Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Steel Plant from 6 to 8 MTPA Crude Steel and 9 MTPA Finished Steel
(b)Name of the Company / Organisation TATASTEEL KALINGANAGAR
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajiv Kumar
(b)Designation (Owner/ Partner/ CEO) Vice President- Operations,TSk
(c)Address NIL
(d)Pin code 755026
(e)E-mail bhanu.yadav@tatasteel.com
(f)STD Code. 6726(f)Telephone No. 660704
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND/128148/2016
(d)Master Proposal Number(Single Window) SW/128142/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Please see Annexure 1 of Additional Attachments Fi
(b)Pincode 755026
(c)Bounded Latitudes (North)
From
Degree 20.56
Minutes
Second
From
Degree 21.58
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.59
Minutes
Second
From
Degree 86.02
Minutes
Second
(e)Survey of India Topo Sheet No. F45U1, F45T13, F45O4, F45N16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 120
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/07/2006-IA.II(I)
(c)Date of Issue of TOR 14 Mar 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 13 Jun 2020
(c)Date of Issue of EC 24 Dec 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :4.5
JDCL Complex
State :Orissa
District :Jajpur
Tehsil :Sukinda
Village :Pankapal
326Local Employment, Health, Drinking Water, Periphery development, Training, Plantation, Environment protectionOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-208/06/EPE & 101-208/EPE/304
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 7 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HR Coil (including 2.2 MTPA CR Coil)550000015000007000000Tons per Annum(TPA)Road,Rail
(2.)Long Product020000002000000Tons per Annum(TPA)Road,Rail
(3.)Coke140000023500003750000Tons per Annum(TPA)Conveyor Belt
(4.)CR Coil022000002200000Tons per Annum(TPA)Road,Rail
(5.)Captive Power166199365Mega Watt(MW)OthersNA
(6.)Sinter575000014800007230000Tons per Annum(TPA)Conveyor Belt
(7.)Pellet081000008100000Tons per Annum(TPA)Conveyor Belt
(8.)Lime/Dolo400000400000800000Tons per Annum(TPA)Conveyor Belt
(9.)Crude Steel300000050000008000000Tons per Annum(TPA)OthersInternal transport by rail
(10.)Hot Metal328000054700008750000Tons per Annum(TPA)OthersInternal transport by rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sinter Plant1 x 496 sq m-1 x 496 sq mPlease see Annexure 3 of additional attachments
(2.)Lime Calcining Plant2 x 600 TPD2 x 600 TPD4 x 600 TPDPlease see Annexure 3 of additional attachments
(3.)LF-2 x 310 t2 x 310 tPlease see Annexure 3 of additional attachments
(4.)LP Mill-2.0 MTPA2.0 MTPAPlease see Annexure 3 of additional attachments
(5.)Captive Power Plant2 x 67.5 MW2 x 67.5 MW4 x 67.5 MWPlease see Annexure 3 of additional attachments
(6.)By product recovery type coke ovens2 x 88 Ovens, 5 m tall3 x 62 Ovens, 6.25 m tall2 x 88 ovens, 3 x 62 ovensPlease see Annexure 3 of additional attachments
(7.)Pellet Plant-1 x 744 sq m1 x 744 sq mPlease see Annexure 3 of additional attachments
(8.)CAS-OB1 x 310 t-1 x 310 tPlease see Annexure 3 of additional attachments
(9.)Blast Furnace1 x 4300 cum1 x 5870 cum1 x 4330 cum, 1 x 5870 cumPlease se Annexure 3 of additional attachments
(10.)RH-1 x 310 t twin RH1 x 310 t twin RHPlease see Annexure 3 of additional attachments
(11.)Hot Strip Mill5.5 MTPAUpgradation by 1.5 MTPA7.0 MTPAPlease see Annexure 3 of additional attachments
(12.)BOF/LD2 x 300 t1 x 310t3 x 310 tPlease see Annexure 3 of additional attachments
(13.)Cold Rolling Mill2.2 MTPA-2.2 MTPAPlease see Annexure 3 of additional attachments
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Mar 2020
(iv)Valid Upto 31 Mar 2021
(v)File No. 3938/IND-I-CON-6447
(vi)Application No. ID No. 2766418
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 21000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2620
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 42.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 14614814
(b)Existing quantity of raw material/fuel 9480000
(c)Total quantity of raw material/fuel 24094814
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lump Ore/External Pellet1471400Tons per AnnumImport/Domestic (Captive mines/local sources)Road,Rail400 OthersCaptive mines/open marketCopy of Linkage
(2.)Non coking coal for PCI1600000Tons per AnnumImport/Domestic (Captive mines/local sources)Road,Rail600 OthersCaptive mines/open marketCopy of Linkage
(3.)Ferro Alloy57670Tons per AnnumImport/DomesticRoad,Rail300 Open MarketCopy of Linkage
(4.)Iron Ore fines12132070Tons per AnnumImport/Domestic (Captive mines/local sources)Road,Rail400 OthersCaptive mines and open marketCopy of Linkage
