1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Sponge Iron Plant from 6,00,000 TPA to 14,90,000 TPA, Ferrol Alloys plant from 72000 to 96000 TPA with Briquette plant and addition of New Steel Melting Shop of 5,70,000 TPA capacity with | (b)Name of the Company / Organisation | RASHMI CEMENT LIMITED | (c)Registered Address | 39, SHAKESPEAR SARANAI,,PREMLATA BUILDING, 6TH FLOOR,Kolkata,West Bengal-700017 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | BISWA NATH SHARMA | (b)Designation (Owner/ Partner/ CEO) | AGM TECHNICAL & OPERATION | (c)Address | 39, SHAKESPEAR SARANI,,PREMLATA BUILDING, 6TH FLOOR,,Kolkata,West Bengal-700017 | (d)Pin code | 700017 | (e)E-mail | bnsarma.rml@gmail.com | (f)STD Code. | 0(f)Telephone No. | 22438518 | (g)Fax No. | 03322438517 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND/5852/2008 | (d)Master Proposal Number(Single Window) | SW/124745/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 273,273/294,287,744,746,747,748,749,750,751,752,75 | (b)Pincode | 721507 | (c)Bounded Latitudes (North) | | From | | Degree | 22.358 | Minutes | | Second | | From | | Degree | 22.364 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 87.018 | Minutes | | Second | | From | | Degree | 87.032 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45J3 and F45I15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 92 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 15 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/604/2008.- IA II (I) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 05 Dec 2008 | (c)Date of Issue of EC | 12 Feb 2009 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Aug 2019 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Sidho Kanho Meeting Hall located at the office compounf of the District Magistrate, Jhargram, West Bengal | State : | West Bengal | District : | West Medinipur | Tehsil : | Jhargram | Village : | Jhargram |
| 117 | Control of Pollution to be generated from proposed plant, Development of local road, Employment, infrastructure facility, drinking water, health facility, Management of ground water depletion | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 102-214/07/EPE/461 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 19 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | HOT ROLLING MILL | 0 | 250000 | 250000 | Tons per Annum(TPA) | | Road,Rail | | (2.) | Chrome Briquette Plant | 40 | 40 | 80 | Others | TPH | Road,Conveyor Belt | | (3.) | Power Plant (WHRB) | 43 | 45 | 88 | Mega Watt(MW) | | Others | Power line | (4.) | DRI/ SPONGE IRON | 600000 | 890000 | 1490000 | Tons per Annum(TPA) | | Road,Rail | | (5.) | SAF(Ferro Alloy Plant) with Zigging Plant | 48000 | 48000 | 96000 | Tons per Annum(TPA) | | Road,Rail | | (6.) | Power Plant (CFBC) | 0 | 25 | 25 | Mega Watt(MW) | | Others | Power line | (7.) | Cold Rolling Mill with Pickling & Galvanizing Line | 0 | 300000 | 300000 | Tons per Annum(TPA) | | Road,Rail | | (8.) | SMS( 8X20 T) LRF & AOD, CCM AND SLAG CRUSHER | 0 | 570000 | 570000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | SAF (Ferro Alloys) | 4 x9 MVA | 4 x 9 MVA | 8 x9 MVA | | (2.) | CFBC | 0 | 25 MW | 25 MW | | (3.) | Hot Rolling Mill | 0 | 250000 TPA | 250000 TPA | | (4.) | DRI | 10 X 100 TPD + 1 X 350 TPD + 1 X 600 TPD | 3 X 600 TPD | 10 X100 TPD + 1 X350 TPD + 4 X 600 TPD | | (5.) | SMS with matching LRF & AOD, CCM | 0 | 8 x 20 T | 8 X 20 T | | (6.) | WHRB | 43 MW | 45 MW | 88 MW | | (7.) | ZIGGING PLANT | 0 | 6 X15 TPD | 6 X 15 TPD | | (8.) | Cold Rolling Mill with pickling & Galvanising line | 0 | 300000 TPA | 300000 TPA | | (9.) | Chrome Briquette Plant | 1 X 40 TPH | 1 X 40 TPH | 2 X 40 TPH | | (10.) | SLAG CRUSHER | 0 | 2 X 20 TPH | 2 X 20 TPH | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 14 Dec 2016 | (iv)Valid Upto | 31 Dec 2021 | (v)File No. | 5683-hl-co-5/10/0399 | (vi)Application No. | CO102823 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 510 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 30.60 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.075 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.06 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2304919 | (b)Existing quantity of raw material/fuel | 1888000 | (c)Total quantity of raw material/fuel | 4192919 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 447000 | Tons per Annum | | From Barbil, Joda, Orissa, Applied for Cap. Mines | Rail | | 300 | Linkage | | Copy of Linkage | (2.) | Non coking coal for COP | 1277200 | Tons per Annum | | From CCL,MCL & Imported Coal | Rail,Others | ship | 300 | MoU | | Copy of Linkage | (3.) | Chrome Ore | 211200 | Tons per Annum | | Odisha & Jharkhand | Road,Rail | | 300 | e-auction | | Copy of Linkage | (4.) | Limestone | 40279 | Tons per Annum | | From Birmitrapur, Orissa / Bilaspur, CG | Rail | | 350 | Open Market | | Copy of Linkage | (5.) | Iron ore pellets | 1788000 | Tons per Annum | | Odisha Metaliks Limited, sister concern | Road | | 200 | Captive | | Copy of Linkage | (6.) | Dolomite | 93240 | Tons per Annum | | Captive mines in Balaghat, MP | Rail | | 350 | Open Market | | Copy of Linkage | (7.) | Quartzite | 24000 | Tons per Annum | | Belpahar Orissa / Bilaspur, Raipur CG | Rail | | 500 | Open Market | | Copy of Linkage | (8.) | Manganese Ore | 249600 | Tons per Annum | | From Balaghat, MP & Orissa | Road,Rail | | 1000 | e-auction | | Copy of Linkage | (9.) | Coke | 62400 | Tons per Annum | | From West Bengal, Orissa, Imported | Road,Rail | | 300 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 51.3 | 26.3 | 44.74 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 15.3 | 4.1 | 9.8 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 91.3 | 42.6 | 71.5 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 29.4 | 12.33 | 21.8 | 80 | (5.) | Others | Pb | Micro Gram per Meter Cube | 0.02 | 0.02 | 0.02 | 1.0 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 480 | 76 | 500 | 2000 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | Heavy Metals | | Pb | mg/l | | 0.005 | 0.005 | 0.01 | 0.01 | (4.) | pH | | | NA | | 7.1 | 6.5 | 6.5 | 8.5 | (5.) | Total Hardness | | | mg/l | | 185 | 44 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 41.2 | 5.4 | 250 | 1000 | (7.) | Others | Sulphate | | mg/l | | 14 | 4 | 200 | 400 | (8.) | Fluoride | | | mg/l | | 0.22 | 0.09 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.9 | 6.2 | C | (2.) | Others | Chloride | mg/l | | 22 | 6 | C | (3.) | pH | | NA | | 7.2 | 6.6 | C | (4.) | BOD | | mg/l | | 2.9 | 2.1 | C | (5.) | COD | | mg/l | | 20 | 8 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 73 | 42 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 62 | 30 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 407 | 247 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.173 | 0.108 | (3.) | P(Phosphorus) | Kilogram per hectare | | 51 | 28 | (4.) | pH | | | 6.7 | 4.8 | (5.) | K(Potassium) | Kilogram per hectare | | 512 | 120 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 17 To 6.6 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 11.6 To 4.