1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Construction of Ahmedabad - Dholera Expressway Road (110 km) (NHAI/BM/21) in the State of Gujarat by Mis National Highways Authority of India | (b)Name of the Company / Organisation | NHAI PIU AHMEDABAD | (c)Registered Address | 3A & 3B, 2nd floor, Amul building Nr. dena bank, vejalpur road, Jivraj park, Ahmedabad,,Ahmedabad,Gujarat-380051 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | D S Zodge | (b)Designation (Owner/ Partner/ CEO) | Project Director | (c)Address | 3A and 3b, 2nd floor, amul building nr. dena bank vejalpur road, jivraj park, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380051 | (d)Pin code | 380051 | (e)E-mail | nhaiahd@gmail.com | (f)STD Code. | 79(f)Telephone No. | 26821062 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(f) Highways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/NCP/129696/2018 | (d)Master Proposal Number(Single Window) | SW/129693/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Nil | (b)Pincode | 380001 | (c)Bounded Latitudes (North) | | From | | Degree | 22.94611 | Minutes | | Second | | From | | Degree | 72.4850 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 22.039166 | Minutes | | Second | | From | | Degree | 72.099722 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43A4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 35 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | F.No. 10-9/2018-IA.III | (c)Date of Apply of TOR | 08 Feb 2018 | (d)Date of Issue of TOR / Standard ToR | 11 Jun 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Adhelai Primary School, Vil: Adhelai, Ta, Dist: Bhavnagar, Gujarat | State : | Gujarat | District : | Bhavnagar | Tehsil : | Bhavnagar | Village : | Adhelai |
| 26 | The project does not impact the drainage and mitigation measures should be implemented for the Wildlife Sanctuary | Others | Additional District Collector & Additional District Magistrate | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 13 Nov 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Mukhi l\4ango Farm, Ofi Dholka- Chiyada Road, Village: Sindhrej, Taluka: Dholka, District: Ahmedabad, Gujarat | State : | Gujarat | District : | Ahmedabad | Tehsil : | Dholka | Village : | Sindhrej |
| 250 | Land Compensation and related issues | Others | Additional District Collector & Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | NA | NA | NA | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Construction of Ahmedabad to Dholera Expressway in the state of Gujarat | 110 | Kilometers | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Dec 2019 | (iv)Valid Upto | 05 Dec 2019 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3300.48 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 45.50 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 16.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 15.16 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 17382226 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 17382226 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Fly Ash | 17382226 | Others | cum | Sabarmati Thermal Power Station | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Mili Gram per Meter Cube | 1.8 | 0.98 | 1.6 | 4 | (2.) | NOx | | Micro Gram per Meter Cube | 22.8 | 14.2 | 22.2 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 182.5 | 160.4 | 180.1 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 70.4 | 50.5 | 68.9 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 15.5 | 10.2 | 15.1 | 80 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.29 | 7.28 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 2422.70 | 2265.40 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 896.60 | 799.90 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 861 | 796 | 250 | 1000 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Fluoride | | | mg/l | | 0.72 | 0.54 | 1 | 1.5 | (7.) | Heavy Metals | | Iron | mg/l | | 0.29 | 0.22 | 0.05 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 120 | 95 | C | (2.) | pH | | NA | | 7.35 | 6.93 | C | (3.) | BOD | | mg/l | | 32 | 22 | C | (4.) | Others | Conductivity | Others | us/cm | 757.06 | 385.88 | C | (5.) | DO | | mg/l | | 5.6 | 5.1 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.6 | 50 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 56.2 | 39.2 | 55 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.6 | 7.46 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 20.3 | 12.3 | (3.) | K(Potassium) | Milligram per Kilogram | | 7.83 | 6.12 | (4.) | N(Nitrogen) | Percent | | 24.6 | 19.3 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 245 | 141 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.2 To 22.58 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.06 To 16.52 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 450 | 0 | Copy of Permission Letter | Pipeline | | Intake Well | | NA | 05 Dec 2019 | 450 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 0 | 0 | NA | Green Belt Renewal Plant | | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | N/A | Construction & Demolition Waste | | 0 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 182.5 | 1 | 5.9 | 188.5 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 70.4 | 1 | 3.4 | 73.9 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 80 | (4.