1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development of Deep Water Jetty Facility and Capacity/ expansion at existing Inland Water Jetty Facility on Kundalika River, Village Korlai, District Raigarh, Maharashtra | (b)Name of the Company / Organisation | INDO ENERGY INTERNATIONAL LTD | (c)Registered Address | 609-610, Vindhya Commercial Complex, Sector 11, CBD, Belapur, Navi Mumbai.,,Raigad,Maharashtra-400614 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Captain RK Karnal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | 609-610, Vindhya Commercial Complex, Sector 11, CBD, Belapur, Navi Mumbai.,,Panvel,Raigad,Maharashtra-400614 | (d)Pin code | 400614 | (e)E-mail | indoenergy2015@gmail.com | (f)STD Code. | 91(f)Telephone No. | 27580578 | (g)Fax No. | 9127580577 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/MIS/73858/2015 | (d)Master Proposal Number(Single Window) | SW/125282/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Reclaimed Port backup from capital dredging of the | (b)Pincode | 402202 | (c)Bounded Latitudes (North) | | From | | Degree | 18.31 | Minutes | | Second | | From | | Degree | 18.32 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.54 | Minutes | | Second | | From | | Degree | 72.55 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47B/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Chhindwara | Sausar | Khapakarimwar | (2.) | Maharashtra | Raigad | Murud | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-34/2015-IA.III | (c)Date of Apply of TOR | 01 Dec 2015 | (d)Date of Issue of TOR / Standard ToR | 28 Jan 2016 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 19 Nov 2016 | Distance of Public Hearing Venue from the Proposed Project : | 0.9 |
| Mount Carmel Highschool, Korlai | State : | Maharashtra | District : | Raigad | Tehsil : | Roha | Village : | Korlai |
| 47 | Major issues raised by the villagers were that due to proposed project Kundalika River will get polluted thus disrupting livelihood of local families that depend solely on fishing. Phansad reserve for | District Magistrate | | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 21 Nov 2016 | Distance of Public Hearing Venue from the Proposed Project : | 0.8 |
| Near Existing Sanegaon Project Site | State : | Maharashtra | District : | Raigad | Tehsil : | Roha | Village : | Sanegaon |
| 52 | Major issues raised by the villagers were that due to dust emission from existing project local students have to take admission in Roha School which is as at far distance. Coal Powder emissions are de | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 50 ha port backup | mechanised multi cargo handling | | (2.) | - 3.1 m CD dredging | korlai to sanegaon jetty in the kundalike river | | (3.) | 225 m, 19 m deep, 21.5 km long channel | 35.5 MMT capita dredgingl | | (4.) | 525 m jetty | bored, cast in situ piles | | (5.) | 50 ha port backup | 7.5 m top level | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | solid and liquid cargo | 23.5 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2375 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 11.8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.35 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 80 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 80 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 80 | Kilo Litre per Day | | Domestic supply | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2015 To 29 Feb 2016 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 19.5 | 13.4 | 19.11 | NAAQS 2009 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.8 | 6.5 | 9.6 | NAAQS 2009 | (3.) | PM10 | | Micro Gram per Meter Cube | 54.1 | 40.6 | 53.0 | NAAQS 2009 | (4.) | NOx | | Micro Gram per Meter Cube | 19.3 | 12.7 | 18.9 | NAAQS 2009 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.2 | 7.4 | 7 | 8.5 | (2.) | TDS | | | mg/l | | 834 | 627 | 500 | 2000 | (3.) | Others | Calcium | | mg/l | | 391 | 112 | 75 | 200 | (4.) | Others | Suphate | | mg/l | | 194 | 136 | 200 | 400 | (5.) | TSS | | | mg/l | | 113 | 55 | 500 | 500 | (6.) | Total Hardness | | | mg/l | | 186 | 129 | 200 | 600 | (7.) | Fluoride | | | mg/l | | 0.3 | 0.3 | 1.0 | 1.5 | (8.) | Chlorides | | | mg/l | | 391 | 238 | 250 | 1000 | (9.) | Others | Nitrate | | mg/l | | 11 | 7 | 45 | 45 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.81 | 7.31 | A | (2.) | BOD | | mg/l | | 17 | 10 | D | (3.) | COD | | mg/l | | 1044 | 40 | E | (4.) | DO | | mg/l | | 6.4 | 5.4 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 51.3 | 45.6 | CPCB stabndard | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.9 | 37.7 | CPCB standard | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Percent | | 0.2 | 0.17 | (2.) | K(Potassium) | Milligram per Kilogram | | 106 | 61.8 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 3.34 | 2.04 | (4.) | pH | | | 7.4 | 7.22 | (5.) | N(Nitrogen) | Percent | | 0.01 | 0.01 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.95 To 7.7 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.1 To 5.05 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC/Irrigation Department | 650 | 120 | Copy of Permission Letter | Pipeline | | Others | Piped supply | 0 | 15 Dec 2016 | 650 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 30 | 30 | Biological treatment | Green Belt Renewal Plant | | 30 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 30 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 30 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Domestic and canteen waste | Municipal Solid Waste | | 90 | Tons | 30 | Road | | Authorized Recyclers | | (2.