(5.)Scrap500000Tons per AnnumDomesticRoad,Rail300 Open MarketCopy of Linkage
(6.)Anthracite coal95438Tons per AnnumImport/Domestic (local sources)Road,Rail300 Open MarketCopy of Linkage
(7.)Limestone2152973Tons per AnnumImport/DomesticRoad,Rail300 Open MarketCopy of Linkage
(8.)Bentonite56000Tons per AnnumImport/DomesticRoad,Rail300 Open MarketCopy of Linkage
(9.)Pyroxenite/Olivine/Quartzite667697Tons per AnnumImport DomesticRoad,Rail300 Open MarketCopy of Linkage
(10.)DRI432000Tons per AnnumDomesticRoad,Rail300 Open MarketCopy of Linkage
(11.)Coking coal4929566Tons per AnnumImport/Domestic (Captive mines/local sources)Road,Rail600 OthersCaptive mines/Open marketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 22 Dec 2016 To 27 Mar 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube67.236.160.560
(2.)SO2Micro Gram per Meter Cube25.45.223.780
(3.)NOxMicro Gram per Meter Cube4022.139.380
(4.)OthersO3Micro Gram per Meter Cube36.51036.5100
(5.)PM10Micro Gram per Meter Cube105.566.6102.8100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.086.166.58.5
(2.)TSSOthersNTU10.261.2615
(3.)Fluoridemg/l0.10.111.5
(4.)Heavy MetalsChromiummg/l0.010.010.050.05
(5.)OthersAsmg/l0.010.010.010.05
(6.)Total Hardnessmg/l370.67110200600
(7.)TDSmg/l1113.33215.505002000
(8.)Chloridesmg/l139.3118.642501000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.27.1B
(2.)DOmg/l6.25.4B
(3.)OthersFecal ColiformOthersMPN/100ml230120B
(4.)BODmg/l10.33.0B
(5.)CODmg/l37.89.6B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))78.756.3NA
(2.)Leq(Night)A-weighted decibels(dB(A))69.648.3NA
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.387.1
(2.)N(Nitrogen)Milligram per Kilogram890482
(3.)P(Phosphorus)Milligram per Kilogram680360
(4.)Electric ConductivityOthersdS/m0.350.28
(5.)K(Potassium)Milligram per Kilogram1680982
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.05 To 8.38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.92 To 4.58
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface11270414Copy of Permission LetterPipelineIntake Well24977/WR07 Nov 2019181829.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Captive Power Plant28082808Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling2808
(2.)CRM42724272Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling4272
(3.)HSM and LP Mills14401440Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling1440
(4.)Soft water plant, DM Water plant and miscellaneous42484248Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling4248
(5.)Air Separation Plant10561056Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling1056
(6.)Coke ovens and byproduct plant81128112Effluent would be treated in BOD plant a part of which would undergo tertiary treatment and be reused as plant make up. Balance will be treated in CETP for reuseReuse within the Plant & Recycling8112
(7.)Sinter and Pellet Plant168168Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling168
(8.)Sewage Treatment Plant23042304Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling2304
(9.)SMS20882088Reuse as plant makeup water after treatment in CETPReuse within the Plant & Recycling2088
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 26496
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 26496
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Coal Tar and BOD SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)100000Tons0OthersNAOthersRecycled back in Coke Ovens
(2.)Flue dustsIndustrial Waste82469Tons0OthersNAOthersReused in process
(3.)Chrome SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)SMS SlagIndustrial Waste1200000Tons0OthersNAOthersReused after processing in MRP
(5.)Mill scale/sludgeIndustrial Waste58214Tons0OthersNAOthersReused in Sinter Plant
(6.)BF SlagIndustrial Waste2648132Tons500Road,RailOthersSold as granulated BF Slag
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube51.73.750.552.2160
(2.)NOxMicrogram per Meter Cube34.12.83.437.5180
(3.)SO2Microgram per Meter Cube24.94.30.525.4180
(4.)PM10Microgram per Meter Cube96.74.9197.71100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)COB#4By product gas1504.5PM101.35
(2.)COB#3By product Gas1504.5PM101.35
(3.)COB#5By product gas1504.5PM101.35
(4.)COB#5DENA302.5PM101.44
(5.)COB#2CDQNA302.0PM100.65
(6.)PLP#Discharge&HLSBDENA352.0PM101.51
(7.)PLP#Dryer1&2DENA553.9PM104.33
(8.)PLP#BallMill1DENA552.3PM101.25
(9.)BF#2StoveMixed Gas806.3PM106.67
(10.)BF#2CH2NA355.4PM1010.5
(11.)BOF#SE2NA706.8PM102.5
(12.)LF1#FENA703.5PM102.58
