Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Deep Water Jetty Facility and Capacity/ expansion at existing Inland Water Jetty Facility on Kundalika River, Village Korlai, District Raigarh, Maharashtra
(b)Name of the Company / Organisation INDO ENERGY INTERNATIONAL LTD
(c)Registered Address 609-610, Vindhya Commercial Complex, Sector 11, CBD, Belapur, Navi Mumbai.,,Raigad,Maharashtra-400614
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Captain RK Karnal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 609-610, Vindhya Commercial Complex, Sector 11, CBD, Belapur, Navi Mumbai.,,Panvel,Raigad,Maharashtra-400614
(d)Pin code 400614
(e)E-mail indoenergy2015@gmail.com
(f)STD Code. 91(f)Telephone No. 27580578
(g)Fax No. 9127580577
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/MIS/73858/2015
(d)Master Proposal Number(Single Window) SW/125282/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Reclaimed Port backup from capital dredging of the
(b)Pincode 402202
(c)Bounded Latitudes (North)
From
Degree 18.31
Minutes
Second
From
Degree 18.32
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.54
Minutes
Second
From
Degree 72.55
Minutes
Second
(e)Survey of India Topo Sheet No. 47B/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshChhindwaraSausarKhapakarimwar
(2.)MaharashtraRaigadMurud
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-34/2015-IA.III
(c)Date of Apply of TOR 01 Dec 2015
(d)Date of Issue of TOR / Standard ToR 28 Jan 2016
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Oct 2016
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Nov 2016
Distance of Public Hearing Venue from the Proposed Project :0.9
Mount Carmel Highschool, Korlai
State :Maharashtra
District :Raigad
Tehsil :Roha
Village :Korlai
47Major issues raised by the villagers were that due to proposed project Kundalika River will get polluted thus disrupting livelihood of local families that depend solely on fishing. Phansad reserve forDistrict Magistrate
(2.)
Date of Advertisement :17 Oct 2016
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Nov 2016
Distance of Public Hearing Venue from the Proposed Project :0.8
Near Existing Sanegaon Project Site
State :Maharashtra
District :Raigad
Tehsil :Roha
Village :Sanegaon
52Major issues raised by the villagers were that due to dust emission from existing project local students have to take admission in Roha School which is as at far distance. Coal Powder emissions are deDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)50 ha port backupmechanised multi cargo handling
(2.)- 3.1 m CD dredgingkorlai to sanegaon jetty in the kundalike river
(3.)225 m, 19 m deep, 21.5 km long channel35.5 MMT capita dredgingl
(4.)525 m jettybored, cast in situ piles
(5.)50 ha port backup7.5 m top level
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)solid and liquid cargo23.5Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2375
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 11.8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 80
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 80
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD80Kilo Litre per DayDomestic supplyRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2015 To 29 Feb 2016
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube19.513.419.11NAAQS 2009
(2.)SO2Micro Gram per Meter Cube9.86.59.6NAAQS 2009
(3.)PM10Micro Gram per Meter Cube54.140.653.0NAAQS 2009
(4.)NOxMicro Gram per Meter Cube19.312.718.9NAAQS 2009
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.27.478.5
(2.)TDSmg/l8346275002000
(3.)OthersCalciummg/l39111275200
(4.)OthersSuphatemg/l194136200400
(5.)TSSmg/l11355500500
(6.)Total Hardnessmg/l186129200600
(7.)Fluoridemg/l0.30.31.01.5
(8.)Chloridesmg/l3912382501000
(9.)OthersNitratemg/l1174545
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.817.31A
(2.)BODmg/l1710D
(3.)CODmg/l104440E
(4.)DOmg/l6.45.4B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.345.6CPCB stabndard
(2.)Leq(Night)A-weighted decibels(dB(A))41.937.7CPCB standard
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Percent0.20.17
(2.)K(Potassium)Milligram per Kilogram10661.8
(3.)Electric ConductivityMillisiemens per Centimetre3.342.04
(4.)pH7.47.22
(5.)N(Nitrogen)Percent0.010.01
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.95 To 7.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.1 To 5.05
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC/Irrigation Department650120Copy of Permission LetterPipelineOthersPiped supply015 Dec 2016650
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic3030Biological treatmentGreen Belt Renewal Plant30
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 30
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 30
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic and canteen wasteMunicipal Solid Waste90Tons30RoadAuthorized Recyclers
(2.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Kilolitre150RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube14.6000.115.7NAAQS 2009
(2.)SO2Microgram per Meter Cube6.8800.17.98NAAQS 2009
(3.)PM10Microgram per Meter Cube42.7800.143.88NAAQS 2009
(4.)NOxMicrogram per Meter Cube13.4800.114.58NAAQS 2009
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)GD stackHSD140.15PM10100 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 21000
