Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Sponge Iron Plant from 6,00,000 TPA to 14,90,000 TPA, Ferrol Alloys plant from 72000 to 96000 TPA with Briquette plant and addition of New Steel Melting Shop of 5,70,000 TPA capacity with
(b)Name of the Company / Organisation RASHMI CEMENT LIMITED
(c)Registered Address 39, SHAKESPEAR SARANAI,,PREMLATA BUILDING, 6TH FLOOR,Kolkata,West Bengal-700017
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BISWA NATH SHARMA
(b)Designation (Owner/ Partner/ CEO) AGM TECHNICAL & OPERATION
(c)Address 39, SHAKESPEAR SARANI,,PREMLATA BUILDING, 6TH FLOOR,,Kolkata,West Bengal-700017
(d)Pin code 700017
(e)E-mail bnsarma.rml@gmail.com
(f)STD Code. 0(f)Telephone No. 22438518
(g)Fax No. 03322438517
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/5852/2008
(d)Master Proposal Number(Single Window) SW/124745/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 273,273/294,287,744,746,747,748,749,750,751,752,75
(b)Pincode 721507
(c)Bounded Latitudes (North)
From
Degree 22.358
Minutes
Second
From
Degree 22.364
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.018
Minutes
Second
From
Degree 87.032
Minutes
Second
(e)Survey of India Topo Sheet No. F45J3 and F45I15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 92
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/604/2008.- IA II (I)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 05 Dec 2008
(c)Date of Issue of EC 12 Feb 2009
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :5
Sidho Kanho Meeting Hall located at the office compounf of the District Magistrate, Jhargram, West Bengal
State :West Bengal
District :West Medinipur
Tehsil :Jhargram
Village :Jhargram
117Control of Pollution to be generated from proposed plant, Development of local road, Employment, infrastructure facility, drinking water, health facility, Management of ground water depletionOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-214/07/EPE/461
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 19 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HOT ROLLING MILL0250000250000Tons per Annum(TPA)Road,Rail
(2.)Chrome Briquette Plant404080OthersTPHRoad,Conveyor Belt
(3.)Power Plant (WHRB)434588Mega Watt(MW)OthersPower line
(4.)DRI/ SPONGE IRON6000008900001490000Tons per Annum(TPA)Road,Rail
(5.)SAF(Ferro Alloy Plant) with Zigging Plant480004800096000Tons per Annum(TPA)Road,Rail
(6.)Power Plant (CFBC)02525Mega Watt(MW)OthersPower line
(7.)Cold Rolling Mill with Pickling & Galvanizing Line0300000300000Tons per Annum(TPA)Road,Rail
(8.)SMS( 8X20 T) LRF & AOD, CCM AND SLAG CRUSHER0570000570000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)SAF (Ferro Alloys)4 x9 MVA4 x 9 MVA8 x9 MVA
(2.)CFBC025 MW25 MW
(3.)Hot Rolling Mill0250000 TPA250000 TPA
(4.)DRI10 X 100 TPD + 1 X 350 TPD + 1 X 600 TPD3 X 600 TPD10 X100 TPD + 1 X350 TPD + 4 X 600 TPD
(5.)SMS with matching LRF & AOD, CCM08 x 20 T8 X 20 T
(6.)WHRB43 MW45 MW88 MW
(7.)ZIGGING PLANT06 X15 TPD6 X 15 TPD
(8.)Cold Rolling Mill with pickling & Galvanising line0300000 TPA300000 TPA
(9.)Chrome Briquette Plant1 X 40 TPH1 X 40 TPH2 X 40 TPH
(10.)SLAG CRUSHER02 X 20 TPH2 X 20 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 Dec 2016
(iv)Valid Upto 31 Dec 2021
(v)File No. 5683-hl-co-5/10/0399
(vi)Application No. CO102823
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 510
(b) Funds Allocated for Environment Management (Capital) (in Crores) 30.60
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.075
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2304919
(b)Existing quantity of raw material/fuel 1888000
(c)Total quantity of raw material/fuel 4192919
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore447000Tons per AnnumFrom Barbil, Joda, Orissa, Applied for Cap. MinesRail300 LinkageCopy of Linkage
(2.)Non coking coal for COP1277200Tons per AnnumFrom CCL,MCL & Imported CoalRail,Othersship300 MoUCopy of Linkage
(3.)Chrome Ore211200Tons per AnnumOdisha & JharkhandRoad,Rail300 e-auctionCopy of Linkage
