(a)Name of the project(s) Setting up of 1.8 lakh tonnes per year non-recovery coke oven plant with10 MW cogen captive power plant and setting up of 2 lakh tonnes per year Ductile Iron Spun Pipe (DISP) at Blast furnace unit, KI
(b)Name of the Company / Organisation KIOCL LIMITED
(c)Registered Address II BLOCK, KORAMANGALA, BANGALORE 560034,,Bangalore Urban,Karnataka-560034
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kiran G V
(b)Designation (Owner/ Partner/ CEO) GM (Projects)
(c)Address KIOCL LIMITED, II BLOCK, KORAMANGALA,BANGALORE-560034,,Bangalore Urban,Karnataka-560034
(d)Pin code 560034
(e)E-mail anushree@meconlimited.co.in
(f)STD Code. 80(f)Telephone No. 25531461
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
4(b) Coke oven plants
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/IND/83835/2018
(d)Master Proposal Number(Single Window) SW/125951/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 456, 457
(b)Pincode 575010
(c)Bounded Latitudes (North)
From
Degree 12.56.19
Minutes
Second
From
Degree 12.56.29
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.49.44
Minutes
Second
From
Degree 74.49.46
Minutes
Second
(e)Survey of India Topo Sheet No. D43U13, D43016
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 20
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaDakshina KannadaMangalore
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/372/2018-IA-II(I)
(b)Date of Apply of TOR 29 Oct 2018
(c)Date of Issue of TOR / Standard ToR 21 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :1.4
St. Antony's church mini hall
State :Karnataka
District :Dakshina Kannada
Tehsil :Mangalore
Village :kulur
330Concern over environmental pollution, dust from nearby industries and job opportunities for localsDeputy Commissioner
(2.)
Date of Advertisement :17 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0.1
Plot No. 526, Kissam - UJJ, Mouza - Gobardhanpur, GP - Deojhar, PS - Joda
State :Orissa
District :Kendujhar
Tehsil :Barbil
Village :Gobardhanpur
440Employment to local people Education Medical facilities Drinking water supply Road & Infrastructure Air Pollution control and Env Management Sports Promotion Women empowerment and cultural promOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ductile Iron Spun Pipe Plant (DISP)0.2 MTPA
(2.)Non-recovery coke oven Plant0.18 MTPA
(3.)Captive Power Plant10 MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)0.20.2OthersMTPARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Apr 2017
(iv)Valid Upto 30 Jun 2021
(v)File No. AW-302446
(vi)Application No. AW-302446
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 836.9
(b) Funds Allocated for Environment Management (Capital) (in Crores) 40.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 560582
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 560582
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Hot Metal214800Tons per AnnumBlast furnaceOthersladle0 CaptiveCopy of Linkage
(2.)Sand5600Tons per AnnumIndigenousRoad0 Open MarketCopy of Linkage
(3.)FO9000Tons per AnnumIndigenousRoad0 Open MarketCopy of Linkage
(4.)LDO8000Tons per AnnumIndigenousRoad0 Open MarketCopy of Linkage
(5.)Coking coal264392Tons per AnnumNMPTOtherssea3 MoUCopy of Linkage
(6.)Cement15000Tons per AnnumIndigenousRoad0 Open MarketCopy of Linkage
(7.)Magnesium680Tons per AnnumIndigenousRoad0 Open MarketCopy of Linkage
(8.)Ferro Silicon1690Tons per AnnumIndigenousRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube784275100
(2.)SO2Micro Gram per Meter Cube9.54.18.0280
(3.)PM2.5Micro Gram per Meter Cube421837.1860
(4.)NOxMicro Gram per Meter Cube19.38.618.2380
(5.)OthersCOMicro Gram per Meter Cube252160246.72000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA7.46.56.58.5
(2.)TSSmg/l0000
(3.)Chloridesmg/l87192501000
(4.)TDSmg/l522725002000
(5.)Fluoridemg/l0.450.1911.5
(6.)Heavy MetalsTotal arsenicmg/l0.0300.010.01
(7.)Total Hardnessmg/l32024200600
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.346.7A
(2.)BODmg/l42C
(3.)OthersTotal coliformOthersMPN/100 ml920430C
(4.)DOmg/l6.55.2A
(5.)CODmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.939.275