(13.)LF2#FENA703.5PM102.58
(14.)CRMPLTCM#1PFNA300.85PM100.2
(15.)CRMPLTCM#1DENA300.6PM100.25
(16.)CRMPLTCM#1TCMFNA300.6PM103.0
(17.)CRMCGL#1-2SPMNA600.6PM100.17
(18.)PLP#waste gasBy product gas878.5PM1032.29
(19.)Lime Kiln#3By product gas551.6PM100.67
(20.)Lime Kiln#4By product gas551.6PM100.67
(21.)LP Mill1By product gas653.0PM101.25
(22.)LP Mill 2By product gas653.0PM101.25
(23.)CPP1#4By product gas1203.4PM102.78
(24.)COB#3By product gas1504.5SO218.0
(25.)COB#4By product gas1504.5SO218.0
(26.)COB#5By product gas1504.5SO218.0
(27.)CRM CAL#1-1By product gas450.6PM100.56
(28.)CRM CGL#1-1By product gas600.6PM100.65
(29.)COB#3 CDQNA302.0SO213
(30.)CRM CGL#2-1By product gas600.6SO23.25
(31.)LP Mill 1By product gas653SO24.17
(32.)COB#3By product gas1504.5NOx9
(33.)CPP1#3By product gas1203.4SO25.56
(34.)CPP1#4By product gas1203.4SO25.56
(35.)IncineratorNA301.0SO20.42
(36.)COB#4By product gas1504.5NOx9
(37.)COB#5By product gas1504.5NOx9
(38.)COB #3 CDQNA302.0NOx6.50
(39.)PLP Waste gasBy product gas878.5NOx121.08
(40.)BF#2 stoveBy product gas806.3NOx25.0
(41.)CRM CGL#2-1By product gas600.6NOx5.42
(42.)LP Mill 2By product gas653.0NOx12.50
(43.)CPP1#3By product gas1203.4NOx22.22
(44.)COB#3CDQNA302PM100.65
(45.)PLP#BallMill2DENA552.3PM101.25
(46.)CRMARP#1AFNA300.6PM100.03
(47.)CRMARP#1DENA300.6PM100.17
(48.)HSM RHF#3By product gas853.1PM101.55
(49.)CRM CGL#2-1By product gas600.6PM100.65
(50.)COB#4DENA302.5PM101.44
(51.)COB#2 CDQNA302.0SO213
(52.)CRM CAL#1-1By product gas450.6SO22.79
(53.)CRM CGL#1-1By product gas600.6SO23.25
(54.)LP Mill 2By product gas653.0SO24.17
(55.)CRM CAL#1-1By product gas450.6NOx4.65
(56.)CPP1#3By product gas1203.4PM102.78
(57.)COB#3DENA302.5PM101.44
(58.)BF#2CH1NA355.4PM1010.5
(59.)CRMCAL#1-2SPMNA450.6PM100.17
(60.)PLP Waste gasBy product gas878.5SO240.36
(61.)BF#2 StoveBy product gas806.3SO233.33
(62.)HSM RHF#3By product gas853.1SO25.17
(63.)IncineratorNA301.0PM100.08
(64.)HSM RHF#3By product gas853.1NOx15.5
(65.)CRM CGL#1-1By product gas600.6NOx5.42
(66.)CPP1#4By product gas1203.4NOx22.22
(67.)BF#2SHIF1NA353.8PM105.0
(68.)BF#2SHIF2NA353.8PM105.0
(69.)COB#2 CDQNA302.0NOx6.50
(70.)LP Mill 1By product gas653.0NOx12.50
(71.)BF#2SHCFNA352.8PM102.83
(72.)CRMCGL#2-2SPMNA600.6PM100.17
(73.)IncineratorNA301.0NOx0.69
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 664000
(b)Source Grid,Captive power & open Access
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 57400 kVA
(e)Stack Height (in m) 79
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1405
    Total Land (ha.) 1405
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1405
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : others 0
    Total (ha.) 1405.0000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Water Reservoir84
(2.)Green belt101Peripheral greenery area:364 ha
(3.)Main Plant745
(4.)OthersVacant Area475
Total (ha.) 1405
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA0NA
(2.)CorridorsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)NPANA0NA
(5.)Critically Polluted AreaNA0NA
(6.)ESAsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDangadi PF5Protected Forest
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmani River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 6.75
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 1500
(c)Temporary Employment- During Construction 15000
(d)Temporary Employment- During Operation 2000
(e)No. of working days 330
(f)Total Manpower 19000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area26733
(2.)Total Area of Green Belt36599464
(3.)No. of Plants584000160000744000
(4.)Funds Allocated23360000080000000313600000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialPeripheral Development activities. Promotion of ancillary businesses and development of local economy. Social upliftment through CER activities
(2.)EnvironmentalImprovemnt through greenery development and improvement of road conditions
(3.)FinancialRevenue generation through taxes and duties
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court NGT
(c)Name of the Sub Court NGT Eastern Zone
(d)Case No. OA No.169/2016/EZ
(e)Orders/Directions of the court ,if any and its relevance with the proposed project -
(f)Case Details Forest Clearance
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0131
(ii)Name of the EIA Consultant M N Dastur & Co. (P) Ltd
(iii)Address M N Dastur & Co. (P) Ltd, P-17 Mission Row Extn, Kolkata 700013
(iv)Mobile No. 9433341156
(v)Landline No. 0332225050
