Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Chemox International
(b)Name of the Company / Organisation CHEMOX INTERNATIONAL
(c)Registered Address Plot No-6605, GIDC Estate, Ankleshwar,Dist-Bharuch-393002,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Manshukh Vekaria
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Plot No-6605, GIDC Estate, Ankleshwar, Dist-Bharuch-393002,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail chemoxinternational2016@gmail.com
(f)STD Code. 2646(f)Telephone No. 000000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/126408/2015
(d)Master Proposal Number(Single Window) SW/126394/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No: 6605, GIDC Estate, Ankleshwar, Dist:- Bha
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21.619189
Minutes
Second
From
Degree 21.668844
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.040097
Minutes
Second
From
Degree 73.040131
Minutes
Second
(e)Survey of India Topo Sheet No. F43M14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 22
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/00/2019-IA-II (I)
(b)Date of Apply of TOR 16 Jun 2015
(c)Date of Issue of TOR / Standard ToR 19 Aug 2015
(d)Date of Apply of EC 12 Apr 2017
(e)Date of Issue of EC 30 Nov 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason Project site is located in the notified industrial area.
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 00000
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 13 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Azo Pigments Group02424Tons per Annum(TPA)Road
(2.)M-8 (n-cyano ethyl methyl aniline)03636Tons per Annum(TPA)Road
(3.)Disperse Dyes Group (Miscellaneous Type)03636Tons per Annum(TPA)Road
(4.)Disperse Dyes (Azo Group)0300300Tons per Annum(TPA)Road
(5.)Dispersing Agent SS06060Tons per Annum(TPA)Road
(6.)Ramazole Yellow FG- Di9.6-9.60Tons per Annum(TPA)Road
(7.)Ramazole Orange-2R2.4-2.40Tons per Annum(TPA)Road
(8.)Ramazole Golden- R1.2-1.20Tons per Annum(TPA)Road
(9.)Flourocent Pink3.6-3.60Tons per Annum(TPA)Road
(10.)flourocent Golden1.2-1.20Tons per Annum(TPA)Road
(11.)Ramazole Black B3.6-3.60Tons per Annum(TPA)Road
(12.)Flourocent Lemon Yellow4.8-4.80Tons per Annum(TPA)Road
(13.)Flourocent Orange2.4-2.40Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)GLR Reactor03 KL3 KL1 No.
(2.)Sand Mill0125 Liter125 Liter2 Nos.
(3.)Transfer Pump03 HP3 HP3 Nos.
(4.)MSRLTL10 KL010 KL1 No.
(5.)MSRLTL18 KL018 KL1 No.
(6.)Spray Dryer0111 No.
(7.)S S Reactor010 KL10 KL1 No.
(8.)Filter Press36 Inch36 Inch36 Inch3 Nos.
(9.)Tray Dryer200 Tray200 Tray200 Tray4 Nos.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Sep 2018
(iv)Valid Upto 01 Jun 2023
(v)File No. GPCB/ANK/CCA-80(2)/ID-15558
(vi)Application No. AWH 95597
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5765
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8600
(b)Existing quantity of raw material/fuel 2800
(c)Total quantity of raw material/fuel 11400
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Hydrochloric Acid120Tons per AnnumLocalRoad10 Open MarketCopy of Linkage
(2.)Sodium Nitrate15Tons per AnnumLocalRoad10 Open MarketCopy of Linkage
(3.)Sodium hydroxide30Tons per AnnumLocalRoad10 Open MarketCopy of Linkage
(4.)Dis. Agent 045 (Phenol Base)200Tons per AnnumLocalRoad10 Open MarketCopy of Linkage
(5.)Dadamol (Naphthalene based Dispersing agent)100Tons per AnnumLocalRoad10 Open MarketCopy of Linkage
(6.)Natural Gas11400Cubic Meter per DayNm3Gujarat GasOthersPipeline0.5 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube48124680
(2.)OthersVOCMicro Gram per Meter Cube4.10.33.9--
(3.)PM10Micro Gram per Meter Cube905988100
(4.)PM2.5Micro Gram per Meter Cube48224660
(5.)SO2Micro Gram per Meter Cube4894680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.27.18.28.5
(2.)Chloridesmg/l8901102501000
(3.)Fluoridemg/l0.490.0511.5
(4.)Heavy Metalsironmg/l0.540.10.31
(5.)Total Hardnessmg/l520120300600
(6.)TDSmg/l21305855002000
(7.)TSSmg/l6020100500
(8.)OthersSulphatemg/l20828200400
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l53C
(2.)CODmg/l100C
(3.)OthersTDSmg/l1800250C
(4.)pHNA96C
(5.)BODmg/l100C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))553770
(2.)Leq(Day)A-weighted decibels(dB(A))654575
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.57.4
(2.)N(Nitrogen)Milliequivalents per 100 Gram12.512.0
(3.)K(Potassium)Milliequivalents per 100 Gram1.51.2
(4.)P(Phosphorus)Milliequivalents per 100 Gram15.214.6
(5.)Electric ConductivityOthersµmS/cm1.451.17
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNotified Area Office, GIDC, Ankleshwar.180.2Copy of Permission LetterPipelineOthersGIDC Water SupplyNTA/ANK/DEE(WS)/101620 May 201918
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial10.512Primary and secondary tratmentOthersETL-0.7 KLD & CMEE-3 KLD6.83.7
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10.5
(b)Total Discharged Water (Kilolitre per Day) 3.7
(c)Total Reused Water (Kilolitre per Day) 6.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used RO MembraneOthersRO system1Tons5RoadOthersTSDF to BEIL Ankleshwar
(2.)Discarded Containers/BagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)12Tons10RoadAuthorized Recyclers
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons5RoadOthersStorage, Disposal at TSDF of BEIL, Ankleshwar.