(4.)Limestone40279Tons per AnnumFrom Birmitrapur, Orissa / Bilaspur, CGRail350 Open MarketCopy of Linkage
(5.)Iron ore pellets1788000Tons per AnnumOdisha Metaliks Limited, sister concernRoad200 CaptiveCopy of Linkage
(6.)Dolomite93240Tons per AnnumCaptive mines in Balaghat, MPRail350 Open MarketCopy of Linkage
(7.)Quartzite24000Tons per AnnumBelpahar Orissa / Bilaspur, Raipur CGRail500 Open MarketCopy of Linkage
(8.)Manganese Ore249600Tons per AnnumFrom Balaghat, MP & OrissaRoad,Rail1000 e-auctionCopy of Linkage
(9.)Coke62400Tons per AnnumFrom West Bengal, Orissa, ImportedRoad,Rail300 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube51.326.344.7460
(2.)SO2Micro Gram per Meter Cube15.34.19.880
(3.)PM10Micro Gram per Meter Cube91.342.671.5100
(4.)NOxMicro Gram per Meter Cube29.412.3321.880
(5.)OthersPbMicro Gram per Meter Cube0.020.020.021.0
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l480765002000
(2.)TSSmg/l0000
(3.)Heavy MetalsPbmg/l0.0050.0050.010.01
(4.)pHNA7.16.56.58.5
(5.)Total Hardnessmg/l18544200600
(6.)Chloridesmg/l41.25.42501000
(7.)OthersSulphatemg/l144200400
(8.)Fluoridemg/l0.220.0911.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.96.2C
(2.)OthersChloridemg/l226C
(3.)pHNA7.26.6C
(4.)BODmg/l2.92.1C
(5.)CODmg/l208C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))734275
(2.)Leq(Night)A-weighted decibels(dB(A))623070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare407247
(2.)Electric ConductivityMillisiemens per Centimetre0.1730.108
(3.)P(Phosphorus)Kilogram per hectare5128
(4.)pH6.74.8
(5.)K(Potassium)Kilogram per hectare512120
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 17 To 6.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.6 To 4.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater20600.5Copy of Permission LetterPipelineOthersBORE WELLP14177310076313 Mar 20142060
(2.)Surface247615Copy of Permission LetterPipelineIntake WellNil12 Oct 20182500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Captive Power Plant216220Settling and reuse for ash handling and in the processReuse within the Plant & Recycling,Green Belt Renewal Plant216
(2.)Rolling Mill120120Settling and reuseReuse within the Plant & Recycling120
(3.)Cold Rolling Mill7272Treatment in ETP and reuse in processReuse within the Plant & Recycling72
(4.)Domestic216230STPGreen Belt Renewal Plant216
(5.)SMS96100Settling and reuseReuse within the Plant & Recycling96
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 720
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 720
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dust from APC Devices of SMS & CPPIndustrial Waste95992Tons1RoadOthersCement & Brick Making, Road Construction
(2.)Iron oxide Powder from ARPIndustrial Waste1500Tons1RoadOthersSell to Tape & Paint manufacture
(3.)DUST FROM APCSIndustrial Waste213800Tons1RoadOthersCement & Brick Making, Road Construction
(4.)Zinc Ass/ DrossHazardous Waste (as per Hazardous and Other Waste Management rules 2016)845Tons1RoadAuthorized Recyclers
(5.)Miss RollIndustrial Waste20000Tons1RoadCo-Processing
(6.)Sludge from Galvanizing and Pickling lineHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1578Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Kiln Acceration DustIndustrial Waste11870Tons1RoadOthersRoad Construction
(8.)Fly ashFly Ash92106Tons1RoadOthersCement and Brick Manufacturing
(9.)SMS SlagIndustrial Waste83000Tons1RoadOthersBlock manufacturing and Road Making
(10.)Ferro Alloys SlagIndustrial Waste50000Tons1RoadCo-Processing
(11.)Sludge from ETPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)07Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
(12.)Dolochar From DRIIndustrial Waste281000Tons1RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube9.81.023.833.780
(2.)PM2.5Microgram per Meter Cube451.00.014660
(3.)NOxMicrogram per Meter Cube221.652880
(4.)PM10Microgram per Meter Cube71.41.04.876.3100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CFBCCoal/Char701.4NOx1.66
