1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Chemox International | (b)Name of the Company / Organisation | CHEMOX INTERNATIONAL | (c)Registered Address | Plot No-6605, GIDC Estate, Ankleshwar,Dist-Bharuch-393002,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Manshukh Vekaria | (b)Designation (Owner/ Partner/ CEO) | CEO | (c)Address | Plot No-6605, GIDC Estate, Ankleshwar, Dist-Bharuch-393002,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | chemoxinternational2016@gmail.com | (f)STD Code. | 2646(f)Telephone No. | 000000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/126408/2015 | (d)Master Proposal Number(Single Window) | SW/126394/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No: 6605, GIDC Estate, Ankleshwar, Dist:- Bha | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21.619189 | Minutes | | Second | | From | | Degree | 21.668844 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.040097 | Minutes | | Second | | From | | Degree | 73.040131 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 22 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/00/2019-IA-II (I) | (b)Date of Apply of TOR | 16 Jun 2015 | (c)Date of Issue of TOR / Standard ToR | 19 Aug 2015 | (d)Date of Apply of EC | 12 Apr 2017 | (e)Date of Issue of EC | 30 Nov 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | No | (c)Reason | Project site is located in the notified industrial area. | (d)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 00000 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 13 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Azo Pigments Group | 0 | 24 | 24 | Tons per Annum(TPA) | | Road | | (2.) | M-8 (n-cyano ethyl methyl aniline) | 0 | 36 | 36 | Tons per Annum(TPA) | | Road | | (3.) | Disperse Dyes Group (Miscellaneous Type) | 0 | 36 | 36 | Tons per Annum(TPA) | | Road | | (4.) | Disperse Dyes (Azo Group) | 0 | 300 | 300 | Tons per Annum(TPA) | | Road | | (5.) | Dispersing Agent SS | 0 | 60 | 60 | Tons per Annum(TPA) | | Road | | (6.) | Ramazole Yellow FG- Di | 9.6 | -9.6 | 0 | Tons per Annum(TPA) | | Road | | (7.) | Ramazole Orange-2R | 2.4 | -2.4 | 0 | Tons per Annum(TPA) | | Road | | (8.) | Ramazole Golden- R | 1.2 | -1.2 | 0 | Tons per Annum(TPA) | | Road | | (9.) | Flourocent Pink | 3.6 | -3.6 | 0 | Tons per Annum(TPA) | | Road | | (10.) | flourocent Golden | 1.2 | -1.2 | 0 | Tons per Annum(TPA) | | Road | | (11.) | Ramazole Black B | 3.6 | -3.6 | 0 | Tons per Annum(TPA) | | Road | | (12.) | Flourocent Lemon Yellow | 4.8 | -4.8 | 0 | Tons per Annum(TPA) | | Road | | (13.) | Flourocent Orange | 2.4 | -2.4 | 0 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | GLR Reactor | 0 | 3 KL | 3 KL | 1 No. | (2.) | Sand Mill | 0 | 125 Liter | 125 Liter | 2 Nos. | (3.) | Transfer Pump | 0 | 3 HP | 3 HP | 3 Nos. | (4.) | MSRLTL | 10 KL | 0 | 10 KL | 1 No. | (5.) | MSRLTL | 18 KL | 0 | 18 KL | 1 No. | (6.) | Spray Dryer | 0 | 1 | 1 | 1 No. | (7.) | S S Reactor | 0 | 10 KL | 10 KL | 1 No. | (8.) | Filter Press | 36 Inch | 36 Inch | 36 Inch | 3 Nos. | (9.) | Tray Dryer | 200 Tray | 200 Tray | 200 Tray | 4 Nos. | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 02 Sep 2018 | (iv)Valid Upto | 01 Jun 2023 | (v)File No. | GPCB/ANK/CCA-80(2)/ID-15558 | (vi)Application No. | AWH 95597 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1.5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.25 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.1 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5765 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 8600 | (b)Existing quantity of raw material/fuel | 2800 | (c)Total quantity of raw material/fuel | 11400 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Hydrochloric Acid | 120 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (2.) | Sodium Nitrate | 15 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (3.) | Sodium hydroxide | 30 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (4.) | Dis. Agent 045 (Phenol Base) | 200 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (5.) | Dadamol (Naphthalene