Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction of Ahmedabad - Dholera Expressway Road (110 km) (NHAI/BM/21) in the State of Gujarat by Mis National Highways Authority of India
(b)Name of the Company / Organisation NHAI PIU AHMEDABAD
(c)Registered Address 3A & 3B, 2nd floor, Amul building Nr. dena bank, vejalpur road, Jivraj park, Ahmedabad,,Ahmedabad,Gujarat-380051
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant D S Zodge
(b)Designation (Owner/ Partner/ CEO) Project Director
(c)Address 3A and 3b, 2nd floor, amul building nr. dena bank vejalpur road, jivraj park, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380051
(d)Pin code 380051
(e)E-mail nhaiahd@gmail.com
(f)STD Code. 79(f)Telephone No. 26821062
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/NCP/129696/2018
(d)Master Proposal Number(Single Window) SW/129693/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Nil
(b)Pincode 380001
(c)Bounded Latitudes (North)
From
Degree 22.94611
Minutes
Second
From
Degree 72.4850
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 22.039166
Minutes
Second
From
Degree 72.099722
Minutes
Second
(e)Survey of India Topo Sheet No. F43A4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 35
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number F.No. 10-9/2018-IA.III
(c)Date of Apply of TOR 08 Feb 2018
(d)Date of Issue of TOR / Standard ToR 11 Jun 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :1
Adhelai Primary School, Vil: Adhelai, Ta, Dist: Bhavnagar, Gujarat
State :Gujarat
District :Bhavnagar
Tehsil :Bhavnagar
Village :Adhelai
26The project does not impact the drainage and mitigation measures should be implemented for the Wildlife SanctuaryOthersAdditional District Collector & Additional District Magistrate
(2.)
Date of Advertisement :09 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Nov 2019
Distance of Public Hearing Venue from the Proposed Project :1
Mukhi l\4ango Farm, Ofi Dholka- Chiyada Road, Village: Sindhrej, Taluka: Dholka, District: Ahmedabad, Gujarat
State :Gujarat
District :Ahmedabad
Tehsil :Dholka
Village :Sindhrej
250Land Compensation and related issuesOthersAdditional District Collector & Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Construction of Ahmedabad to Dholera Expressway in the state of Gujarat110KilometersRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Dec 2019
(iv)Valid Upto 05 Dec 2019
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3300.48
(b) Funds Allocated for Environment Management (Capital) (in Crores) 45.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 16.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 15.16
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 17382226
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 17382226
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fly Ash17382226OtherscumSabarmati Thermal Power StationRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube1.80.981.64
(2.)NOxMicro Gram per Meter Cube22.814.222.280
(3.)PM10Micro Gram per Meter Cube182.5160.4180.1100
(4.)PM2.5Micro Gram per Meter Cube70.450.568.960
(5.)SO2Micro Gram per Meter Cube15.510.215.180
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.297.286.58.5
(2.)TDSmg/l2422.702265.405002000
(3.)Total Hardnessmg/l896.60799.90200600
(4.)Chloridesmg/l8617962501000
(5.)TSSmg/l0000
(6.)Fluoridemg/l0.720.5411.5
(7.)Heavy MetalsIronmg/l0.290.220.051.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l12095C
(2.)pHNA7.356.93C
(3.)BODmg/l3222C
(4.)OthersConductivityOthersus/cm757.06385.88C
(5.)DOmg/l5.65.1C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.65065
(2.)Leq(Night)A-weighted decibels(dB(A))56.239.255
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.67.46
(2.)P(Phosphorus)Milligram per Kilogram20.312.3
(3.)K(Potassium)Milligram per Kilogram7.836.12
(4.)N(Nitrogen)Percent24.619.3
(5.)Electric ConductivityMillisiemens per Centimetre245141
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.2 To 22.58
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.06 To 16.52
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4500Copy of Permission LetterPipelineIntake WellNA05 Dec 2019450
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAGreen Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)N/AConstruction & Demolition Waste0Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube182.515.9188.5100
(2.)PM2.5Microgram per Meter Cube70.413.473.960
(3.)SO2Microgram per Meter Cube000180
(4.)NOxMicrogram per Meter Cube000180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1.530
(b)Private Land (ha.) 886.26
(c)Government Land (ha.) 71.35
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 959.14
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 9187.25
(b)Waste/Barren Land (ha.) 1035.09
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 103.69
(e)Settlements (ha.) 157.14
(f)Industrial (ha.) 0
(g)Forest (ha.) 1.530
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 324.65
