Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) New Chemical Manufacturing Unit namely M/s Balaji Overseas located at Village- Hambran, Near Murti Agro Foods, Hambran road, Tehsil & District- Ludhiana, Punjab
(b)Name of the Company / Organisation BALA JI OVERSEAS
(c)Registered Address Village Hambran Tehsil & District Ludhiana Punjab,,Ludhiana,Punjab-141110
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Subham Bansal
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Village Hambran Tehsil and District Ludhiana Punjab,,Ludhiana (West),Ludhiana,Punjab-141110
(d)Pin code 141110
(e)E-mail balajioverseas2019@gmail.com
(f)STD Code. 161(f)Telephone No. 4062473
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND2/127321/2019
(d)Master Proposal Number(Single Window) SW/127318/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 134//11,12,19,20,22 135//14/2 15,16,17/1, 134//8,9
(b)Pincode 141001
(c)Bounded Latitudes (North)
From
Degree 305450.72
Minutes
Second
From
Degree 305454.68
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 754025.60
Minutes
Second
From
Degree 754028.33
Minutes
Second
(e)Survey of India Topo Sheet No. H43J9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 236
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/56/2019-IA II (I)
(b)Date of Apply of TOR 19 Feb 2019
(c)Date of Issue of TOR / Standard ToR 24 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
M/s Balaji Overseas
State :Punjab
District :Ludhiana
Tehsil :Ludhiana (East)
Village :Hambran,Near Murti agro foods, Hambran road
51Environmental issuesOthersADC
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Chemical Manufacturing UnitFormaldehyde
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1100OthersTPDRoad
(2.)442.5OthersTPDRoad
(3.)242.5OthersTPDRoad
(4.)315OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.09
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.048
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 45
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 45
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol45OthersTPDlocalRoad45 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Mar 2019 To 15 Jun 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube81.972.381.87100
(2.)NOxMicro Gram per Meter Cube30.220.229.880
(3.)PM2.5Micro Gram per Meter Cube44.433.544.2060
(4.)SO2Micro Gram per Meter Cube12.57.112.0080
(5.)OthersCONA0.580.420.5780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.667.486.58.5
(2.)TSSNA0000
(3.)Total Hardnessmg/l287.1267.3200600
(4.)Heavy MetalsFemg/l001.01.0
(5.)Fluoridemg/l0.610.211.01.5
(6.)TDSmg/l4243865002000
(7.)Chloridesmg/l39.724.82501000
(8.)Otherscamg/l59.455.475200
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.407.34B
(2.)DOmg/l7.16.8B
(3.)BODmg/l1.81.5B
(4.)CODmg/l8.47.41B
(5.)OthersTDSmg/l218210B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.544.375
(2.)Leq(Night)A-weighted decibels(dB(A))45.434.270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.127.72
(2.)K(Potassium)Kilogram per hectare6144
(3.)Electric ConductivityOthersumhos/cm407264
(4.)N(Nitrogen)Percent6.342.12
(5.)P(Phosphorus)Kilogram per hectare2.011.52
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 31.22 To 4.32
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.89 To 27.30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2440Copy of Permission LetterPipelineOthersBorewell000106 Nov 2019250
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water1.52.0Septic TankGreen Belt Renewal Plant1.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used/Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.25Kilolitre40RoadAuthorized Recyclers
(2.)waste saltIndustrial Waste60Tons30RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Empty bags/barrelsIndustrial Waste12.5Tons40RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube82.20.33.085.3100
(2.)SO2NA0000.10
(3.)PM2.5NA0000.10
(4.)NOxNA0000.10
(5.)Others(Specify)NANA0000.10
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerFire wood/wood briquette200.40PM100.107
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source PSPCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 350 KVA
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.75
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.75
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.75
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 0.75
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.75
Total (ha.) 0.75
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00
(2.)CorridorsNA00
(3.)WLSNA00
(4.)NPAna00
(5.)Wildlife CorridorsNA00
(6.)ESAsNA00
(7.)ESZsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00
(2.)Defence InstallationsNA00
(3.)Othersna000
(4.)Archaeological SitesNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.75
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 1
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 350
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.25
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0128 rev
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Limited
(iii)Address SCO 20-21, 1st floor, Near Dolphin, Dhakoli, Zirakpur
(iv)Mobile No. 8288079363
(v)Landline No. 0176250949
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPublic Hearing Minutes uploaded was not forwarded by Member Secretary SPCB CER Plan needs to be revised and submitted vis a vis public Hearing issues and socio economic study. Form-2 shall be revised and complete information shall be provided. 05 Dec 2019
2.NAThe correction have been made as per the instruction received 11 Dec 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReference: 18th EAC- Industry-II meeting held on 13th April- 15th April, 2020 Respected Sir, As a follow up of scrutiny of subject proposal, the following submission may be considered against the ADS. It is requested that the proposal may kindly be considered for grant of EC. 01 Jul 2020
2.NA

The EAC during deliberations noted that the project is proposed to be located in the ground water over exploited area. The project proponent has not given proper water balance diagram and effluent treatment mechanisms. Further incremental values of the air quality parameters are found to be at higher level. The Committee after detailed deliberations, deferred the proposal and desired for requisite information/inputs as under:

Print