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 750 kVA
(e)Stack Height (in m) 14
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.739
(b)Private Land (ha.) 0.738
(c)Government Land (ha.) 0.738
(d)Revenue Land (ha.) 0.737
(e)Other Land (ha.) 0.737
    Total Land (ha.) 3.689
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.4
(b)Waste/Barren Land (ha.) 0.4
(c)Grazing/ Community Land (ha.) 0.4
(d)Surface Water Bodies (ha.) 0.4
(e)Settlements (ha.) 0.4
(f)Industrial (ha.) 0.41
(g)Forest (ha.) 0.4
(h)Mangroves (ha.) 0.4
(i)Marine Area (ha.) 0.4
(j)Others (ha.) : Other land 0.1
    Total (ha.) 3.71
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt12.5Port backup on 50 ha reclaimed land beyond HTL
Total (ha.) 12.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSPhansad Wildlife Sanctuary4.4Ecosensitive zone notified around the sanctuary, project is out of the ESZ
(2.)Critically Polluted Areanone0none
(3.)NPAnone0none
(4.)ESZsnone0none
(5.)ESAsnone0none
(6.)Corridorsnone0none
(7.)Wildlife Corridorsnone0none
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnone0none
(2.)ForestReserve forest2.2south est of the Project site (foothills)
(3.)Archaeological SitesKorlai fort1.2Ruins of Korlai fort on the hill ridge, not a high footfall location
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Port back of 50 ha will be created by reclamation
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 3600
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Arabian sea and estuary of Kundalike river
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kundalika river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 210
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 200
(e)No. of working days 365
(f)Total Manpower 410
32.
Green Belt in Ha:
(a)Total Area of Green Belt 12.5
(b)Percentage of Total Project Area 338.85
(c)No. of Plants to be Planted 18750
(d)Funds Allocated for Plantation 2.01
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment to 410 skilled/ semiskilled manpower from the local employment catchment, secondary and tertiary employment, and trickle down social benefit due to increase in ecoomic activity in the area.
(2.)EnvironmentalCreation of environmentally compatible port and harbour development to facilitate water transportation (both exim cargo and coastal transport) of bulk cargo (coal, iron ore and others), which will aid in decongestion of road infrastructure, and is environmentally meritorious mode of transport; additional creation of new vegetation and ecological infrastructure.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 5
(d)Total plot area (sqm) 500000
(e)Total built up area (sqm) 8000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Bulk, break bulk and liquid
(d)Quantity of Cargo 23.5
(e)Control Measures of Cargo comprehensive dust suppression system
(f)Dust Control Measures water sprinkling, dry fogging, geo-textile coverin
(g)Quantum 1
(h)Quantity of Dredging (Cubic meter per day) 35.5
(i)Type of Dredging Capital
(j)Disposal of Dredge Material deep sea
(k)Details of Outfall Diffusers 0
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall Once pre-monsoon and post-monsoon
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 20000
(c)No. of Recharge Pits 32
(d)Capacity 8000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1.025
5.
Energy Saving Measures:
(a)Source/Mode Solar PVs
(b)Percentage 0.1
(c)Quantity 106
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area As the Port backup will be created by reclamation,
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720 RA 051
(ii)Name of the EIA Consultant Eco Chem Sales and Services
(iii)Address Office Floor, Ashoka Pavillion -A, Opp. Kapadia Health Club, New Civil Road, Surat, Gujarat 395001
(iv)Mobile No. 9824084678
(v)Landline No. 0261223622
(vi)Email Id shripad@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 03 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSubmission of compliance for recommendation provided in 262nd EAC meeting held on 25th & 27th May, 2021. 03 Jul 2021
2.NA

The EAC, taking into account the submission made by the project proponent had a detailed deliberation during its 262nd meeting on 25th & 27th May, 2021 and deferred the proposal with following comments:

          i.         A detailed map of proposed reclamation area with the proposed landuse of the reclamation land should be submitted.

        ii.         Issues raised and commitments made during the Public Hearing has to be fulfilled and should be included in the EIA/EMP report in the form of tabular chart with financial budget for complying with the commitments made.

      iii.         Impact of storage of coal in reclaimed land and its transport and runoff require detailed assessment. Proponent are also advised to explore storage areas beyond CRZ

08 Jun 2021
3. ADS Reply LetterDear Sir/Madam, With reference to ADS, we hereby attach and submit compliance to the minutes of 49th meeting of EAC (Infra-2). 10 May 2021
4.NA

Kindly see the minutes of 49th meeting of EAC (Infra-2)

05 Mar 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantCaptain RK Karnal
DesignationDirector
Name of Company (Applicant Name should not be given here)INDO ENERGY INTERNATIONAL LTD
Address609-610, Vindhya Commercial Complex, Sector 11, CBD, Belapur, Navi Mumbai.
Print