(j)Others (ha.) : Road, Canal and Railway Line 133.35
    Total (ha.) 10942.7000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt959.14
Total (ha.) 959.14
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSVelavadar National Park1.5From the end point point of the alignment
(3.)NPANA0NA
(4.)ESZsVelavadar National Park1.5The end point of the alignment is 1.5 km away from the ESZ of Velavadar National Park
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestProtected Forest01.530 ha of protected forest at the road crossings
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 4478
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 959.14
(b)Land yet to be acquired(Ha) 959.14
(c)Status of Land acquisition if not acquired In process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 24
(b)No. of Households 180
(c)No. of PDFs (Project Displaced Families) 180
(d)No. of PAFs (Project Affected Families) 180
(e)Funds Allocated for R&R(in INR) (in Lacs) 837.66
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 31 nos of pond shall be impacted
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 45 nos of Rivers and Canals
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1400
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 240
(f)Total Manpower 1500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 97.19
(b)Percentage of Total Project Area 10.13
(c)No. of Plants to be Planted 97195
(d)Funds Allocated for Plantation 145792500
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IB
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any No
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies The construction site is devoid of mangroves and c
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 01 Dec 2018
(iv)Period of Study To (EIA Terrestrial) 30 Dec 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies The construction site is devoid of mangroves and c
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 01 Dec 2018
(iv)Period of Study to (EIA Marine) 30 Dec 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Attached as Annexure VIII
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps National Centre for Sustainable Coastal management
(ii)Please Specify with salient features The proposed Ahmedabad-Dholera expressway route pa
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IB
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained No
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed The conditions have been implemented in the minute
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) NA
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking NA
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area 38.30 ha of area is under water bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 110
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 34
(b)Total No. of ROB 0
(c)Total No. of Interchanges 18
(d)Total No. of Flyovers 10
(e)Total No. of Vehicle Underpass 20
(f)Total No. of Pedestrian Underpass 26
(g)Details of other utilities rail and road corridors culverts- 216, Cattle underpass-1
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 53
(ii)Name of the EIA Consultant Enviro Infra Solutions Pvt. Ltd.
(iii)Address 301,302 & 305 SRBC Building Sector 9, Vasundhara Ghaziabad
(iv)Mobile No. 9818922344
(v)Landline No. 0120415118
(vi)Email Id eis@enviroinfrasolutions.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 13 Nov 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe revised EIA/EMP Report along with the revision of bio diversity , ecology and Checklist of flora fauna in the relevant chapters i.e. Chapter 3 and Chapter 4 has been attached in reply to ADS sought by EAC Committee 20 Aug 2020
2.NA

The Committee noted that the consultant did very poor quality studies on biodiversity and ecology and checklist of fauna and flora are peppered with errors. For e.g. Lithobates catesbeianus is listed in the EIA which in fact is an American Bull Frog that is found in North America and invasive in many countries but not found in India. Similarly, Western Rat Snake Pantherophis obsoletus is found exclusively in North America. Podarcis muralis (common wall lizard) is found in Europe and North America and not India. A scorpion species Typhlochactas mitchelli listed in EIA is endemic to Mexico. Such poor quality work not only reflects poorly on NABET Accreditation process but also on NHAI for appointing such poor quality consultants. It is one of the main reasons for delays in considering projects.

In view of above, EAC deferred the proposal for want of revised EIA/EMP report for portion related to biodiversity, ecology and checklist of fauna flora.

08 Aug 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantD S Zodge
DesignationProject Director
Name of Company (Applicant Name should not be given here)NHAI PIU AHMEDABAD
Address3A & 3B, 2nd floor, Amul building Nr. dena bank, vejalpur road, Jivraj park, Ahmedabad
Print