Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Greenfield Steel Plant by M/sPushp Steels and Mining Private Limited
(b)Name of the Company / Organisation PUSHP STEELS AND MINING PVT LTD
(c)Registered Address 751, Ground Floor, Kundewalan Street,,Ajmeri Gate, Delhi,Central,Delhi-10006
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Atul Jain
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 71, 2nd Floor,Arihant Nagar,Punjabi Bagh,,West,Delhi-110026
(d)Pin code 110026
(e)E-mail pushpsteels@gmail.com
(f)STD Code. 11(f)Telephone No. 98101520
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/IND/85734/2018
(d)Master Proposal Number(Single Window) SW/125471/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Borai Industrial Growth Centre
(b)Pincode 491001
(c)Bounded Latitudes (North)
From
Degree 211142.77
Minutes
Second
From
Degree 211143.8
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 811247.58
Minutes
Second
From
Degree 811258.58
Minutes
Second
(e)Survey of India Topo Sheet No. 64G/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 230
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of TOR NIL
(c)Date of Issue of TOR / Standard ToR NIL
(d)Previous TOR Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :1
Rasmara
State :Chhattisgarh
District :Durg
Tehsil :Durg
Village :Rasmara
35Employment to locals Pollution from one existing industryOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)DRI Plant350000 TPA
(2.)Press Machines120000 TPA
(3.)Captive Power Plant35 MW
(4.)Iron ore beneficiation cum Plant plant600000 TPA
(5.)Induction Furnace320000 TPA
(6.)Ferroalloy Plant52000 TPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ferroalloys52000Tons per AnnumRoad
(2.)Billets and autoparts320000Tons per AnnumRoad,Rail
(3.)Pellets600000Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 510
(b) Funds Allocated for Environment Management (Capital) (in Crores) 13
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1828000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1828000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ALL Raw materials1828000Tons per Annumopen marketRoad,Rail250 Open MarketCopy of Linkage
(2.)Coal516000Tons per Annumopen marketRoad,Rail250 e-auctionCopy of Linkage
(3.)Iron ore225000Tons per AnnumMines in CGRoad,Rail250 CaptiveCopy of Linkage
(4.)Iron ore225000Tons per AnnumMinesRoad,Rail250 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube9.84.09.680
(2.)PM10Micro Gram per Meter Cube764576100
(3.)PM2.5Micro Gram per Meter Cube54235060
(4.)NOxMicro Gram per Meter Cube15.49.01580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l14104505002000
(2.)Fluoridemg/l0.520.40.81.0
(3.)Chloridesmg/l39045250500
(4.)Heavy MetalsFe, Ni,Cr, As,Pb, Mnmg/l311010
(5.)pHNA8.37.26.58.5
(6.)Total Hardnessmg/l404140300500
(7.)TSSmg/l1051025
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.37.1C
(2.)DOmg/l4.94.7C
(3.)BODmg/l0.40.4C
(4.)CODmg/l88C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.351.175
(2.)Leq(Night)A-weighted decibels(dB(A))61.643.170
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare132128
(2.)Electric ConductivityMillisiemens per Centimetre0.700.55
(3.)P(Phosphorus)Kilogram per hectare2725
(4.)pH1.451.32
(5.)N(Nitrogen)Kilogram per hectare155150
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 6
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface50004Copy of Permission LetterPipelineOthersSupplied by CSIDC666507 Sep 20115000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cooling tower blowdown285285Settling tankReuse within the Plant & Recycling285
(2.)Domestic wastewater4040ETPGreen Belt Renewal Plant40
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 325
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 325
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dust from Bag FiltersIndustrial Waste10100Tons0RoadOthersUsed for construction purpose
(2.)Flyash and Bottom ashFly Ash114000Tons0RoadOthersUtilised asper MOEF&CC Rules 2018
(3.)Iron ore tailingsIndustrial Waste60000Tons0RoadOthersUsed for civil construction purpose
(4.)DRI Plant dustIndustrial Waste90000Tons0RoadOthersUsed for construction purpose
(5.)SlagIndustrial Waste71200Tons0RoadOthersGiven for metal recovery
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube101.53.51480
(2.)PM10Microgram per Meter Cube681.56.775100
(3.)NOxMicrogram per Meter Cube16.01.53.92080
(4.)PM2.5Microgram per Meter Cube461.53.45060
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Induction Furnace2Electricity300.8PM100.5
(2.)SAFElectricity301PM100.9
(3.)CPPCoal and Char302PM101.4
(4.)DRI Kiln 200 TPDCoal401PM100.2
(5.)DRI Kiln 350 TPDCoal501PM100.7
(6.)DRI Kiln 500 TPDCoal601.2PM101.2
(7.)Induction FurnacesElectricity301PM100.6
(8.)Pellet PlantCoal401PM100.3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 44
(b)Source CPP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 11.42
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 11.42
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 11.42
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrialland 0
    Total (ha.) 11.42
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant5.5
(2.)Township0
(3.)Green belt3.7
(4.)Ash Pond0
(5.)Quarry Area0
(6.)OB Dump Area0
(7.)Safety Zone0
(8.)Tailing Pond0.25
(9.)LandFill0
(10.)Water Reservoir0.5
(11.)Desalination Plant0
(12.)Area for Solid Waste Management0.2
(13.)Built Up Area0.5
(14.)OthersParking, roads, etc0.5
Total (ha.) 11.15
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None
(2.)ESAsNone0None
(3.)ESZsNone0None
(4.)WLSNone0None
(5.)NPANone0None
(6.)CorridorsNone0None
(7.)Wildlife CorridorsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestJoratari RF4Small patch of open forest, acacia sp
(2.)Defence InstallationsNone0None
(3.)Archaeological SitesNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.42
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 480
(c)Temporary Employment- During Construction 80
(d)Temporary Employment- During Operation 420
(e)No. of working days 2100
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.7
(b)Percentage of Total Project Area 32.40
(c)No. of Plants to be Planted 9000
(d)Funds Allocated for Plantation 900000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalUse of iron ore fines for making pellets
(2.)SocialRs.510 lakhs will be spent for ECR
(3.)FinancialRs.510 crores will be spent for this project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 81
(ii)Name of the EIA Consultant Grass Root Research and Creation India Pvt Ltd
(iii)Address F395 Sector 63 Noida
(iv)Mobile No. 9810032481
(v)Landline No. 21211228
(vi)Email Id emtrcjkm@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 04 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAi. Hazard Identification and Risk Assessment (HIRA) shall be carried out and report shall be furnished. ii. Authenticated English translation of the PH proceedings shall be furnished. iii. Social impact assessment study details have not been furnished. 18 Nov 2019
2.NAThe correction have been made as per the instruction received 18 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAtul Jain
DesignationDirector
Name of Company (Applicant Name should not be given here)PUSHP STEELS AND MINING PVT LTD
Address751, Ground Floor, Kundewalan Street,