(4.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons5RoadOthersco-processing or Incineration
(5.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.17Kilolitre10RoadOthersReuse in Machinery or send to re-processor
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube9010.2590.3100
(2.)SO2Microgram per Meter Cube4810.8348.980
(3.)NOxMicrogram per Meter Cube4810.5448.680
(4.)PM2.5Microgram per Meter Cube4810.2548.360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (1TPH) ProposedNatural Gas120.38OthersPM, SO2, NOx150, 100, 50
(2.)HAG(1lacKcal)2 Nos. ProposedNatural Gas120.38OthersPM, SO2, NOx150, 100, 50
(3.)Boiler (0.4 TPH)ExistingNatural Gas120.35OthersPM, SO2, NOx150, 100, 50
(4.)HAG (0.5 lacKcal)ExistingNatural Gas120.38OthersPM, SO2, NOx150, 100, 50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 150 KLV
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0.1
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.1
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 4743.53
(b)Waste/Barren Land (ha.) 5097.08
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1418.57
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4562.30
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land, degraded , sand land veg 15661.18
    Total (ha.) 31482.66
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.04Plant Building
(2.)Green belt0.02
(3.)OthersETP, Boiler area, Etc.0.04ETP area, Boiler area, etc.
Total (ha.) 0.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area--0Not Applicable
(2.)NPA--0Not Applicable
(3.)Corridors--0Not Applicable
(4.)Wildlife Corridors--0Not Applicable
(5.)WLS--0Not Applicable
(6.)ESZs--0Not Applicable
(7.)ESAs--0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest--0Not Applicable
(2.)Archaeological Sites--0Not Applicable
(3.)OthersNo--0Not Applicable
(4.)Defence Installations--0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.1
(b)Land yet to be acquired(Ha) 0.1
(c)Status of Land acquisition if not acquired Already acquired by GIDC Ankleshwar
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 7
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 8
(e)No. of working days 30
(f)Total Manpower 15
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.010.020.03
(2.)Percentage of Total Project Area52025
(3.)No. of Plants53035
(4.)Funds Allocated100004000050000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation will be 15 Nos.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act (1) pH is found acidic it shows unit is not properly doing neutralization. (2) Unit has not submitted the production, w/w generation and discharged, Hazardous Waste generation and disposal etc details. (3) Unit has not obtained authorization for disposal of ETP sludge.
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Reply to GPCB Dated: 20/09/18 - 1) We are as membe
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 000
(ii)Name of the EIA Consultant Jyoti Om Chemical Research Centre Pvt Ltd
(iii)Address K1 7705/2,3,4, GIDC , Ankleshwer
(iv)Mobile No. 9824150383
(v)Landline No. 0264622029
(vi)Email Id info@jyotiom.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 18 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) It is noted that there are various deficiencies in Form 2 (viz. S. no. 6, 9.1, etc.) uploaded by the PP and accordingly Revised Form 2 shall be submitted incorporating all the information related to the project. (ii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted. (iii) Consent to Operate for the present Industrial operations needs to be submitted. (iv) Accurate water balance with details of total water and fresh water requirement, and permission/MoU/NOC from concerned regulatory authority needs to be submitted. (v) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (vi) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted. (vii) Submit details of existing products as the same is not mentioned in the Form-2. (viii) Submit plan as per the Ministry’s office memorandum 31st October, 2019 regarding projects located in Critically Polluted Area. (ix) Category B project. Reason for submitting proposal at Central Level. 05 Dec 2019
2.NAThe correction have been made as per the instruction received 10 Dec 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

The EAC, during deliberation observed that the unit is being proposed in a very small plot i.e. 1000 sqm. area. Also the project location comes under critically polluted area i.e. Ankaleshwar. The EAC suggested to carried out alternate site analysis or to chose another location for the project. Also, the project proponent need to submit proof to establish that existing unit is operating with proper prior permission and to confirm that unit is not vio

24 Apr 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManshukh Vekaria
DesignationCEO
Name of Company (Applicant Name should not be given here)CHEMOX INTERNATIONAL
AddressPlot No-6605, GIDC Estate, Ankleshwar,Dist-Bharuch-393002
Print