(vi)Email Id sandip.m@dastur.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 17 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following shortcomings: Existing project: i. Details of the construction activities undertaken from 7/11/2016 to till date. ii. Permission obtained from MoEF&CC if any, for undertaking construction of balanced facilities envisaged in the existing EC dated 7/11/2006 after the expiry of the validity period of the EC. If no, reasons for undertaken construction activity after the expiry of the validity period of the EC shall be submitted. iii. Copies of Consent to Operate obtained from OSPCB from 7/11/2016 to till date. EIA report: i. EIA report is silent on the implementation status of the existing Environmental Clearances accorded by MoEF&CC and the details of the ongoing construction activities at the site at present. ii. Consolidated water balance diagram for the existing and proposed expansion shall be furnished. iii. Figure numbers mentioned in the EIA report does not match with description. For instance, Fig. No. 3-12 is post monsoon water level in the study area whereas in description it is mentioned as land use map. Overall EIA report needs to be re-checked. iv. Satellite image of the land cover/land use map of the study area has not been furnished. v. Noise quality modelling has not been carried out. vi. Action plan for solid waste utilization has not been submitted. vii. Traffic assessment study has not been carried out. viii. Quantity of raw materials and finished products to be specifically transported by road and rail has not been furnished. ix. Confirmed iron ore linkage for the proposed expansion has not been furnished. x. Material balance and Energy balance has not been furnished. xi. BOD plant details for the treatment of coke oven plant have not been furnished. xii. Risk assessment has not been carried out specific to the project activity. No scientific tools have been used to quantify the risk. xiii. Cost earmarked towards the CER is not as per the slab specified in the Ministry’s O.M. dated 1/05/2018. xiv. EMP is generic and not specific to the proposed expansion. xv. Input file used for the AAQ modelling shall be furnished. Form 2: S.No. 7.1: Complete PH proceedings inter-alia including attendance sheet and written representations have not been furnished. S.No.9: Certified compliance report for all the existing ECs is not accessible on PARIVESH. On perusal of the report received through email, it is noted that non-compliances have been reported in respect of excess water drawl beyond the permitted capacity, discharge of waste water and de-siltation of drain at raw material storage. It is requested to obtain the closure report from the Regional Office on the observed non-compliance’s. S.No. 9(b): Details of capacity expansion of all the facilities have not been mentioned. S.No.36: Court orders uploaded on PARIVESH is not accessible. 08 Jan 2020
2.NAProposal is returned due to the following shortcomings: Existing project: i. Details of the construction activities undertaken from 7/11/2016 to till date. ii. Permission obtained from MoEF&CC if any, for undertaking construction of balanced facilities envisaged in the existing EC dated 7/11/2006 after the expiry of the validity period of the EC. If no, reasons for undertaken construction activity after the expiry of the validity period of the EC shall be submitted. iii. Copies of Consent to Operate obtained from OSPCB from 7/11/2016 to till date. EIA report: i. EIA report is silent on the implementation status of the existing Environmental Clearances accorded by MoEF&CC and the details of the ongoing construction activities at the site at present. ii. Consolidated water balance diagram for the existing and proposed expansion shall be furnished. iii. Figure numbers mentioned in the EIA report does not match with description. For instance, Fig. No. 3-12 is post monsoon water level in the study area whereas in description it is mentioned as land use map. Overall EIA report needs to be re-checked. iv. Satellite image of the land cover/land use map of the study area has not been furnished. v. Noise quality modelling has not been carried out. vi. Action plan for solid waste utilization has not been submitted. vii. Traffic assessment study has not been carried out. viii. Quantity of raw materials and finished products to be specifically transported by road and rail has not been furnished. ix. Confirmed iron ore linkage for the proposed expansion has not been furnished. x. Material balance and Energy balance has not been furnished. xi. BOD plant details for the treatment of coke oven plant have not been furnished. xii. Risk assessment