Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Lepro Herbals Pvt Ltd
(b)Name of the Company / Organisation LEPRO HERBALS PVT LTD
(c)Registered Address GT ROAD, VILLAGE- JATTIPUR,HARYANA,,Panipat,Haryana-132101
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SUNIL MALIK
(b)Designation (Owner/ Partner/ CEO) VP
(c)Address 311,313,315,317 EMPIRE PLAZA,M.G. ROAD,SULTANPUR, NEW DEHLI,,Vasant Vihar,South West,Delhi-110030
(d)Pin code 110030
(e)E-mail maliksunil1169@gmail.com
(f)STD Code. 129(f)Telephone No. 26809882
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/IND2/74345/2018
(d)Master Proposal Number(Single Window) SW/124621/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 6/1, 10/1, 10/2, 11, 12, 12/1,12/2, 13, 13/1, 14,
(b)Pincode 132101
(c)Bounded Latitudes (North)
From
Degree 291753.26
Minutes
Second
From
Degree 291757.22
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 765944.14
Minutes
Second
From
Degree 770001.34
Minutes
Second
(e)Survey of India Topo Sheet No. 53C/15, 53G/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 237
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 50
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaPanipatSamalkha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/138/2018-IA-II(I)
(b)Date of Apply of TOR 12 Apr 2018
(c)Date of Issue of TOR / Standard ToR 01 Jun 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
At project site of Lepro Herbals Pvt Ltd G T road, village-Jhattipur,Tehsil-Samalkha,District-Panipat (Haryana.).
State :Haryana
District :Panipat
Tehsil :Samalkha
Village :Jhattipur
111Issue of groundwater and prevention of air pollution, Noise and smoke, Maintenance of ZLD and treatment of effluentOthersAdditional Deputy Commissioner
(2.)
Date of Advertisement :09 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
At project site of Lepro Herbals Pvt Ltd G T road, village-Jhattipur,Tehsil-Samalkha,District-Panipat (Haryana.).
State :Haryana
District :Panipat
Tehsil :Samalkha
Village :Jhattipur
111Issue of groundwater and prevention of air pollution, Noise and smoke, Maintenance of ZLD and treatment of effluentOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)DG Set1820kVA
(2.)Semi- Synthetic (Alkaloids)2.0 TPANA
(3.)Pure Herbal(Alkaloids)39.0 TPANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Boswelia Gum10Tons per AnnumRoad
(2.)Kalmeg5Tons per AnnumRoad
(3.)Passiflora Leaves5Tons per AnnumRoad
(4.)Ginger Roots2Tons per AnnumRoad
(5.)Nutmeg Seeds8Tons per AnnumRoad
(6.)Butchers Broom20Tons per AnnumRoad
(7.)Humulus lupulus0.5Tons per AnnumRoad
(8.)Sugar cane Wax (Mud)1Tons per AnnumRoad
(9.)Turmeric Roots2Tons per AnnumRoad
(10.)Grape Seeds2Tons per AnnumRoad
(11.)Prunus Africana20Tons per AnnumRoad
(12.)Japanese Atractylodes60Tons per AnnumRoad
(13.)Centella Leaves250Tons per AnnumRoad
(14.)Cardace Seeds10Tons per AnnumRoad
(15.)Coleus Roots80Tons per AnnumRoad
(16.)Anogessius Seeds3Tons per AnnumRoad
(17.)Valerian Roots13Tons per AnnumRoad
(18.)Horse Chest Nut129Tons per AnnumRoad
(19.)Pomegranate Peels2Tons per AnnumRoad
(20.)Tobacco Dust125Tons per AnnumRoad
(21.)Glycrrihizia Glabra1124Tons per AnnumRoad
(22.)Euphorbia Prostrata30Tons per AnnumRoad
(23.)Olive leaves6.5Tons per AnnumRoad
(24.)Red Clover2Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Aug 2018
(iv)Valid Upto 30 Sep 2020
(v)File No. HSPCB/Consent/: 313106018PITCTO5464354
(vi)Application No. 5464354
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 44.08
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.81
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.087
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1747
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1747
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel282.82Tons per AnnumNearby pumpRoad1.5 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube71.644.670.9100
(2.)NOxMicro Gram per Meter Cube15.36.014.980
(3.)OthersCOMicro Gram per Meter Cube9164589162000
(4.)PM2.5Micro Gram per Meter Cube46.624.146.160
(5.)SO2Micro Gram per Meter Cube12.16.012.080
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l421.8715.992501000
(2.)Fluoridemg/l1.70.381.01.5
(3.)Heavy Metalsmercurymg/l0.0010.0010.0010
(4.)pHNA8.086.866.58.5
(5.)TSSmg/l0000
(6.)TDSmg/l40643965002000
(7.)Total Hardnessmg/l1836144200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.667.57C
(2.)BODmg/l3.02.8C
(3.)CODmg/l10.08.0C
(4.)DOmg/l5.35.2C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))66.441.575
(2.)Leq(Night)A-weighted decibels(dB(A))60.439.570
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milliequivalents per 100 Gram20.231.33
(2.)Electric ConductivityOthersmho/cm1210215
(3.)pH8.607.43
(4.)N(Nitrogen)Milliequivalents per 100 Gram10034
(5.)K(Potassium)Milliequivalents per 100 Gram345
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1080Copy of Permission LetterPipelineTube Well030 May 2017108
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1015STPGreen Belt Renewal Plant10