(2.)DRI6Coal500.8PM100.154
(3.)DRI 7 & 8Coal500.8SO22.07
(4.)DRI 11Coal601.4PM100.295
(5.)DRI 12Coal602.0PM100.533
(6.)DRI 12Coal602.0SO27.61
(7.)SAF 2Coal351PM100.082
(8.)DRI 15coal702SO27.81
(9.)SAF 8Coal351PM100.126
(10.)DRI 1 & 2Coal501SO22.007
(11.)DRI 3,4 & 5coal501PM100.133
(12.)DRI 15Coal702PM100.67
(13.)SAF 6Coal351PM100.126
(14.)CFBCCoal/ Char701.4SO23.32
(15.)Cold rolling MillCoal350.8PM100.08
(16.)DRI 1 & 2Coal501PM100.113
(17.)DRI 6coal500.8SO22.375
(18.)DRI 7 & 8Coal500.8PM100.158
(19.)DRI 9 & 10Coal500.8PM100.132
(20.)DRI 9 & 10Coal500.8SO22.006
(21.)DRI 11Coal601.4SO23.49
(22.)SAF1Coal351PM100.108
(23.)SAF3Coal351PM100.109
(24.)SAF 4coal351PM100.09
(25.)DRI 13 & 14Coal702.0PM100.74
(26.)DRI13 & 14Coal702SO28.6
(27.)SAF 5Coal351PM100.126
(28.)SAF7Coal351PM100.126
(29.)CFBCCoal/ Char701.4PM101.660
(30.)SMSCoal351PM100.190
(31.)DRI 3,4&5Coal501SO22.217
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 196600
(b)Source Captive 113 MW and balance 83 MW from WBSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 180 kVA
(e)Stack Height (in m) 35
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 48.56
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 48.56
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0.809
(e)Settlements (ha.) 0
(f)Industrial (ha.) 47.75
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : nil 0
    Total (ha.) 48.559
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant29.54
(2.)Green belt16.025
(3.)Water Reservoir0.809
(4.)Built Up Area0.809
(5.)OthersOpen area1.376
Total (ha.) 48.559
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0No Wildlife sanctuary within 10 Km
(2.)NPANil0No National park within 10 Km
(3.)ESAsNil0No Ecosensitive areas within 10 Km
(4.)ESZsNil0No ESZs located within 10 Km
(5.)Wildlife CorridorsNil0No Wildlife corridor located within 10 Km
(6.)CorridorsNil0No Wildlife corridor located within 10 Km
(7.)Critically Polluted AreaNil0No Critically polluted area within 10 Km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnil0No defense installation within 10 Km
(2.)Archaeological Sitesnil0No archaeological site within 10 Km
(3.)ForestJhargram Forest range2Revenue Forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 48.56
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Rain water harvesting reservoir
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kangsabati Canal
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 315
(b)Permanent Employment-During Operation 1335
(c)Temporary Employment- During Construction 1050
(d)Temporary Employment- During Operation 2050
(e)No. of working days 330
(f)Total Manpower 4750
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt15.051.1316.18
(2.)Percentage of Total Project Area312.3333.33
(3.)No. of Plants270001350040500
(4.)Funds Allocated5000001000000010500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalPollution control, Plantation and Rain water harvesting
(2.)SocialSocial activities has been planned as per CER plan
(3.)FinancialEmployment created for local people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0086
(ii)Name of the EIA Consultant Kalyani Laboratories Private Limited
(iii)Address Plot No.78/944, Millenium City, Near Nissan Show room, Pahala, Bhubaneswar - 752101
(iv)Mobile No. 9437306091
(v)Landline No. 0674297405
(vi)Email Id kalyanilab@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAHazard Identification and Risk Assessment (HIRA) study has not been adequately carried out in respect of qualitative and quantitative assessment and preparation of Emergency Response Plan. Hence, HIRA shall be carried out properly and report shall be furnished. 18 Nov 2019
2.NAThe correction have been made as per the instruction received 19 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBISWA NATH SHARMA
DesignationAGM TECHNICAL & OPERATION
Name of Company (Applicant Name should not be given here)RASHMI CEMENT LIMITED
Address39, SHAKESPEAR SARANAI,