EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/BR/IND2/28027/2015    ii. MoEFCC File No. : J-11011/15/2015 IA II (I)    iii.Short narrative of the project: BS-IV Project : MS & HSD Quality Up-gradation    iv. Project Sector : Industrial Projects-2    v. Company/Proponent : A M Shaikh
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.BiharBegusaraiBarauni
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 10 Mar 2015 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 27 Nov 2015 x.Project Type: Modernization
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 25 Sep 2007   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: None   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe proposal considered in 5th EAC meeting held during 25-26th February, 2016. The Committee sought following addl. information : 1) Total Plot area of the refinery. Area earmarked for greenbelt. A layout plan may be submitted. 2) Point wise TOR compliance statement. 3) Details of Sulphur balance in the existing and proposed Refinery. 4) GLC for post project SO2 emission is estimated to be 66.9 µg/m3, which seems to be in higher side. Recheck the prediction modeling or clarify with reasons. In this context, air pollution Control measures to be given appropriately to reduce the GLC for SO2 emissions. 5) Proposed unit wise air pollution control devices. 6) Complete water balance chart indicating total water requirement, water losses, wastewater generation and water recycled. 7) Whether unit is a zero discharge unit or plan to be dawn for complete ZLD of existing and proposed expansion. 8) Oily sludge management plan. The Committee underrated the performance of the Co 29 Mar 2016
2. ADS LetterPlease find enclosed additional details and reply to queries sought for BS-IV Project. 26 Apr 2016
3.NAAfter deliberation the committee deferred the proposal for want of following information; i) Certification w.r.t. Validation of EIA-EMP report by accredited consultant. ii) To rework on GLC calculation. iii) ZLD plan with recycle and reuse of wastewater. Accordingly revised value of fresh water to be drawn. iv) Action taken to Compliance of condition existing EC duly inspected by RO of MEF&CC. The proposal was deferred till the desired information is submitted through online. The above information shall be provided with the uploading of minutes on the website. 24 Sep 2016
4. ADS LetterPlease find enclosed response of Barauni Refinery against additional details sought based on minutes of 12th EAC meeting held during 23-24th Aug, 2016 and date of MoEF&CC correspondence on 24.09.2016. 06 Oct 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/1011/010    iii. Name of Consultant: ENVIROTECH EAST PVT LIMITED   iv. Address : ENVIROTECH EAST PVT LIMITED BENGAL AMBUJA COMMERCIAL COMPLEX, UN F - 13, 1050/1, SURVEY PARK, KOLKATA - 700075   v. Mobile No.: 9831929895   vi. Landline No.: 3324188127   vii. Email Id: moshaharig@indianoil.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Shailendra    ii. Designation : Deputy General Manager (HSE)    iii. Name of Company(Applicant Name should not be given here) : INDIAN OIL CORPORATION LIMITED    iv. Address : IOCL Barauni Refinery Begusarai, Bihar v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL