Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance for the proposed Synthetic Resin Plant of M/s Sarara Chemicals
(b)Name of the Company / Organisation SARARA CHEMICALS
(c)Registered Address Vill- Kuakandar, P.O. Bhajanpur, P.S Khoribari,,Darjeeling,West Bengal-734427
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rekha Agarwal
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address Geetanjali Apartment, 1st Floor, Behind Corporation Bank,Sevok Road, Siliguri 734408,Kharibari,Darjeeling,West Bengal-734427
(d)Pin code 734427
(e)E-mail sararachemicals@gmail.com
(f)STD Code. 736(f)Telephone No. 5856699
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND2/72842/2018
(d)Master Proposal Number(Single Window) SW/126534/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. R.S. Plot No 200; L.R. Plot No 481
(b)Pincode 734427
(c)Bounded Latitudes (North)
From
Degree 26.534935
Minutes
Second
From
Degree 26.535280
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 88.149865
Minutes
Second
From
Degree 88.150214
Minutes
Second
(e)Survey of India Topo Sheet No. G45K2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 86
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.2
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalDarjeelingKharibari
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/56/2018-IA-II(I)
(b)Date of Apply of TOR 14 Feb 2018
(c)Date of Issue of TOR / Standard ToR 23 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :4
Khoribari BDO Meeting Hall
State :West Bengal
District :Darjeeling
Tehsil :Kharibari
Village :Dhupibhita
62Proper remidial Measure should be taken, Fire Management System, Solid waste managemnet, Employment generation etcOthersADM and Additional Executive Officer, Siliguri Mahakuma Parishad
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Synthetic resin manufacturing unitverticle boiler, two resin kettle
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Urea- Formaldehyde Resin3780Tons per AnnumRoad
(2.)Phenol- Formaldehyde Resin1620Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.02
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5360.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5360.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Urea1056Tons per AnnumLacalRoad30 Open MarketCopy of Linkage
(2.)Caustic Soda30Tons per AnnumLocalRoad30 Open MarketCopy of Linkage
(3.)Acetic Acid1.92Tons per AnnumLocalRoad30 Open MarketCopy of Linkage
(4.)Formaldehyde 37%3756Tons per AnnumImported / LocalRoad50 Open MarketCopy of Linkage
(5.)Phenol516Tons per AnnumImported / LocalRoad50 Open MarketCopy of Linkage
(6.)Yellow Dextrin Powder/ Maize Starch White0.6Tons per AnnumLocalRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Jan 2018 To 29 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube100.45091.3100
(2.)PM2.5Micro Gram per Meter Cube57.428.239.360
(3.)SO2Micro Gram per Meter Cube8.15.16.880
(4.)NOxMicro Gram per Meter Cube49.223.337.080
(5.)OthersCOMili Gram per Meter Cube0.430.090.194
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthers--7.475.88.58.5
(2.)TSSmg/l0005
(3.)Chloridesmg/l62.517.92501000
(4.)Heavy MetalsArsenicmg/l000.010.05
(5.)TDSmg/l181.256.45002000
(6.)Total Hardnessmg/l128.540.5200600
(7.)Fluoridemg/l0011.5
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.476.03A
(2.)BODmg/l4.32.8D
(3.)CODmg/l15.55.9C
(4.)OthersTotal coliformOthersMPN/100 ml11200760D
(5.)DOmg/l7.71.2D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.236.955
(2.)Leq(Night)A-weighted decibels(dB(A))50.225.845
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.116.21
(2.)N(Nitrogen)Percent30.60.05
(3.)P(Phosphorus)Percent1.030.03
(4.)K(Potassium)Percent3.30.02
(5.)Electric ConductivityOthersumohs/cm25801225
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.1 To 9.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.2 To 4.6
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. P0512033004810000001TSE
(f)Date of Issue 01 Oct 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater4.60 Not Appliacble PipelineTube WellP0512033004810000001TSE01 Oct 201815
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.90.9Septik Tank, Soak PitOthersNo discharge0.90
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0.9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste3Tons1RoadOthersDisposal to panchayat VAT
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube74.440.850.0475100
(2.)SO2Microgram per Meter Cube5.990.850.016.0180
(3.)NOxMicrogram per Meter Cube60.970.850.016180
(4.)Others(Specify)COMicrogram per Meter Cube0.40.8500.424
(5.)PM2.5Microgram per Meter Cube36.8003760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerCoal300.4PM100.04
(2.)BoilerCoal300.4SO20.01
(3.)BoilerCoal300.4NOx0.008
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 48
(b)Source WBSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 no of 50kVA DG set
(e)Stack Height (in m) 1.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.13
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.13
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22194.18
(b)Waste/Barren Land (ha.) 599.94
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1028.7
(e)Settlements (ha.) 2930.67
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plantation, vegetation and scrub area 4686.21
    Total (ha.) 31439.699999999997
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.03
(2.)Green belt0.05
(3.)OthersVacant land and Parking Area0.05
Total (ha.) 0.13
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA50None within 10 km
(2.)NPANA45None within 10 km
(3.)ESZsNA48None within 10 km
(4.)CorridorsNA50None within 10 km
(5.)Critically Polluted AreaNA50None within 10 km
(6.)Wildlife CorridorsNA60None within 10 km
(7.)ESAsNA80None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA40None within 10 km
(2.)ForestNA30None within 10 km
(3.)Defence InstallationsNA45None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.13
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 1
(e)No. of working days 300
(f)Total Manpower 16
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.5
(b)Percentage of Total Project Area 384.62
(c)No. of Plants to be Planted 60
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGround water level enhancing by recharging
(2.)SocialEmployment Generation for local people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0094
(ii)Name of the EIA Consultant Ultra Tech Environmental Consultancy & Laboratory
(iii)Address Unit No. 224, 225, 206, Jai Commercial Complex, 463 Eastern Express Highway, Khopat, Thane (W) - 400601
(iv)Mobile No. 9674488198
(v)Landline No. 0222534277
(vi)Email Id debasish@ultratech.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Product list for which EC is required is not mentioned in the Form-2. (ii) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. (iii) In S. No. 2 of Form 2, the Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency has not been submitted. (iv) In S. No. 7.1 of Form 2, the correspondence letter from MS, SPCB on PH has not been uploaded. Also issues raised during the public hearing has not been addressed. The details of action plan on the issues raised during PH along with budgetary provisions & timelines needs to be submitted. (v) The Period of Base Line Data Collection has been submitted during January to March 2018 however it should be ether December –February, March to May and October – December (vi) In view of the above, PP/Consultant are requested to revise the application for grant of EC and accordingly revise the Form 2 alongwith EIA/EMP Reports. The EIA/EMP Reports shall match with the information as filled in Form 2. On examination it is observed that the Consultant has not adequately submit the application as per the provisions of the EIA Notification, 2006. 07 Jan 2020
2.NAThe correction have been made as per the instruction received 01 Feb 2020
3.NAThe correction have been made as per the instruction received 01 Feb 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRekha Agarwal
DesignationProprietor
Name of Company (Applicant Name should not be given here)SARARA CHEMICALS
AddressVill- Kuakandar, P.O. Bhajanpur, P.S Khoribari