based Dispersing agent) | 100 | Tons per Annum | | Local | Road | | 10 | Open Market | | Copy of Linkage | (6.) | Natural Gas | 11400 | Cubic Meter per Day | Nm3 | Gujarat Gas | Others | Pipeline | 0.5 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 48 | 12 | 46 | 80 | (2.) | Others | VOC | Micro Gram per Meter Cube | 4.1 | 0.3 | 3.9 | -- | (3.) | PM10 | | Micro Gram per Meter Cube | 90 | 59 | 88 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 48 | 22 | 46 | 60 | (5.) | SO2 | | Micro Gram per Meter Cube | 48 | 9 | 46 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.2 | 7.1 | 8.2 | 8.5 | (2.) | Chlorides | | | mg/l | | 890 | 110 | 250 | 1000 | (3.) | Fluoride | | | mg/l | | 0.49 | 0.05 | 1 | 1.5 | (4.) | Heavy Metals | | iron | mg/l | | 0.54 | 0.1 | 0.3 | 1 | (5.) | Total Hardness | | | mg/l | | 520 | 120 | 300 | 600 | (6.) | TDS | | | mg/l | | 2130 | 585 | 500 | 2000 | (7.) | TSS | | | mg/l | | 60 | 20 | 100 | 500 | (8.) | Others | Sulphate | | mg/l | | 208 | 28 | 200 | 400 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5 | 3 | C | (2.) | COD | | mg/l | | 10 | 0 | C | (3.) | Others | TDS | mg/l | | 1800 | 250 | C | (4.) | pH | | NA | | 9 | 6 | C | (5.) | BOD | | mg/l | | 10 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 55 | 37 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 65 | 45 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.5 | 7.4 | (2.) | N(Nitrogen) | Milliequivalents per 100 Gram | | 12.5 | 12.0 | (3.) | K(Potassium) | Milliequivalents per 100 Gram | | 1.5 | 1.2 | (4.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 15.2 | 14.6 | (5.) | Electric Conductivity | Others | µmS/cm | 1.45 | 1.17 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Notified Area Office, GIDC, Ankleshwar. | 18 | 0.2 | Copy of Permission Letter | Pipeline | | Others | GIDC Water Supply | NTA/ANK/DEE(WS)/1016 | 20 May 2019 | 18 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 10.5 | 12 | Primary and secondary tratment | Others | ETL-0.7 KLD & CMEE-3 KLD | 6.8 | 3.7 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10.5 | (b)Total Discharged Water (Kilolitre per Day) | 3.7 | (c)Total Reused Water (Kilolitre per Day) | 6.8 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used RO Membrane | Others | RO system | 1 | Tons | 5 | Road | | Others | TSDF to BEIL Ankleshwar | (2.) | Discarded Containers/Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 10 | Road | | Authorized Recyclers | | (3.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 5 | Road | | Others | Storage, Disposal at TSDF of BEIL, Ankleshwar. | (4.) | Spent Carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3 | Tons | 5 | Road | | Others | co-processing or Incineration | (5.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.17 | Kilolitre | 10 | Road | | Others | Reuse in Machinery or send to re-processor | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 90 | 1 | 0.25 | 90.3 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 48 | 1 | 0.83 | 48.9 | 80 | (3.) | NOx | | Microgram per Meter Cube | 48 | 1 | 0.54 | 48.6 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 48 | 1 | 0.25 | 48.3 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler (1TPH) Proposed | Natural Gas | 12 | 0.38 | Others | PM, SO2, NOx | 150, 100, 50 | (2.) | HAG(1lacKcal)2 Nos. Proposed | Natural Gas | 12 | 0.38 | Others | PM, SO2, NOx | 150, 100, 50 | (3.) | Boiler (0.4 TPH)Existing | Natural Gas | 12 | 0.35 | Others | PM, SO2, NOx | 150, 100, 50 | (4.) | HAG (0.5 lacKcal)Existing | Natural Gas | 12 | 0.38 | Others | PM, SO2, NOx | 150, 100, 50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 125 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 150 KLV | (e)Stack Height (in m) | 9 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0.1 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.1 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 4743.53 | (b)Waste/Barren Land (ha.) | 5097.08 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1418.57 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 