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 2060 | 0.5 | Copy of Permission Letter | Pipeline | | Others | BORE WELL | P141773100763 | 13 Mar 2014 | 2060 | (2.) | Surface | | 2476 | 15 | Copy of Permission Letter | Pipeline | | Intake Well | | Nil | 12 Oct 2018 | 2500 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Captive Power Plant | 216 | 220 | Settling and reuse for ash handling and in the process | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 216 | | (2.) | Rolling Mill | 120 | 120 | Settling and reuse | Reuse within the Plant & Recycling | | 120 | | (3.) | Cold Rolling Mill | 72 | 72 | Treatment in ETP and reuse in process | Reuse within the Plant & Recycling | | 72 | | (4.) | Domestic | 216 | 230 | STP | Green Belt Renewal Plant | | 216 | | (5.) | SMS | 96 | 100 | Settling and reuse | Reuse within the Plant & Recycling | | 96 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 720 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 720 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dust from APC Devices of SMS & CPP | Industrial Waste | | 95992 | Tons | 1 | Road | | Others | Cement & Brick Making, Road Construction | (2.) | Iron oxide Powder from ARP | Industrial Waste | | 1500 | Tons | 1 | Road | | Others | Sell to Tape & Paint manufacture | (3.) | DUST FROM APCS | Industrial Waste | | 213800 | Tons | 1 | Road | | Others | Cement & Brick Making, Road Construction | (4.) | Zinc Ass/ Dross | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 845 | Tons | 1 | Road | | Authorized Recyclers | | (5.) | Miss Roll | Industrial Waste | | 20000 | Tons | 1 | Road | | Co-Processing | | (6.) | Sludge from Galvanizing and Pickling line | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1578 | Tons | 1 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (7.) | Kiln Acceration Dust | Industrial Waste | | 11870 | Tons | 1 | Road | | Others | Road Construction | (8.) | Fly ash | Fly Ash | | 92106 | Tons | 1 | Road | | Others | Cement and Brick Manufacturing | (9.) | SMS Slag | Industrial Waste | | 83000 | Tons | 1 | Road | | Others | Block manufacturing and Road Making | (10.) | Ferro Alloys Slag | Industrial Waste | | 50000 | Tons | 1 | Road | | Co-Processing | | (11.) | Sludge from ETP | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 07 | Tons | 1 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (12.) | Dolochar From DRI | Industrial Waste | | 281000 | Tons | 1 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 9.8 | 1.0 | 23.8 | 33.7 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 45 | 1.0 | 0.01 | 46 | 60 | (3.) | NOx | | Microgram per Meter Cube | 22 | 1.6 | 5 | 28 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 71.4 | 1.0 | 4.8 | 76.3 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | CFBC | Coal/Char | 70 | 1.4 | NOx | | 1.66 | (2.) | DRI6 | Coal | 50 | 0.8 | PM10 | | 0.154 | (3.) | DRI 7 & 8 | Coal | 50 | 0.8 | SO2 | | 2.07 | (4.) | DRI 11 | Coal | 60 | 1.4 | PM10 | | 0.295 | (5.) | DRI 12 | Coal | 60 | 2.0 | PM10 | | 0.533 | (6.) | DRI 12 | Coal | 60 | 2.0 | SO2 | | 7.61 | (7.) | SAF 2 | Coal | 35 | 1 | PM10 | | 0.082 | (8.) | DRI 15 | coal | 70 | 2 | SO2 | | 7.81 | (9.) | SAF 8 | Coal | 35 | 1 | PM10 | | 0.126 | (10.) | DRI 1 & 2 | Coal | 50 | 1 | SO2 | | 2.007 | (11.) | DRI 3,4 & 5 | coal | 50 | 1 | PM10 | | 0.133 | (12.) | DRI 15 | Coal | 70 | 2 | PM10 | | 0.67 | (13.) | SAF 6 | Coal | 35 | 1 | PM10 | | 0.126 | (14.) | CFBC | Coal/ Char | 70 | 1.4 | SO2 | | 3.32 | (15.) | Cold rolling Mill | Coal | 35 | 0.8 | PM10 | | 0.08 | (16.) | DRI 1 & 2 | Coal | 50 | 1 | PM10 | | 0.113 | (17.) | DRI 6 | coal | 50 | 0.8 | SO2 | | 2.375 | (18.) | DRI 7 & 8 | Coal | 50 | 0.8 | PM10 | | 0.158 | (19.) | DRI 9 & 10 | Coal | 50 | 0.8 | PM10 | | 0.132 | (20.) | DRI 9 & 10 | Coal | 50 | 0.8 | SO2 | | 2.006 | (21.) | DRI 11 | Coal | 60 | 1.4 | SO2 | | 3.49 | (22.) | SAF1 | Coal | 35 | 1 | PM10 | | 0.108 | (23.) | SAF3 | Coal | 35 | 1 | PM10 | | 0.109 | (24.) | SAF 4 | coal | 35 | 1 | PM10 | | 0.09 | (25.) | DRI 13 & 14 | Coal | 70 | 2.0 | PM10 | | 0.74 | (26.) | DRI13 & 14 | Coal | 70 | 2 | SO2 | | 8.6 | (27.) | SAF 5 | Coal | 35 | 1 | PM10 | | 