Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of proposed Mandal Becharji Special Investment Region (Cluster A & B))
(b)Name of the Company / Organisation GUJARAT INDUSTRIAL CORRIDOR CORPORATION
(c)Registered Address 6th Floor, Block 1-2, Udyog Bhavan, Sector 11, GH 4 Circle, Gandhinagar, Gujarat,,Gandhinagar,Gujarat-382016
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jai Prakash Prakash Shivahare
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address M/s Mandal Becharaji Special Investment Region Development Authority (MBSIRDA) Block No. 1-2, 3rd Floor, Udyog Bhavan, Gandhinagar-382017,,Gandhinagar,Gandhinagar,Gujarat-382017
(d)Pin code 382017
(e)E-mail mbsir.env@gmail.com
(f)STD Code. 79(f)Telephone No. 23226015
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Minor Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category A
(c)Proposal Number IA/GJ/NCP/126054/2018
(d)Master Proposal Number(Single Window) SW/126053/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Two clusters: Cluster A - Village: Hansal Becharaj
(b)Pincode 382130
(c)Bounded Latitudes (North)
From
Degree 23.34611
Minutes
Second
From
Degree 23.4576333
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 71.999858333
Minutes
Second
From
Degree 72.088219
Minutes
Second
(e)Survey of India Topo Sheet No. F42F14,F43A2,F43A3,F42F15, F42F15,F42F16,F43A2,F43
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 40
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number IA/GJ/NCP/75764/2018
(c)Date of Apply of TOR 04 Oct 2018
(d)Date of Issue of TOR / Standard ToR 08 Feb 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :3
Main Chowk of Chandaki village, Mahakali Temple
State :Gujarat
District :Mahesana
Tehsil :Becharaji
Village :chandanki
91Disposal of waste water, technology for CETP and STPDistrict Collector
(2.)
Date of Advertisement :06 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :2
Near Grampanchayat Office, Village Gitapur, Taluka- Detroj Rampura, District Ahmentabad
State :Gujarat
District :Ahmedabad
Tehsil :Detroj-Rampura
Village :Gitapur
70Disposal of WastewaterDistrict Collector
(3.)
Date of Advertisement :23 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :4
community hall,thakor vas, vill: sitapur,Ta:Mandal,Dist: Ahmedabad,Gujarat
State :Gujarat
District :Ahmedabad
Tehsil :Mandal
Village :sitapur
108Disposal of WastewaterDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Project area for cluster A5060 Ha.Industrial ,residensial
(2.)Project area for cluster B5150 Ha.Industrial ,residensial
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)00OthersNAOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7231
(b) Funds Allocated for Environment Management (Capital) (in Crores) 208.72
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 36
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 18
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube18.68.118.5880
(2.)PM2.5Micro Gram per Meter Cube35.91735.8760
(3.)SO2Micro Gram per Meter Cube9.565.019.5480
(4.)PM10Micro Gram per Meter Cube63.832.863.8100
(5.)OthersO3Micro Gram per Meter Cube14.67.514.57100
    14.2.     No. of Ground Water monitoring locations : 18
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.014.476.58.5
(2.)TDSmg/l18272175002000
(3.)TSSmg/l151000
(4.)Fluoridemg/l1.270.111.5
(5.)Heavy MetalsLeadmg/l000.010.01
(6.)Chloridesmg/l955352501000
(7.)Total Hardnessmg/l796140200600
    14.3.     No. of Surface Water monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.426.61C
(2.)BODmg/l3.82C
(3.)DOmg/l7.15.3C
(4.)CODmg/l2410.8C
    14.4.     No. of Ambient Noise monitoring locations : 18
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.446.775
(2.)Leq(Night)A-weighted decibels(dB(A))44.840.470
    14.5.     No. of Soil Sample Monitored locations : 18
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.066.85
(2.)N(Nitrogen)Kilogram per hectare740284
(3.)P(Phosphorus)Kilogram per hectare81.519.6
(4.)Electric ConductivityMillisiemens per Centimetre0.330.05
(5.)K(Potassium)Kilogram per hectare633251
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.28 To 22.58
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.06 To 16.52
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface26200016Copy of Permission LetterPipelineJack WellNA19 Nov 2019269000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Residential Waste water7650077000STPReuse within the Plant & Recycling76500
(2.)Industrial Waste water3360034000CETPReuse within the Plant & Recycling33600
(3.)Waste Water Cluster B6264062630STP/CETPReuse within the Plant & Recycling,Green Belt Renewal Plant62640
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 172740
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 172740
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Residential Waste- Cluster AOthersResidential Waste54346.31Tons45RoadSanitary Landfills
(2.)Residential Waste cluster BOthersResidential waste54296.64Tons40RoadSanitary Landfills
(3.)STP Sludge , Cluster AOthersSTP Sludge76.65Tons0Otherson siteOthersused as Manure for plantation
(4.)STP sludge Cluster BOthersSTP sludge75.6Tons0OthersOn siteOthersUsed as Manure for plantation
(5.)Industrial Waste Cluster BIndustrial Waste21289Tons40RoadSanitary Landfills
(6.)Commercial waste-Cluster AOthersCommercial Waste4738.43Tons45RoadSanitary Landfills
(7.)Commercial Waste Cluster BMunicipal Solid WasteCommercial Waste10432.08Tons40RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube35.500.083660
(2.)Others(Specify)COMicrogram per Meter Cube0.3100.961.822
(3.)PM10Microgram per Meter Cube63.800.0563.85100
(4.)NOxMicrogram per Meter Cube18.601.102080
(5.)SO2Microgram per Meter Cube9.5600.031080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Stack (42)Disel60.5NOx1.10
(2.)DG stackDiesel60.5OthersCO0.96
(3.)DG stackDiesel60.5PM100.054
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1252770
(b)Source GETCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) GIVEN IN EIA CHAPTER 4
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 10210
    Total Land (ha.) 10210
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrial ,commercial green belt etc 10210
    Total (ha.) 10210
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersResidential, Commercial, green belt etc10210Area is for Both Cluster A & B
Total (ha.) 10210
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NIL
(2.)WLSNA0NIL
(3.)ESAsNA0NIL
(4.)Wildlife CorridorsNA0NIL
(5.)CorridorsNA0NIL
(6.)NPANA0NIL
(7.)ESZsNA0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNIL0NIL
(2.)Archaeological SitesNIL0NIL
(3.)Defence InstallationsNIL0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 14000
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10210
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land acquisition is done based on the Town Plannin
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rampura Lake in Cluster B and Rupen River in Cluster A
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 124800
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 179000
(e)No. of working days 280
(f)Total Manpower 304500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3369
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 20000
(d)Funds Allocated for Plantation 0.85
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalDevelopment of Green belt
(2.)SocialBetterment of Quality of life
(3.)FinancialEmployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 102100000
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 0
5.
Energy Saving Measures:
(a)Source/Mode LED lights, solar lighting
(b)Percentage 10
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area 0
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
(1.)Automobile & Ancillary10000B
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Technolab India Private Limited
(iii)Address ABC Tower, #400, 13th Street , SIDCO Industrial Estate (North Phase) Ambattur -600098, Land Mark Near National Productivity Councial)
(iv)Mobile No. 8619246318
(v)Landline No. 0442625779
(vi)Email Id mumbai@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 25 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJai Prakash Prakash Shivahare
DesignationCEO
Name of Company (Applicant Name should not be given here)GUJARAT INDUSTRIAL CORRIDOR CORPORATION
Address6th Floor, Block 1-2, Udyog Bhavan, Sector 11, GH 4 Circle, Gandhinagar, Gujarat