4562.30 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow Land, degraded , sand land veg | 15661.18 | Total (ha.) | 31482.66 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.04 | Plant Building | (2.) | Green belt | | 0.02 | | (3.) | Others | ETP, Boiler area, Etc. | 0.04 | ETP area, Boiler area, etc. | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | -- | 0 | Not Applicable | (2.) | NPA | -- | 0 | Not Applicable | (3.) | Corridors | -- | 0 | Not Applicable | (4.) | Wildlife Corridors | -- | 0 | Not Applicable | (5.) | WLS | -- | 0 | Not Applicable | (6.) | ESZs | -- | 0 | Not Applicable | (7.) | ESAs | -- | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | -- | 0 | Not Applicable | (2.) | Archaeological Sites | | -- | 0 | Not Applicable | (3.) | Others | No | -- | 0 | Not Applicable | (4.) | Defence Installations | | -- | 0 | Not Applicable | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.1 | (b)Land yet to be acquired(Ha) | 0.1 | (c)Status of Land acquisition if not acquired | Already acquired by GIDC Ankleshwar | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 7 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 8 | (e)No. of working days | 30 | (f)Total Manpower | 15 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.01 | 0.02 | 0.03 | (2.) | Percentage of Total Project Area | 5 | 20 | 25 | (3.) | No. of Plants | 5 | 30 | 35 | (4.) | Funds Allocated | 10000 | 40000 | 50000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation will be 15 Nos. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | (1) pH is found acidic it shows unit is not properly doing neutralization. (2) Unit has not submitted the production, w/w generation and discharged, Hazardous Waste generation and disposal etc details. (3) Unit has not obtained authorization for disposal of ETP sludge. | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Reply to GPCB Dated: 20/09/18 - 1) We are as membe | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 000 | (ii)Name of the EIA Consultant | Jyoti Om Chemical Research Centre Pvt Ltd | (iii)Address | K1 7705/2,3,4, GIDC , Ankleshwer | (iv)Mobile No. | 9824150383 | (v)Landline No. | 0264622029 | (vi)Email Id | info@jyotiom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 18 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) It is noted that there are various deficiencies in Form 2 (viz. S. no. 6, 9.1, etc.) uploaded by the PP and accordingly Revised Form 2 shall be submitted incorporating all the information related to the project.
(ii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted.
(iii) Consent to Operate for the present Industrial operations needs to be submitted.
(iv) Accurate water balance with details of total water and fresh water requirement, and permission/MoU/NOC from concerned regulatory authority needs to be submitted.
(v) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted.
(vi) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted.
(vii) Submit details of existing products as the same is not mentioned in the Form-2.
(viii) Submit plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area.
(ix) Category B project. Reason for submitting proposal at Central Level. | 05 Dec 2019 | 2. | NA | The correction have been made as per the instruction received | 10 Dec 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | The EAC, during
deliberation observed that the unit is being proposed in a very small plot i.e.
1000 sqm. area. Also the project location comes under critically polluted area
i.e. Ankaleshwar. The EAC suggested to carried out alternate site analysis or
to chose another location for the project. Also, the
project proponent need to submit proof
to establish that existing unit is operating with proper prior permission and
to confirm that unit is not vio | 24 Apr 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Manshukh Vekaria | Designation | CEO | Name of Company (Applicant Name should not be given here) | CHEMOX INTERNATIONAL | Address | Plot No-6605, GIDC Estate, Ankleshwar,Dist-Bharuch-393002 |
|