8B), Tal. Gondal,Dist. Rajkot
Print