1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Enhancement of Zinc Production Capacity (from 4,20,000 TPA to 5,04,000 TPA) of both Hydro Plants – I & II under 7 (ii) clause of EIA notification, 2006 (20% one time capacity expansion). | (b)Name of the Company / Organisation | HINDUSTAN ZINC LIMITED | (c)Registered Address | Hindustan Zinc Limited,
Chanderiya Lead Zinc Smelter,
P.O: Putholi,
Chittorgarh district,,chittorgarh,Rajasthan-312021 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Tarun Meghwal | (b)Designation (Owner/ Partner/ CEO) | HeadEnvironment | (c)Address | Hindustan Zinc Limited Chanderiya Lead Zinc Smelter, P.O Putholi, Chittorgarh district, Rajasthan,,Gangrar,chittorgarh,Rajasthan-312021 | (d)Pin code | 312021 | (e)E-mail | tarun.meghwal@vedanta.co.in | (f)STD Code. | 1472(f)Telephone No. | 254411 | (g)Fax No. | 253016 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/IND/124999/2019 | (d)Master Proposal Number(Single Window) | SW/124998/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Within in the exiting CLZS complex | (b)Pincode | 312021 | (c)Bounded Latitudes (North) | | From | | Degree | 24.5722 | Minutes | | Second | | From | | Degree | 24.5758 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74.3906 | Minutes | | Second | | From | | Degree | 74.4009 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | G43O12,G43O16, G43U9, G43U19 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 396 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | IV/ENV/R/IND-29/285/2004/285-371/391 15.11.19 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 9 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Hydro Smelter I & II | 420000 | 84000 | 504000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Hydro Smelter I & II | 420000 | 84000 | 504000 | TPA | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 03 Aug 2016 | (iv)Valid Upto | 31 Jan 2019 | (v)File No. | F(CPM/)/Chittorgarh/2(1)/2016-2017/5434-54364565 | (vi)Application No. | 224737 dated 18.09.2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 138.5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 48.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.3 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 4.6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 21282 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 21282 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Zinc concentrate | 21282 | Tons per Annum | | Captive Mines | Road,Rail | | 100 | Captive | | Copy of Linkage | (2.) | Zinc Oxide | 131990 | Tons per Annum | | Other Smelters | Road | | 80 | Captive | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 8 To 8 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 0 | 22 | Not Appliacble | Pipeline | | Others | Captive Dam | CEWR/TA(W)/F-23/HZL/986 | 20 May 2009 | 62000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage Effluent | 147.6 | 1000 | STP | Green Belt Renewal Plant | | 147.6 | | (2.) | Trade Effluent | 5648 | 8200 | ETP,RO,MEE | Reuse within the Plant & Recycling | | 5648 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 5795.6 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 5795.6 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Jarosite Cake | Industrial Waste | | 200000 | Tons | 3 | Road | | Others | Jarofix Yard | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 57 | 0 | 0.5 | 58 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 95 | 0 | 1 | 97 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 22.1 | 0 | 0.2 | 23 | 80 | (4.) | NOx | | Microgram per Meter Cube | 31.7 | 0 | 0.2 | 33 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Roaster | nil | 100 | 2 | SO2 | | 21.20 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20000 | (b)Source | Captive/AVVNL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 4.59 | (e)Stack Height (in m) | 35 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 335.89 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 335.89 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 335.89 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NO | 0 | Total (ha.) | 335.89 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | no additional land required | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | No | 0 | no ESZs in 10km radius | (2.) | Critically Polluted Area | No | 0 | nil in 10km radius | (3.) | WLS | No | 0 | nil in 10km radius | (4.) | NPA | No | 0 | nil in 10km radius | (5.) | ESAs | No | 0 | nil in 10km radius | (6.) | Wildlife Corridors | No | 0 | nil in 10km radius | (7.) | Corridors | No | 0 | nil in 10km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Shikargarh Salera RF | 1.7 | Reserve forest | (2.) | Defence Installations | | no | 0 | no within 10 km | (3.) | Archaeological Sites | | Chittorgarh Fort | 6.5 | from plant boundary | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 335.89 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Seassonal Berach River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 0 | (f)Total Manpower | 0 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 121.77 | 0 | 121.77 | (2.) | Percentage of Total Project Area | 36.25 | 0 | 36.25 | (3.) | No. of Plants | 140000 | 0 | 140000 | (4.) | Funds Allocated | 10 | 2 | 12 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | enhancement of zinc production capacity from 4,20,000 TPA to 5,04,000 TPA (20%) in its Zinc Smelter I & II on combined basis by improving the current efficiency in cell house from 89% to 93%, increasing current input in cell house from 190 kA to 200 kA, Debottlenecking and increasing the number of cells from 124 to 132 in Hydro-I cell house. No additional water, land etc required for this expansion project. | (2.) | Social | Creation of indirect employment for local community | (3.) | Financial | Additional exchequer to Government of Rajasthan and promoting Make in India for reducing Zinc import | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA/088 | (ii)Name of the EIA Consultant | VIMTA LABS LTD | (iii)Address | 142, IDA, CHERLAPALLY, HYDERABAD | (iv)Mobile No. | 9000711309 | (v)Landline No. | 0402726414 | (vi)Email Id | janardhan@vimta.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 19 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The proposal is returned in the present form due to the following shortcomings:
