Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Establishment of Synthetic organic Chemicals - Pigment by M/s. Shrey Industries , Plot No. 7 &8, S. No. 111 & 112, Dhanot, Ta - Kalol, Dist - gandhinagar, Gujarat.
(b)Name of the Company / Organisation SHREY INDUSTRIES
(c)Registered Address Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar,,Gandhinagar,Gujarat-382715
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjaykumar Bhogilal Patel
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Survey No. 111 and 112, Plot No. 7 and 8, Dhanot, Kalol, Gandhinagar,,Kalol,Gandhinagar,Gujarat-382715
(d)Pin code 382715
(e)E-mail shreyindustries07@gmail.com
(f)STD Code. 79(f)Telephone No. 40083051
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/85152/2018
(d)Master Proposal Number(Single Window) SW/128382/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 111 & 112, Plot No. 7 & 8, Village: Dha
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 23.303480
Minutes
Second
From
Degree 23.304019
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.426895
Minutes
Second
From
Degree 72.427431
Minutes
Second
(e)Survey of India Topo Sheet No. F43A07, F43A08, F43A11, F43A12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 71
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.38
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratGandhinagarKalol
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/369/2018-IA-II(I)
(b)Date of Apply of TOR 21 Nov 2018
(c)Date of Issue of TOR / Standard ToR 31 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site of M/s. Shrey Industries
State :Gujarat
District :Gandhinagar
Tehsil :Kalol
Village :Dhanot
57Regarding Employment and wastewater management.OthersAdditional District Magistrate
(2.)
Date of Advertisement :11 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
public place at near Surpur Balaji Temple, Village- Rasulpura, Tehsil-Nimbahera
State :Rajasthan
District :chittorgarh
Tehsil :Nimbahera
Village :Rasulpura
100Employment for local and CSR activitiesOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reaction Vessel (SS) - 2 Nos20 KL
(2.)Blender (SS) - 1 Nos6 KL
(3.)Air Clarifying mill (SS) - 1 Nos200 kg/hr
(4.)Thermic Fluid Heater (SS) - 1 Nos3 Lac k cal per hr
(5.)Air Compressor (MS) - 1 Nos150 CFM
(6.)Cooling Tower (HDPE) - 1 Nos200 TR
(7.)Receiver (SS) - 2 Nos8 KL
(8.)Centrifugal pump (SS)5 Nos
(9.)PP Centrifugal Pump (PP)3 Nos
(10.)Hoist (2 Nos)2 MT
(11.)Spin Flash Dryer (SS) - 1 Nos300 kg/hr
(12.)RO Plant (SS) - 1 Nos6 Module
(13.)Glass Lined Reaction Vessel (SS) - 3 Nos4 KL
(14.)Reaction Vessel (MSRL) - 2 Nos35 KL
(15.)Steam Boiler (MS) - 1 Nos2 TPH
(16.)Storage Tank (HDPE) - 4 Nos.10 KL
(17.)Scrubber (HDPE) - 4 Nos800 mm dia
(18.)FRP Tank (FRP) - 4 Nos1 KL
(19.)DG Set (1 Nos)125 KVA
(20.)Filter Press (PP) - 4 Nos48”X48”X80 Plates
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pigment Green 7100OthersMT/MonthRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.565
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.012
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.957
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 430.6
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 430.6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw Materials430.6OthersMT/MonthAhmedabad, Ankleshwar, Vapi, Vadodara etc...Road,Rail250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.7730.4144.7660
(2.)SO2Micro Gram per Meter Cube42.029.4234.7280
(3.)PM10Micro Gram per Meter Cube88.6672.4088.02100
(4.)NOxMicro Gram per Meter Cube49.9212.9947.3780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.870.501.01.5
(2.)Chloridesmg/l383.42812501000
(3.)pHNA7.97.17.58.5
(4.)TSSmg/l0.50.511.5
(5.)TDSmg/l9977815002000
(6.)Total Hardnessmg/l270216200600
(7.)Heavy MetalsIronmg/l0.270.131.01.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00A
(2.)BODmg/l10.42C
(3.)CODmg/l444C
(4.)pHNA8.07.8C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))643875
(2.)Leq(Night)A-weighted decibels(dB(A))503870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.37.6
(2.)K(Potassium)Milligram per Kilogram6942
(3.)Electric ConductivityOthersOhm/cm681178
(4.)N(Nitrogen)Milligram per Kilogram313126
(5.)P(Phosphorus)Milligram per Kilogram114.16
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersLocal Water Tanker84.610 Not Appliacble modeOthersTankerOthersPipelineNA13 Oct 201885
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.80Soak PitOthersSoak Pit via Septic Tank00.8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.8
(b)Total Discharged Water (Kilolitre per Day) 0.8
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded Containers/BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons20RoadAuthorized Recyclers
(2.)Dilute HCl 30 %Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)2220Tons100RoadOthersSell to Rule 9 authorized industries
(3.)Aluminium ChlorideHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5640Tons100RoadOthersSell to Rule 9 authorized industries
(4.)Sodium HypochloriteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3360Tons100RoadOthersSell to Rule 9 authorized industries
(5.)ETP WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)72Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre20RoadOthersReused or sell to refiners
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube88.662.810.0788.73100
(2.)PM2.5Microgram per Meter Cube44.175.590.0744.8460
(3.)SO2Microgram per Meter Cube42.022.390.1242.1580
(4.)NOxMicrogram per Meter Cube49.921.380.0449.9780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Thermic Fluid Heater (3 Lac k cal/hr)LDO/Furnace Oil300.9PM100.000925
(2.)Hot Air Generator (2.0 Lac k cal/hr)Agro Waste200.4PM100.02312
(3.)DG Set (125 KVA)Diesel110.3SO20.0000644
(4.)Spin Flash Dryer (500 lit/hr)NA200.4PM100.0005
(5.)Steam Boiler (2 TPH)Agro Waste300.9PM100.0925
(6.)Reaction VesselNA110.3OthersHCl, Cl20.044, 0.01342
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 190
(b)Source UGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.3366
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.3366
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22817
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 214
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1322
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Habitation, Plantation, Vagetation etc.. 6673.56
    Total (ha.) 31026.56
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.11
(2.)Area for Solid Waste Management0.01
(3.)Built Up Area0.13
(4.)OthersETP, Open, Parking, Road Area0.08ETP, Open, Parking, Road Area
Total (ha.) 0.33
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNo Critically Polluted Area10None within 10 km
(2.)ESAsNo10None within 10 km
(3.)CorridorsNo10None within 10 km
(4.)Wildlife CorridorsNo10None within 10 km
(5.)NPANo10None within 10 km
(6.)WLSNo10None within 10 km
(7.)ESZsNo10None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNo10None within 10 km
(2.)Defence InstallationsNo10None within 10 km
(3.)Archaeological SitesNo10None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.33
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2
(b)Permanent Employment-During Operation 6
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 4
(e)No. of working days 320
(f)Total Manpower 17
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.11
(b)Percentage of Total Project Area 32.68
(c)No. of Plants to be Planted 30
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Increases
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 19
(ii)Name of the EIA Consultant Bhagwati Enviro Care Pvt. Ltd.
(iii)Address Plot No. 28,29,30, Parmeshwar Estate-II, Opp. AMCO Bank, Phase-I, GIDC Estate, Vatva, Ahmedabad.
(iv)Mobile No. 9824051541
(v)Landline No. 0794008305
(vi)Email Id tech5@bhagwatienviro.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjaykumar Bhogilal Patel
DesignationPartner
Name of Company (Applicant Name should not be given here)SHREY INDUSTRIES
AddressSurvey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar
Print