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NA | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 1.530 | (b)Private Land (ha.) | 886.26 | (c)Government Land (ha.) | 71.35 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 959.14 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 9187.25 | (b)Waste/Barren Land (ha.) | 1035.09 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 103.69 | (e)Settlements (ha.) | 157.14 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 1.530 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 324.65 | (j)Others (ha.) : Road, Canal and Railway Line | 133.35 | Total (ha.) | 10942.7000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 959.14 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | WLS | Velavadar National Park | 1.5 | From the end point point of the alignment | (3.) | NPA | NA | 0 | NA | (4.) | ESZs | Velavadar National Park | 1.5 | The end point of the alignment is 1.5 km away from the ESZ of Velavadar National Park | (5.) | Corridors | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | ESAs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Forest | | Protected Forest | 0 | 1.530 ha of protected forest at the road crossings | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 959.14 | (b)Land yet to be acquired(Ha) | 959.14 | (c)Status of Land acquisition if not acquired | In process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 24 | (b)No. of Households | 180 | (c)No. of PDFs (Project Displaced Families) | 180 | (d)No. of PAFs (Project Affected Families) | 180 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 837.66 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 31 nos of pond shall be impacted | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | 45 nos of Rivers and Canals | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 1400 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 240 | (f)Total Manpower | 1500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 97.19 | (b)Percentage of Total Project Area | 10.13 | (c)No. of Plants to be Planted | 97195 | (d)Funds Allocated for Plantation | 145792500 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IB | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | No | (d)Area of Mangroves Land (hectare) | 0 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | The construction site is devoid of mangroves and c | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 01 Dec 2018 | (iv)Period of Study To (EIA Terrestrial) | 30 Dec 2018 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | The construction site is devoid of mangroves and c | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 01 Dec 2018 | (iv)Period of Study to (EIA Marine) | 30 Dec 2018 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | Attached as Annexure VIII | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | National Centre for Sustainable Coastal management | (ii)Please Specify with salient features | The proposed Ahmedabad-Dholera expressway route pa | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IB | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 0 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 0 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | No | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | The conditions have been implemented in the minute | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | NA | |
|
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | NA | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | 110 | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | (a)Total No. of Bridges | 34 | (b)Total No. of ROB | 0 | (c)Total No. of Interchanges | 18 | (d)Total No. of Flyovers | 10 | (e)Total No. of Vehicle Underpass | 20 | (f)Total No. of Pedestrian Underpass | 26 | (g)Details of other utilities rail and road corridors | culverts- 216, Cattle underpass-1 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 53 | (ii)Name of the EIA Consultant | Enviro Infra Solutions Pvt. Ltd. | (iii)Address | 301,302 & 305 SRBC Building Sector 9, Vasundhara Ghaziabad | (iv)Mobile No. | 9818922344 | (v)Landline No. | 0120415118 | (vi)Email Id | eis@enviroinfrasolutions.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 13 Nov 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The revised EIA/EMP Report along with the revision of bio diversity , ecology and Checklist of flora fauna in the relevant chapters i.e. Chapter 3 and Chapter 4 has been attached in reply to ADS sought by EAC Committee | 20 Aug 2020 | 2. | NA |
The Committee noted that the consultant did very poor quality studies on biodiversity and ecology and checklist of fauna and flora are peppered with errors. For e.g. Lithobates catesbeianus is listed in the EIA which in fact is an American Bull Frog that is found in North America and invasive in many countries but not found in India. Similarly, Western Rat Snake Pantherophis obsoletus is found exclusively in North America. Podarcis muralis (common wall lizard) is found in Europe and North America and not India. A scorpion species Typhlochactas mitchelli listed in EIA is endemic to Mexico. Such poor quality work not only reflects poorly on NABET Accreditation process but also on NHAI for appointing such poor quality consultants. It is one of the main reasons for delays in considering projects.
In view of above, EAC deferred the proposal for want of revised EIA/EMP report for portion related to biodiversity, ecology and checklist of fauna flora.
|
| 08 Aug 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | D S Zodge | Designation | Project Director | Name of Company (Applicant Name should not be given here) | NHAI PIU AHMEDABAD | Address | 3A & 3B, 2nd floor, Amul building Nr. dena bank, vejalpur road, Jivraj park, Ahmedabad |
|