0.126 | (28.) | SAF7 | Coal | 35 | 1 | PM10 | | 0.126 | (29.) | CFBC | Coal/ Char | 70 | 1.4 | PM10 | | 1.660 | (30.) | SMS | Coal | 35 | 1 | PM10 | | 0.190 | (31.) | DRI 3,4&5 | Coal | 50 | 1 | SO2 | | 2.217 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 196600 | (b)Source | Captive 113 MW and balance 83 MW from WBSEDCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 180 kVA | (e)Stack Height (in m) | 35 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 48.56 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 48.56 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0.809 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 47.75 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : nil | 0 | Total (ha.) | 48.559 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 29.54 | | (2.) | Green belt | | 16.025 | | (3.) | Water Reservoir | | 0.809 | | (4.) | Built Up Area | | 0.809 | | (5.) | Others | Open area | 1.376 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | No Wildlife sanctuary within 10 Km | (2.) | NPA | Nil | 0 | No National park within 10 Km | (3.) | ESAs | Nil | 0 | No Ecosensitive areas within 10 Km | (4.) | ESZs | Nil | 0 | No ESZs located within 10 Km | (5.) | Wildlife Corridors | Nil | 0 | No Wildlife corridor located within 10 Km | (6.) | Corridors | Nil | 0 | No Wildlife corridor located within 10 Km | (7.) | Critically Polluted Area | Nil | 0 | No Critically polluted area within 10 Km | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | nil | 0 | No defense installation within 10 Km | (2.) | Archaeological Sites | | nil | 0 | No archaeological site within 10 Km | (3.) | Forest | | Jhargram Forest range | 2 | Revenue Forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 48.56 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Nil | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Rain water harvesting reservoir | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kangsabati Canal | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 3.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 315 | (b)Permanent Employment-During Operation | 1335 | (c)Temporary Employment- During Construction | 1050 | (d)Temporary Employment- During Operation | 2050 | (e)No. of working days | 330 | (f)Total Manpower | 4750 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 15.05 | 1.13 | 16.18 | (2.) | Percentage of Total Project Area | 31 | 2.33 | 33.33 | (3.) | No. of Plants | 27000 | 13500 | 40500 | (4.) | Funds Allocated | 500000 | 10000000 | 10500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Pollution control, Plantation and Rain water harvesting | (2.) | Social | Social activities has been planned as per CER plan | (3.) | Financial | Employment created for local people | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0086 | (ii)Name of the EIA Consultant | Kalyani Laboratories Private Limited | (iii)Address | Plot No.78/944, Millenium City, Near Nissan Show room, Pahala, Bhubaneswar - 752101 | (iv)Mobile No. | 9437306091 | (v)Landline No. | 0674297405 | (vi)Email Id | kalyanilab@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 22 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Hazard Identification and Risk Assessment (HIRA) study has not been adequately carried out in respect of qualitative and quantitative assessment and preparation of Emergency Response Plan. Hence, HIRA shall be carried out properly and report shall be furnished. | 18 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 19 Nov 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | BISWA NATH SHARMA | Designation | AGM TECHNICAL & OPERATION | Name of Company (Applicant Name should not be given here) | RASHMI CEMENT LIMITED | Address | 39, SHAKESPEAR SARANAI, |
|