1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed expansion Project for Manufacturing of Synthetic Organic Chemicals (Acrylic Co- Polymers for Construction Chemicals & Other Industries) | (b)Name of the Company / Organisation | CHRYSO INDIA PRIVATE LIMITED | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Harish Kajaya | (b)Designation (Owner/ Partner/ CEO) | VP | (c)Address | Plot No. d-30/7, TTC Industrial Area. MIDC, Turbhe, Navi Mumbai, 400705,,Thane,Thane,Maharashtra-400705 | (d)Pin code | 400705 | (e)E-mail | harish.kajaya@chryso.com | (f)STD Code. | 22(f)Telephone No. | 27685991 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/113824/2019 | (d)Master Proposal Number(Single Window) | SW/127903/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No, E-72 | (b)Pincode | 410220 | (c)Bounded Latitudes (North) | | From | | Degree | 18.87666667 | Minutes | | Second | | From | | Degree | 73.16333333 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 18.87527778 | Minutes | | Second | | From | | Degree | 73.16333333 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43H1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 8 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.66 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Raigad | Panvel | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/253/2019-IA-II(I) | (b)Date of Apply of TOR | 11 Sep 2019 | (c)Date of Issue of TOR / Standard ToR | 23 Oct 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As the proposed project is situated in Industrial | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Batch Reactor process | Acrylic co-polymer | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Acrylic Co-Polymer (Speciality chemical for Cement Admixtures) | 48000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 May 2018 | (iv)Valid Upto | 28 Feb 2020 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7.8 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.35 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 19.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5025 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 28956 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 28956 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Hydrogen Peroxide | 180 | Tons per Annum | | India | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Ascorbic Acid | 96 | Tons per Annum | | India | Road | | 50 | Open Market | | Copy of Linkage | (3.) | Polyethylene Glycol 1000 | 25680 | Tons per Annum | | India | Road | | 1200 | Open Market | | Copy of Linkage | (4.) | Acrylic monomers | 2580 | Tons per Annum | | India | Road | | 50 | Open Market | | Copy of Linkage | (5.) | Caustic Flakes | 12 | Tons per Annum | | India | Road | | 50 | Open Market | | Copy of Linkage | (6.) | Sodium Hypophosphite | 408 | Tons per Annum | | India | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 96.4 | 42.5 | 89 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58 | 20 | 57 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 12 | 6 | 10 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 49 | 8 | 44 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 0.78 | 0.22 | 0.72 | 2 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 353 | 176 | 200 | 600 | (2.) | Chlorides | | | mg/l | | 247 | 19 | 250 | 1000 | (3.) | TSS | | | Others | Not analysed | 0 | 0 | 0 | 0 | (4.) | Heavy Metals | | Lead | mg/l | | 0 | 0 | 0 | 0 | (5.) | Fluoride | | | mg/l | | 0.18 | 0.1 | 1 | 1.5 | (6.) | pH | | | NA | | 8.31 | 7.70 | 6.58 | 8.5 | (7.) | TDS | | | mg/l | | 910 | 248 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 6.8 | 1.99 | D | (2.) | COD | | mg/l | | 40 | 3.99 | D | (3.) | Others | Faecal coliform | Others | MPN/100ml | 70 | 1.7 | E | (4.) | DO | | mg/l | | 6.4 | 5.4 | D | (5.) | Others | Total coliform | Others | MPN/100ml | 540 | 41 | E | (6.) | Others | TSS | mg/l | | 41 | 3.5 | D | (7.) | pH | | NA | | 8.12 | 7.26 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 72.8 | 42.