(2.)Leq(Night)A-weighted decibels(dB(A))47.336.470
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.95.1
(2.)P(Phosphorus)Kilogram per hectare21.647.43
(3.)Electric ConductivityOthersNA68556
(4.)N(Nitrogen)Kilogram per hectare452201
(5.)K(Potassium)Kilogram per hectare313150
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.74 To 18.43
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 11.88
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Othersfrom KIOCL pellet plant63601.4Copy of Permission LetterPipelineOthersNAAW-30244612 Apr 20176360
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water4850STPGreen Belt Renewal Plant48
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 48
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 48
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Burnt sand coreOthersSand3360Tons0OthersNASanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube789.78.686.7100
(2.)PM2.5Microgram per Meter Cube0000.10
(3.)SO2Microgram per Meter Cube9.59.814.824.480
(4.)NOxMicrogram per Meter Cube19.39.913.132.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Annealing FurnaceLDO451.02PM100.56
(2.)COB-1Coke -oven601.16SO212.22
(3.)SpherodisationNA301.14PM100.69
(4.)Annealing FurnaceLDO451.02SO21.04
(5.)COB-1coke oven601.16PM100.76
(6.)COB-1coke oven601.16NOx7.64
(7.)COB-2coke oven601.16NOx7.64
(8.)BoilerFO300.53PM100.17
(9.)COB-2coke oven601.16PM100.76
(10.)COB-2coke oven601.16SO212.22
(11.)Annealing FurnaceLDO451.02NOx1.11
(12.)BoilerFO300.53NOx1.3
(13.)BoilerFO300.53SO21.17
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 16500
(b)Source Karnataka electricity board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 67.24
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 67.24
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 3081
(b)Waste/Barren Land (ha.) 7671
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 096
(e)Settlements (ha.) 7806
(f)Industrial (ha.) 1755
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 10179
(j)Others (ha.) : Quarry 23
    Total (ha.) 30611
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant31.16Blast furnace
(2.)OthersDISP and Coke oven8.19
(3.)Water Reservoir3.04
(4.)Green belt22.18
(5.)Built Up Area2.67roads
Total (ha.) 67.24
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area000
(2.)Corridors000
(3.)Wildlife Corridors000
(4.)ESAs000
(5.)ESZs000
(6.)WLS000
(7.)NPA000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest000
(2.)Defence InstallationsIndian Coast Guard3Panambur beach
(3.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired own land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made In consultation with District forest department. T
(iii)Period of Implementation Immediate effect on approval of conservation plan
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gurupur river, Arabian sea
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 511
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 511
32.
Green Belt in Ha:
(a)Total Area of Green Belt 22.19
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 33285
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. The proposed project is meant for producing DI pipes mainly used for water conveying and sanitation facilities for our nation as well as for exporting the same to the needy countries 2. 10 MW cogen power plant is planned to utilize waste heat from coke oven flue gas 3. Green belt development
(2.)Social1. Employment generation 2. Strengthening of ongoing CSR activities in the area of education, health and infrastructure
(3.)FinancialImproving GDP
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA00068
(ii)Name of the EIA Consultant MECON LIMITED
(iii)Address NO 89 MECON LIMITED, SOUTH END ROAD BASAVANGUDI
(iv)Mobile No. 9448396968
(v)Landline No. 0802625204
(vi)Email Id sveezhi@meconlimited.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 29 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKiran G V
DesignationGM (Projects)
Name of Company (Applicant Name should not be given here)KIOCL LIMITED
AddressII BLOCK, KORAMANGALA, BANGALORE 560034
Print