Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) RAJMAHAL (EXPANSION) OCP
(b)Name of the Company / Organisation Eastern Coalfields Ltd.
(c)Registered Address Borachak House, Eastern Coalfields Ltd., Asansol -313359,Borachak House, Eastern Coalfields Ltd., Asansol -313359,Burdwan,West Bengal-713359
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant J.N.BISWAL
(b)Designation (Owner/ Partner/ CEO) General Manager (Env)
(c)Address Borachak House, Eastern Coalfields Ltd., Asansol -313359,Borachak House, Eastern Coalfields Ltd., Asansol -313359,,,Jharkhand-713359
(d)Pin code 713359
(e)E-mail envecl@yahoo.com
(f)STD Code. 341(f)Telephone No. 2254510
(g)Fax No. 03412254510
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/CMIN/128369/2004
(d)Master Proposal Number(Single Window) SW/128355/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type One time capacity expansion(only for Coal Mining)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Bara Simra, Hijukita, Nimakala, Chota Simra, Ghat
(b)Pincode 814165
(c)Bounded Latitudes (North)
From
Degree 25.02111111
Minutes
Second
From
Degree 25.0558333
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.304444444
Minutes
Second
From
Degree 87.40305556
Minutes
Second
(e)Survey of India Topo Sheet No. 72O/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 204
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/30/2004-IA.II(M)
(c)Date of Issue of TOR 16 Aug 2004
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 29 Nov 2019
(c)Date of Issue of EC 20 Mar 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason One Time Capacity expansion of Rajmahal OCP from 1
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-73/08/EPE/3616 dated 26.11.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 21 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CAPACITY17.006.8023.8OthersMTPARoad,Rail,Conveyor Belt
(2.)AREA197801978Hectares(ha)Road,Rail,Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)COAL MINEOPENCASTOPENCASTOPENCAST
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Jan 2017
(iv)Valid Upto 31 Dec 2021
(v)File No. JSPCB/HO/RNC/CTO-1112442/2017/86
(vi)Application No. CTO-1112442
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2078.35
(b) Funds Allocated for Environment Management (Capital) (in Crores) 51.88
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.59
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 35.56
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 35.56
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD88.90Kilo Litre per DayIOCLRoad0 Fuel Supply AgreementCopy of Linkage
(2.)Explosives1325.53Tons per AnnumPESORoad0 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube000120
(2.)NOxMicro Gram per Meter Cube21.517.519120
(3.)PM2.5Micro Gram per Meter Cube54.539.34360
(4.)PM10Micro Gram per Meter Cube131.496.2105300
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHNA7.777.5678.5
(3.)TDSmg/l8908865002000
(4.)Total Hardnessmg/l238208300600
(5.)Fluoridemg/l0.440.4011.5
(6.)Chloridesmg/l1631322501000
(7.)Heavy MetalsAsmg/l000.010
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00A
(2.)DOmg/l00A
(3.)BODmg/l00A
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.843.575
(2.)Leq(Night)A-weighted decibels(dB(A))0070
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Litre00
(2.)P(Phosphorus)Millisiemens per Centimetre00
(3.)K(Potassium)Millisiemens per Centimetre00
(4.)Electric ConductivityOthersMicro seimens00
(5.)pH00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.3 To 9.2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.25 To 7.8
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/282/JH/MIN/2018
(f)Date of Issue 27 Jun 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine Water42502Copy of Permission LettermodeOthersPipeline, DrainsOthersPumping from Opencast Mine Pit21-4/282/JH/MIN/201827 Jun 20186500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic10720Septic Tanks / Soak PitsOthersSeptic Tanks / Soak Pits01072
(2.)Mining Operation525525Oil and Grease trap, Sedimentation tankReuse within the Plant & Recycling525
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1597
(b)Total Discharged Water (Kilolitre per Day) 1072
(c)Total Reused Water (Kilolitre per Day) 525
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OBOthersOver Burden44080000Kilolitre2OthersHaul RoadsOthersProgressive Back-filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube122.7041.45165300
(2.)PM2.5Microgram per Meter Cube00010
(3.)SO2NA00010
(4.)NOxNA00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 82906037.5
(b)Source Jharkhand Bijli Vitran Nigam Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 107.39
(b)Private Land (ha.) 1715.21
(c)Government Land (ha.) 155.40
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1978.00
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 492
(b)Waste/Barren Land (ha.) 73
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 8
(e)Settlements (ha.) 335
(f)Industrial (ha.) 634
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plantation including Scrubs 436
    Total (ha.) 1978
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area1344
(2.)OB Dump Area276
(3.)Township120
(4.)OthersRehabilitation Colony42
(5.)Built Up Area196
Total (ha.) 1978
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSna00
(2.)Corridorsna0na
(3.)Wildlife Corridorsna0na
(4.)NPAna00
(5.)ESZsna00
(6.)Critically Polluted AreaNA00
(7.)ESAsNa00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestna00