(2.)Industrial2935ETPReuse within the Plant & Recycling29
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 39
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 39
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeIndustrial Waste3000Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Off Specification ProductIndustrial Waste0.2Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Expiry Drugs/ MedicinesIndustrial Waste0.2Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Process Residue and Waste Process OilIndustrial Waste30Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Spent CarbonIndustrial Waste0.7Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spent SolventIndustrial Waste18Kilolitre150RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Empty Barrels and ContainersIndustrial Waste450Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Used Oil and Spent OilIndustrial Waste1Kilolitre150RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)DomesticMunicipal Solid Waste21Tons10RoadOthersMunicipal Corporation Panipat- Disposal Sites
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube91601.3917.42000
(2.)NOxMicrogram per Meter Cube15.301.717.180
(3.)PM10Microgram per Meter Cube0000.01100
(4.)SO2Microgram per Meter Cube0000.0180
(5.)PM2.5Microgram per Meter Cube0000.0160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
(2.)0000NOx0
(3.)0000OthersCO0
(4.)0000SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1012.5
(b)Source Dakshin Haryana Bijli Vitran Nigam, Haryana
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Existing - DG set 500kVA- 3 Nos., 320kVA(1nos.), P
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.3254
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.3254
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 3.3254
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 3.3254
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.67
(2.)Main Plant2.6554
Total (ha.) 3.3254
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone98None within 10 km from the project site
(2.)ESAsNone97None within 10 km from the project site
(3.)ESZsNone97None within 10 km from the project site
(4.)Critically Polluted AreaPanipat8.08.0km from the project site
(5.)NPANone100None within 10 km from the project site
(6.)CorridorsNone97None within 10 km from the project site
(7.)Wildlife CorridorsNone97None within 10 km from the project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone15None within 10 km from the project site
(2.)Archaeological SitesNone15None within 10 km from the project site
(3.)Defence InstallationsNone15None within 10 km from the project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.3254
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Western Yamuna Canal
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.29
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 198
(c)Temporary Employment- During Construction 34
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 232
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.67
(b)Percentage of Total Project Area 20.15
(c)No. of Plants to be Planted 250
(d)Funds Allocated for Plantation 260000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in green cover. Implementations of RWH system. Treatment of domestic waste water in sewage treatment plant. Leak detection and control system. Fire fighting facilities as per OISD Norms. Provision of acoustic enclosures of DG set. PUC certified vehicle for transportation.
(2.)SocialImprovements in physical infrastructure. Improvements in social Infrastructure. Increase in employment potential. Contribution to the exchequer.
(3.)FinancialIncrease government revenue. Employment will also be generated for local persons. It will help in bringing prosperity to the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 46
(ii)Name of the EIA Consultant Enkay Enviro Services Pvt. Ltd.
(iii)Address # 92, Heera Nagar - A, Near Shalimar Bagh, Ajmer Road, Jaipur (Raj.). -, Pin Code:- 302021
(iv)Mobile No. 9314363996
(v)Landline No. 0141492077
(vi)Email Id info@enkayenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. The EIA report contains 11 chapters in place of 12 Chapters. (ii) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised. (iii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted. (iv) Issues raised during the public hearing has not been properly addressed in the EIA/EMP report. The details of action plan on the issues raised during PH along with budgetary provisions & timelines needs to be submitted. Also, the uploaded copy of public hearing is not clearly visible. Please again upload. 05 Dec 2019
2.NAThe correction have been made as per the instruction received 24 Jan 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSUNIL MALIK
DesignationVP
Name of Company (Applicant Name should not be given here)LEPRO HERBALS PVT LTD
AddressGT ROAD, VILLAGE- JATTIPUR,HARYANA
Print