1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Pellet Plant from 2.2 to 2.5 MTPA within existing 1.75 MTPA Integrated Steel Plant at Village & Post Naharpali, Tehsil Kharsia, District Raigarh, Chhattisgarh by Monnet Ispat & Energy Lim | (b)Name of the Company / Organisation | JSW ISPAT SPECIAL | (c)Registered Address | Village - Naharpali, Tahsil Kharsia, District - RAIGARH, CHHATTISGARH,,Raigarh,Haryana-496661 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | RAJKUMAR PATEL | (b)Designation (Owner/ Partner/ CEO) | Factorymanager | (c)Address | Village - Naharpali, Tahsil Kharsia, District - RAIGARH, CHHATTISGARH,,,Raigarh,Chhattisgarh-496661 | (d)Pin code | 496661 | (e)E-mail | env.naharpali@aionjsw.in | (f)STD Code. | 7762(f)Telephone No. | 251105 | (g)Fax No. | 275505 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/124835/2019 | (d)Master Proposal Number(Single Window) | SW/124834/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Details Attached with Form 1 | (b)Pincode | 496661 | (c)Bounded Latitudes (North) | | From | | Degree | 21.97511389 | Minutes | | Second | | From | | Degree | 21.99385278 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 83.22444444 | Minutes | | Second | | From | | Degree | 83.25305556 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64O1, 64O5, 64N4, 64N8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 243 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-538/RON/2017-NGP/5680 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 23 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Billets | 1.74 | 0 | 1.74 | Others | MTPA | Road,Rail,Others | Magnetic Crane | (2.) | Washed Coal | 1 | 0 | 1 | Others | MTPA | Road,Conveyor Belt | | (3.) | Power | 170 | 0 | 170 | Mega Watt(MW) | | Others | Cables | (4.) | Pig Iron | 0.70 | 0 | 0.7 | Others | MTPA | Conveyor Belt | | (5.) | TMT/ Alloyed Steel/ Plates | 1.20 | 0 | 1.2 | Others | MTPA | Road,Rail,Others | Magnetic Crane | (6.) | Power through DG Sets | 3000 | 0 | 3000 | Others | KVA | Others | Cables | (7.) | Pellets | 2.2 | 0.3 | 2.5 | Others | MTPA | Road,Rail,Conveyor Belt | | (8.) | Liquid Oxygen | 400 | 0 | 400 | Others | TPD | Pipe Conveyor | | (9.) | Sponge Iron | 0.5 | 0 | 0.5 | Others | MTPA | Road,Rail,Conveyor Belt | | (10.) | Sinter | 0.75 | 0 | 0.75 | Others | MTPA | Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Palletisation Plant | 2.2 MTPA | 0.3 MTPA | 2.5 MTPA | Expansion through process optimization and increase in number of annual working days | (2.) | Blast Furnace | 0.70 MTPA | 0 | 0.70 MTPA | No Change | (3.) | Sponge Iron Unit (DRI) | 0.50 MTPA (2x350 TPD + 2x100 TPD + 2x350 TPD) | 0 | 0.50 MTPA (2x350 TPD + 2x100 TPD + 2x350 TPD) | No Change | (4.) | Rolling Mill & Plate Mill | 1.20 MTPA (0.45 Rolling Mill + 0.75 Plate Mill) | 0 | 1.20 MTPA (0.45 Rolling Mill + 0.75 Plate Mill) | No Change | (5.) | Oxygen Plant | 400 TPD (0.132 MTPA) | 0 | 400 TPD (0.132 MTPA) | No change | (6.) | DG Set | 2 x1500 KVA (1x3.8 MVA & 3 x1500 KVA) | 0 | 2 x1500 KVA (1x3.8 MVA & 3 x1500 KVA) | No change | (7.) | Power Plant | 170 MW (90 MW AFBC & WHRB + 80 MW CFBC) | 0 | 170 MW (90 MW AFBC & WHRB + 80 MW CFBC) | No Change 170 MW (90 MW - 2x120 TPH AFBC+ 4x 35 TPH WHRB and 80 MW- 1x336 TPH CFBC) | (8.) | Steel Plant (Electric Furnace) | 1.74 MTPA | 0 | 1.74 MTPA | No Change | (9.) | Sinter Plant | 0.75 MTPA | 0 | 0.75 MTPA | No Change | (10.) | Coal Beneficiation Plant | 1.0 MTPA | 0 | 1.0 MTPA | No change | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 04 Nov 2019 | (iv)Valid Upto | 13 Mar 2020 | (v)File No. | 6648/TS/CECB/2019 | (vi)Application No. | 3176715 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 57 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 5.7 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.3 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2939400 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2939400 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coke | 40020 | Tons per Annum | | Open Market | Road,Rail | | 1000 | Open Market | | Copy of Linkage | (2.) | Bentonite | 14835 | Tons per Annum | | Open Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (3.) | Iron ore | 2800020 | Tons per Annum | | Open Market | Road,Rail | | 1000 | Open Market | | Copy of Linkage | (4.) | Limestone | 45195 | Tons per Annum | | Open Market | Road,Rail | | 500 | Open Market | | Copy of Linkage | (5.) | Furnace oil | 39330 | Others | KL per Annum | Open Market | Road | | 500 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15.7 To 28.8 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.8 To 25.4 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 652 | 50 | Copy of Permission Letter | Pipeline | | Intake Well | | 3330/29/31/93/M/31/OJPRA/D-4 | 23 Jun 2008 | 18260000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Waste water from Pellet Plant | 10 | 20 | Settling tank & then reused in dust separation | Reuse within the Plant & Recycling | | 10 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 10 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste in Pellet Plant - ESP Dust | Industrial Waste | | 123057 | Tons | 0 | Conveyor Belt | | Others | Reused in Process | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 19.4 | 1 | 0 | 20.0 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 89.5 | 1 | 0 | 90.45 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 49.7 | 1 | 0 | 50.25 | 60 | (4.) | NOx | | Microgram per Meter Cube | 13.4 | 1 | 0 | 14.0 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Pellet Plant Stack | Blast Furnace gas, Coal & FO | 90 | 4.57 | Others | PM | 50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20800 | (b)Source | Captive Power Plant 170 MW | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2X1500 KVA | (e)Stack Height (in m) | 35 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 227.84 | Total Land (ha.) | 227.84 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 227.84 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 227.84 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 119 | | (2.) | Green belt | | 78 | | (3.) | Area for Solid Waste Management | | 7.34 | | (4.) | Others | Storage Area, Road & Open | 23.50 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | No WLS within 10 km radius | (2.) | NPA | Not Applicable | 0 | No NPA within 10 km radius | (3.) | ESZs | Not Applicable | 0 | No ESZ within 10 km radius | (4.) | Critically Polluted Area | Not Applicable | 0 | No CPA within 10 km radius | (5.) | Wildlife Corridors | Not Applicable | 0 | No Wildlife Corridors within 10 km radius | (6.) | ESAs | Not Applicable | 0 | No ESA within 10 km radius | (7.) | Corridors | Not Applicable | 0 | No Corridors within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Rabo Reserve Forest | 1 | Rabo, Urdana, Basnajhar, Taraimal & Burha Pahar RF | (2.) | Defence Installations | | Not Applicable | 0 | No defence installations within 10 km radius | (3.) | Archaeological Sites | | Not Applicable | 0 | No Archaeological sites within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 227.84 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Mand River | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 1400 | (c)Temporary Employment- During Construction | 85 | (d)Temporary Employment- During Operation | 1500 | (e)No. of working days | 345 | (f)Total Manpower | 2985 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 78 | 0 | 78 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 150000 | 25000 | 175000 | (4.) | Funds Allocated | 15000000 | 2500000 | 17500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | CSR activities & Indirect Employment Generation | (2.) | Financial | Improved livelihood with increased Business opportunities | (3.) | Environmental | No increase in pollution load | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J M EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001 | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 07 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP has already submitted a same proposal vide another no. IA/CG/IND/113837/2019 which was examined and following EDS was raised by Ministry on 13/08/2019 :
1. Existing Environmental clearance was obtained under the EIA Notification 1994 and so far public consultation has not been carried out as per the procedure prescribed in the EIA Notification, 2006.
2. In view of the above, proposal does not qualify under para 7(ii) of EIA Notification, 2006 as per the Ministry’s O.M. No.J-11013/41/2006-IA.II(I) dated 24/08/2009.
3. It is requested to apply for grant of ToR as per the prescribed procedure laid down in the EIA Notification, 2006.
However, the same proposal has been uploaded on PARIVESH with new proposal number.
In view of the above, the instant proposal is returned again with the aforesaid EDS. Further, it may be noted that submission of same proposal again under clause 7(ii) may invite coercive action against project proponent as per extant provisions laid down in the EIA notification, 2006. | 19 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 20 Nov 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | proposal was withdrawn by the project proponent | 06 Apr 2020 | 2. | NA | proposal was withdrawn by the project proponent | 06 Apr 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | RAJKUMAR PATEL | Designation | Factorymanager | Name of Company (Applicant Name should not be given here) | JSW ISPAT SPECIAL | Address | Village - Naharpali, Tahsil Kharsia, District - RAIGARH, CHHATTISGARH |
|