has not been carried out specific to the project activity. No scientific tools have been used to quantify the risk. xiii. Cost earmarked towards the CER is not as per the slab specified in the Ministry’s O.M. dated 1/05/2018. xiv. EMP is generic and not specific to the proposed expansion. xv. Input file used for the AAQ modelling shall be furnished. Form 2: S.No. 7.1: Complete PH proceedings inter-alia including attendance sheet and written representations have not been furnished. S.No.9: Certified compliance report for all the existing ECs is not accessible on PARIVESH. On perusal of the report received through email, it is noted that non-compliances have been reported in respect of excess water drawl beyond the permitted capacity, discharge of waste water and de-siltation of drain at raw material storage. It is requested to obtain the closure report from the Regional Office on the observed non-compliance’s. S.No. 9(b): Details of capacity expansion of all the facilities have not been mentioned. S.No.36: Court orders uploaded on PARIVESH is not accessible. 08 Jan 2020
3.NAProposal is returned due to the following shortcomings: Existing project: i. Details of the construction activities undertaken from 7/11/2016 to till date. ii. Permission obtained from MoEF&CC if any, for undertaking construction of balanced facilities envisaged in the existing EC dated 7/11/2006 after the expiry of the validity period of the EC. If no, reasons for undertaken construction activity after the expiry of the validity period of the EC shall be submitted. iii. Copies of Consent to Operate obtained from OSPCB from 7/11/2016 to till date. EIA report: i. EIA report is silent on the implementation status of the existing Environmental Clearances accorded by MoEF&CC and the details of the ongoing construction activities at the site at present. ii. Consolidated water balance diagram for the existing and proposed expansion shall be furnished. iii. Figure numbers mentioned in the EIA report does not match with description. For instance, Fig. No. 3-12 is post monsoon water level in the study area whereas in description it is mentioned as land use map. Overall EIA report needs to be re-checked. iv. Satellite image of the land cover/land use map of the study area has not been furnished. v. Noise quality modelling has not been carried out. vi. Action plan for solid waste utilization has not been submitted. vii. Traffic assessment study has not been carried out. viii. Quantity of raw materials and finished products to be specifically transported by road and rail has not been furnished. ix. Confirmed iron ore linkage for the proposed expansion has not been furnished. x. Material balance and Energy balance has not been furnished. xi. BOD plant details for the treatment of coke oven plant have not been furnished. xii. Risk assessment has not been carried out specific to the project activity. No scientific tools have been used to quantify the risk. xiii. Cost earmarked towards the CER is not as per the slab specified in the Ministry’s O.M. dated 1/05/2018. xiv. EMP is generic and not specific to the proposed expansion. xv. Input file used for the AAQ modelling shall be furnished. Form 2: S.No. 7.1: Complete PH proceedings inter-alia including attendance sheet and written representations have not been furnished. S.No.9: Certified compliance report for all the existing ECs is not accessible on PARIVESH. On perusal of the report received through email, it is noted that non-compliances have been reported in respect of excess water drawl beyond the permitted capacity, discharge of waste water and de-siltation of drain at raw material storage. It is requested to obtain the closure report from the Regional Office on the observed non-compliance’s. S.No. 9(b): Details of capacity expansion of all the facilities have not been mentioned. S.No.36: Court orders uploaded on PARIVESH is not accessible. 08 Jan 2020
4.NAThe correction have been made as per the instruction received 13 Jun 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of Additional Information for Environmental Clearance proposal for Expansion of Integrated Steel Plant Expansion from 6 to 8 MTPA Crude Steel and 9 MTPA Finished Steel by Tata Steel Limited at Kalinganagar Industrial Complex 11 Nov 2020
2.NA

Proposal deferred for want of additional information

15 Sep 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajiv Kumar
DesignationVice President- Operations,TSk
Name of Company (Applicant Name should not be given here)TATASTEEL KALINGANAGAR
AddressKNIC, DUBURI-755026, DIST JAJPUR, ODISHA