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.5 | 40.8 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 347 | 118 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 7.7 | 2.9 | (3.) | K(Potassium) | Milligram per Kilogram | | 488 | 107 | (4.) | pH | | | 7.47 | 6.22 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 280 | 76 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.5 To 4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC | 63 | 1.47 | Copy of Permission Letter | Pipeline | | Others | piped supply | 070610257 | 18 Nov 2017 | 45 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process | 0.27 | 10 | ZLD | Reuse within the Plant & Recycling | | 0.27 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0.27 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0.27 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used/Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Kilolitre | 50 | Road | | Authorized Recyclers | | (2.) | Chemical Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 109.5 | Kilolitre | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Bags and Liners | Municipal Solid Waste | | 48 | Tons | 50 | Road | | Authorized Recyclers | | (4.) | Contaminated Rags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.1 | Tons | 50 | Road | | Authorized Recyclers | | (5.) | Jumbo bags | Municipal Solid Waste | | 5 | Tons | 50 | Road | | Authorized Recyclers | | (6.) | Empty Barrels | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 50 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | NA | 58.5 | 0 | 0 | 59 | 60 | (2.) | NOx | | Microgram per Meter Cube | 32.3 | 0.44 | 4.35 | 36.70 | 80 | (3.) | Others(Specify) | HC | Microgram per Meter Cube | 1.9 | 0.03 | 0.30 | 2.2 | NA | (4.) | SO2 | | Microgram per Meter Cube | 7.7 | 0.28 | 7.62 | 15.5 | 80 | (5.) | PM10 | | Microgram per Meter Cube | 79.2 | 0.45 | 2.67 | 81.88 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | HSD | 18 | 0.3 | SO2 | | 0.00445 | (2.) | DG Set | HSD | 4 | 0.1 | SO2 | | 0.17 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 185 | (b)Source | Maharashtra State Electricity Distribution Company | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 250KVA | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0.8001 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.8001 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.011 | (b)Waste/Barren Land (ha.) | 0.008 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0.0002 | (e)Settlements (ha.) | 0.0012 | (f)Industrial (ha.) | 0.001 | (g)Forest (ha.) | 0.008 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : River road rail sanctuary | 0.002 | Total (ha.) | 0.0314 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | On existing facility production shed | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not present | 0 | Industrial Area | (2.) | Wildlife Corridors | Not present | 0 | Industrial Area | (3.) | ESAs | Karnala Bird Sanctuary | 2.67 | West of proposed facility | (4.) | Critically Polluted Area | Not present | 0 | Industrial Area | (5.) | NPA | Not present | 0 | Industrial Area | (6.) | Corridors | Not present | 0 | Industrial Area | (7.) | ESZs | Karnala Eco-Sensitive Zone | 3.62 | West of proposed facility | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Karnala Forest | 2.67 | west of proposed facility | (2.) | Archaeological Sites | | Not present | 0 | Industrial Area | (3.) | Defence Installations | | Not present | 0 | Industrial Area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 15 | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Yes | (iii)Period of Implementation | 2020-2025 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Patalganga River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 0.64 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 20 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.04 | (b)Percentage of Total Project Area | 5.00 | (c)No. of Plants to be Planted | 85 | (d)Funds Allocated for Plantation | 0.03 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The proposed project will have enhanced direct employment for technical/ administrative works and indirect employment opportunities for transporters of construction materials | (2.) | Environmental | The proposed project will not have any major impacts, which can lead to serious issue of environmental pollution or any other hazards | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0055 | (ii)Name of the EIA Consultant | ERM India Private Limited | (iii)Address | ERM India Private Limited Building No.10 Tower A, 4th Floor DLF Cyber City Gurgaon -122002 India | (iv)Mobile No. | 9830094463 | (v)Landline No. | 0124417030 | (vi)Email Id | Debanjan.Bandyopadhyay@erm.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 05 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Kindly find attached files along supporting documents, addressing each clarification points. | 09 Mar 2020 | 2. | NA | The EAC,
during deliberations noted that the project
details mentioned in the EIA report were not consistent with that presented
during the meeting. The EAC, after det | 15 Jan 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Harish Kajaya | Designation | VP | Name of Company (Applicant Name should not be given here) | CHRYSO INDIA PRIVATE LIMITED | Address | Plot No. D-30/7, TTC Industrial Area, MIDC , Turbhe, Navi Mumbai, 400705 |
|