(2.)Defence Installationsna0na
(3.)Archaeological Sitesna0na
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1547.23
(b)Land yet to be acquired(Ha) 430.77
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 13
(b)No. of Households 5931
(c)No. of PDFs (Project Displaced Families) 2647
(d)No. of PAFs (Project Affected Families) 5931
(e)Funds Allocated for R&R(in INR) (in Lacs) 1665
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 9.59 crores
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Ponds
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sundar River, Ponds & Seasonal Nallas
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 532
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 532
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt23312781511
(2.)Percentage of Total Project Area11.7764.6176.38
(3.)No. of Plants37280020448002417600
(4.)Funds Allocated1710171
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. Reclamation and Restoration of degraded land due to mining operations. 2. Green belt Development 3. Use of degraded land for agriculture / horticulture / floriculture
(2.)Financial1. Economic growth of local population 2. Employment generation both direct and indirect 3. Community development under CSR
(3.)Social1. Economic growth of local population 2. Employment generation both direct and indirect 3. Community development under CSR
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 17 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Agenda No. 43.03 for approval of “Mining Plan for
(b)Date of Approval 26 Sep 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Empowered Sub-Committee of ECL Board of Directors
(e)Approved Mining Lease Area 1978
(f)Approved Capacity 23.80
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 493.04
(b)Mineable Reserves (Million Ton) 185.05
(c)Extractable Reserves(Million Ton) 185.05
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral G13
(f)Stripping Ratio 2.14 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 2 degree to 4 degree
(i)Mining Method Opencast
(j)Life of Mine (Years) 9
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 13
(c)Thickness of seams to be worked on 10
(d)Maximum Thickness of Seams (metres) 26.53
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1978
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Acquired under Coal Bearing Areas (Acquisition and
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Acquired under Coal Bearing Areas (Acquisition and
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Acquired under Coal Bearing Areas (Acquisition and
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 8.3
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 8.3
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 200 (hectare) at a Depth of 20 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1344
13.
Details of Transportation:
(a)In Pit/Underground to Surface Coal is loaded by shovels at face and transported
(b)Surface to Siding/Loading Crushed Coal is transported to Silo Loading System
(c)Transportation / Conveyor Details Combination of Rail, Road and Conveyor Belt is use
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)OTHERS(Specify)Govt Land019.7319.73
(2.)GRAZING LAND000
(3.)WASTE LAND7340.05113.05
(4.)SETTLEMENTS46.15046.15
(5.)FOREST LAND107.390107.39
(6.)AGRICULTURE LAND1535.76143.221678.98
(7.)SURFACE WATER BODIES13.7013.7
TOTAL17762031979
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS0000
(2.)EXTERNAL OB DUMPS27600276
(3.)GREEN BELT1204658
(4.)BUILT UP AREA (COLONY/OFFICE)330267300
(5.)INTERNAL OB DUMPS114420001344
(6.)EXCAVATION/QUARRY0000
(7.)VIRGIN AREA0000
(8.)TOP SOIL STORAGE0000
TOTAL146520031301978
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 276
(b)Internal Dump(in hectare) 1144
(c)Quarry(in hectare) 1344
(d)Safety Zone(in hectare) 0
(e)Final Void of 200 (hectare) at a Depth of 20 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1600
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 358
(h)Total afforestation plant (in hectare) 1511
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)19890010.52.70
(2.)199310.5010.53.90
(3.)199610.5010.58.50
(4.)199810.5010.59.20
(5.)200010.5010.58.20
(6.)200110.5010.5100
(7.)200310.5010.58.80
(8.)200410.51710.510.50
(9.)200510.51710.58.70
(10.)200917171710.70
(11.)201017171711.30
(12.)201117171712.90
(13.)201217171711.50
(14.)201317171713.40
(15.)201417171714.30
(16.)201517171715.90
(17.)201617171715.60
(18.)201717171714.40
(19.)201817171714.90
(20.)2019171717170
(21.)19910010.52.50
(22.)199410.5010.54.20
(23.)200717171711.60
(24.)20081717177.10
(25.)200210.5010.59.30
(26.)19900010.51.20
(27.)199710.5010.5100
(28.)199510.5010.56.00
(29.)19920010.54.20
(30.)199910.5010.58.40
(31.)200617171711.50
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0092
(ii)Name of the EIA Consultant Central Mine Planning and Design Institute Limited
(iii)Address Gondwana Place, Kanke Road, Ranchi, Jharkhand - 834031
(iv)Mobile No. 8987788960
(v)Landline No. 0651223005
(vi)Email Id gmenv.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPlease find attached file for reply of ADS 29 Feb 2020
2. ADS Raise Letterpls furnish the details as enclosed (email copy) 27 Feb 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJ.N.BISWAL
DesignationGeneral Manager (Env)
Name of Company (Applicant Name should not be given here)Eastern Coalfields Ltd.
AddressBorachak House, Eastern Coalfields Ltd., Asansol -313359
Print