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Kilolitre | 150 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 14.60 | 0 | 0.1 | 15.7 | NAAQS 2009 | (2.) | SO2 | | Microgram per Meter Cube | 6.88 | 0 | 0.1 | 7.98 | NAAQS 2009 | (3.) | PM10 | | Microgram per Meter Cube | 42.78 | 0 | 0.1 | 43.88 | NAAQS 2009 | (4.) | NOx | | Microgram per Meter Cube | 13.48 | 0 | 0.1 | 14.58 | NAAQS 2009 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | GD stack | HSD | 14 | 0.15 | PM10 | | 100 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 21000 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 750 kVA | (e)Stack Height (in m) | 14 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.739 | (b)Private Land (ha.) | 0.738 | (c)Government Land (ha.) | 0.738 | (d)Revenue Land (ha.) | 0.737 | (e)Other Land (ha.) | 0.737 | Total Land (ha.) | 3.689 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.4 | (b)Waste/Barren Land (ha.) | 0.4 | (c)Grazing/ Community Land (ha.) | 0.4 | (d)Surface Water Bodies (ha.) | 0.4 | (e)Settlements (ha.) | 0.4 | (f)Industrial (ha.) | 0.41 | (g)Forest (ha.) | 0.4 | (h)Mangroves (ha.) | 0.4 | (i)Marine Area (ha.) | 0.4 | (j)Others (ha.) : Other land | 0.1 | Total (ha.) | 3.71 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 12.5 | Port backup on 50 ha reclaimed land beyond HTL | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Phansad Wildlife Sanctuary | 4.4 | Ecosensitive zone notified around the sanctuary, project is out of the ESZ | (2.) | Critically Polluted Area | none | 0 | none | (3.) | NPA | none | 0 | none | (4.) | ESZs | none | 0 | none | (5.) | ESAs | none | 0 | none | (6.) | Corridors | none | 0 | none | (7.) | Wildlife Corridors | none | 0 | none | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | none | 0 | none | (2.) | Forest | | Reserve forest | 2.2 | south est of the Project site (foothills) | (3.) | Archaeological Sites | | Korlai fort | 1.2 | Ruins of Korlai fort on the hill ridge, not a high footfall location | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Port back of 50 ha will be created by reclamation | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 3600 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Arabian sea and estuary of Kundalike river | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kundalika river | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 210 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 200 | (e)No. of working days | 365 | (f)Total Manpower | 410 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 12.5 | (b)Percentage of Total Project Area | 338.85 | (c)No. of Plants to be Planted | 18750 | (d)Funds Allocated for Plantation | 2.01 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment to 410 skilled/ semiskilled manpower from the local employment catchment, secondary and tertiary employment, and trickle down social benefit due to increase in ecoomic activity in the area. | (2.) | Environmental | Creation of environmentally compatible port and harbour development to facilitate water transportation (both exim cargo and coastal transport) of bulk cargo (coal, iron ore and others), which will aid in decongestion of road infrastructure, and is environmentally meritorious mode of transport; additional creation of new vegetation and ecological infrastructure. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 10 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 5 | (d)Total plot area (sqm) | 500000 | (e)Total built up area (sqm) | 8000 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | (b)Upload Shoreline Study | Copy of Shoreline stuudy | (c)Type of Cargo | Bulk, break bulk and liquid | (d)Quantity of Cargo | 23.5 | (e)Control Measures of Cargo | comprehensive dust suppression system | (f)Dust Control Measures | water sprinkling, dry fogging, geo-textile coverin | (g)Quantum | 1 | (h)Quantity of Dredging (Cubic meter per day) | 35.5 | (i)Type of Dredging | Capital | (j)Disposal of Dredge Material | deep sea | (k)Details of Outfall Diffusers | 0 | (l)No. of Dilution Expected | 0 | (m)Distance at which the Outlet will Reach Ambient Parameters | 0 | (n)Details of Monitoring at Outfall | Once pre-monsoon and post-monsoon | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 2 | (b)Capacity | 20000 | (c)No. of Recharge Pits | 32 | (d)Capacity | 8000 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 1.025 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar PVs | (b)Percentage | 0.1 | (c)Quantity | 106 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720 RA 051 | (ii)Name of the EIA Consultant | Eco Chem Sales and Services | (iii)Address | Office Floor, Ashoka Pavillion -A, Opp. Kapadia Health Club, New Civil Road, Surat, Gujarat 395001 | (iv)Mobile No. | 9824084678 | (v)Landline No. | 0261223622 | (vi)Email Id | shripad@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 03 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Submission of compliance for recommendation provided in 262nd EAC meeting held on 25th & 27th May, 2021. | 03 Jul 2021 | 2. | NA | The EAC, taking into account the submission made by the project proponent had a detailed deliberation during its 262nd meeting on 25th & 27th May, 2021 and deferred the proposal with following comments:
i. A detailed map of proposed reclamation area with the proposed landuse of the reclamation land should be submitted.
ii. Issues raised and commitments made during the Public Hearing has to be fulfilled and should be included in the EIA/EMP report in the form of tabular chart with financial budget for complying with the commitments made.
iii. Impact of storage of coal in reclaimed land and its transport and runoff require detailed assessment. Proponent are also advised to explore storage areas beyond CRZ | 08 Jun 2021 | 3. | ADS Reply Letter | Dear Sir/Madam,
With reference to ADS, we hereby attach and submit compliance to the minutes of 49th meeting of EAC (Infra-2). | 10 May 2021 | 4. | NA | Kindly see the minutes of 49th meeting of EAC (Infra-2)
| 05 Mar 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Captain RK Karnal | Designation | Director | Name of Company (Applicant Name should not be given here) | INDO ENERGY INTERNATIONAL LTD | Address | 609-610, Vindhya Commercial Complex, Sector 11, CBD, Belapur, Navi Mumbai. |
|