1. Certified EC compliance report may be appended to the Form -2
2. Recent CTO renewal shall be uploaded
3. Wastewater management details related to its generation shall be furnished.
4. Other criteria pollutants shall be furnished
5. Risk Assessment shall be carried out for qualitative and quantitative risk for entire plant. Emergency preparedness plan shall be prepared accordingly.
6. Air quality modeling shall be conducted for all the emissions including acid mist, SO2, SO3 etc. in the proposed activity scenario. Compare and contrast by analysis with post project monitoring data.
7. Sulphur balance for entire plant shall be furnished. | 19 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 10 Dec 2019 | 3. | NA | The application in prescribed Form -2 has been examined. Please ensure the following for consideration the application.
1. A revised greenbelt plant to the scale with legend may be uploaded. All the plant facilities may be shown in block diagram and environmental facilities/measures may be highlighted.
2. Complete Certified compliance report to the earlier EC may be uploaded.
3. The final layout for hydro unit where the additional cells are proposed may be shown in enlarged layout with scale. Photographs of the space available for the same (retrofitting) may be appreciated. | 11 Dec 2019 | 4. | NA | The correction have been made as per the instruction received | 12 Dec 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Sir,
With reference to the aforesaid subject, we hereby submit that all Additional documents sought by MoEF&CC in 14th EAC (Industry 1) Minutes of Meeting dated 10.01.2020 for Agenda No 14.16 dated 24th Dec 2019 under Point ‘1’ to ‘2’ along with Pollution load assessment for pre and post-expansion are enclosed as Appendix A.
In view of the above, we humbly request you to please accept our proposal in the upcoming EAC meeting for grant of Environment Clearance for one-time capacity expansion from 4,20,000 TPA to 5,04,000 TPA (20%) in our Zinc Smelter I & II on combined basis considering that there will be no any additional significant environment impact arising out of this expansion under the clause 7(ii) (a) of EIA notification, 2006.
Thanking you,
Yours faithfully,
(C Chandru)
Unit Head
Zinc Smelter (Hydro I & Hydro II)
Chanderiya Lead Zinc Smelter
Encl: a/a | 15 Jun 2020 | 2. | NA | Kindly submit the Certified compliance report of Regional Office for the existing ECs and CTO renewal obtained from the Rajasthan Pollution Control Board. | 23 Apr 2020 | 3. | ADS Reply Letter | Sir,
With reference to the aforesaid subject, we hereby submit that all Additional documents sought by MoEF&CC in 14th EAC (Industry 1) Minutes of Meeting dated 10.01.2020 for Agenda No 14.16 dated 24th Dec 2019 under Point ‘1’ to ‘2’ are enclosed as Appendix A.
In view of the above, we humbly request you to please accept our proposal in the upcoming EAC meeting for grant of Environment Clearance for one-time capacity expansion from 4,20,000 TPA to 5,04,000 TPA (20%) in our Zinc Smelter I & II on combined basis considering that there will be no any additional significant environment impact arising out of this expansion under the clause 7(ii) (a) of EIA notification, 2006.
Thanking you,
Yours faithfully,
(C Chandru)
Unit Head
Zinc Smelter (Hydro I & Hydro II)
Chanderiya Lead Zinc Smelter
Encl: a/a | 07 Mar 2020 | 4. | NA | Proposal deferred for want of additional information.
| 10 Jan 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Tarun Meghwal | Designation | HeadEnvironment | Name of Company (Applicant Name should not be given here) | HINDUSTAN ZINC LIMITED | Address | Hindustan Zinc Limited,
Chanderiya Lead Zinc Smelter,
P.O: Putholi,
Chittorgarh district |
|