|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | PROPOSED SPECIALTY CHEMICALS IN EXISTING INORGANIC MANUFACTURING UNIT | (b)Name of the Company / Organisation | DIVINE CHEMICALS | (c)Registered Address | Amita CHS Pvt Ltd. Room No 15, Society No 30 S V P Nagar Mhada, Andheri West. Mumbai 400053.,,Mumbai (Suburban),Maharashtra-400053 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ramnik Patel | (b)Designation (Owner/ Partner/ CEO) | CEO | (c)Address | Plot No. 3004/3917, GIDC Estate, Panol,,Anklesvar,Bharuch,Gujarat-394116 | (d)Pin code | 394116 | (e)E-mail | divinechemicals2010@gmail.com | (f)STD Code. | 261(f)Telephone No. | 2707273 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/124522/2019 | (d)Master Proposal Number(Single Window) | SW/124515/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 3004, 2917 | (b)Pincode | 394116 | (c)Bounded Latitudes (North) | | From | | Degree | 21.549126 | Minutes | | Second | | From | | Degree | 21.549127 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.992791 | Minutes | | Second | | From | | Degree | 72.992792 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 28 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 15 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | SEIAA/GUJ/TOR/5(f)/701/2019 | (b)Date of Apply of TOR | 21 Feb 2019 | (c)Date of Issue of TOR / Standard ToR | 04 May 2019 | (d)Date of Apply of EC | 21 Feb 2019 | (e)Date of Issue of EC | 04 May 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Located in GIDC-Panoli | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | AWH-75043 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 30 2015 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Calcium Chloride | 150 | 0 | 150 | Others | MT/Month | Road | | (2.) | Copper Sulfate | 100 | 0 | 100 | Others | MT/Month | Road | | (3.) | 2,4-thiazolidinedione | 0 | 1 | 1 | Others | MT/Month | Road | | (4.) | 1-(4-Rphenyl)-2-piperidone | 0 | 1 | 1 | Others | MT/Month | Road | | (5.) | 2-Piperidone(2-PD) | 0 | 1 | 1 | Others | MT/Month | Road | | (6.) | Specialty Chemicals | 0 | 5 | 5 | Others | MT/Month | Road | | (7.) | Anthranilic acid | 0 | 2 | 2 | Others | MT/Month | Road | | (8.) | [1,2,4]triazolo[4,3-a]pyridine-3 (2H)-one | 0 | 5 | 5 | Others | MT/Month | Road | | (9.) | 1-(2-Hydroxy ethyl)pyrolidine | 0 | 1 | 1 | Others | MT/Month | Road | | (10.) | 4-hydroxy Coumarin | 0 | 1 | 1 | Others | MT/Month | Road | | (11.) | Trimethyl ortho benzoate | 0 | 2 | 2 | Others | MT/Month | Road | | (12.) | Ferrous Sulfate | 100 | 0 | 100 | Others | MT/Month | Road | | (13.) | Tri alkyl ortho alkonates | 0 | 1 | 1 | Others | MT/Month | Road | | (14.) | 4-chloro butyraldehyde dimethyl acetal | 0 | 1 | 1 | Others | MT/Month | Road | | (15.) | Dimethyl Formamide Dimethyl Acetal | 0 | 9 | 9 | Others | MT/Month | Road | | (16.) | 3-(2-amino-2-oxoethyl)-5-methyl hexanoic acid | 0 | 5 | 5 | Others | MT/Month | Road | | (17.) | Theobromine | 0 | 5 | 5 | Others | MT/Month | Road | | (18.) | Speciality Chemicals | 0 | 10 | 10 | Others | MT/Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | S.S REACTOR | 1 | 1 | 2 | Cap. 3000 LTR | (2.) | GLASS LINE REACTOR | 0 | 2 | 2 | Cap. 3000 LTR | (3.) | TRAY DRYER | 0 | 2 | 2 | Cap. 96 TRAYS | (4.) | HDPE VESSEL | 0 | 1 | 1 | Cap. 5000 LTR | (5.) | S.S REACTOR | 1 | 0 | 1 | Cap. 10000 LTR | (6.) | S.S REACTOR | 3 | 1 | 4 | Cap. 5000 LTR | (7.) | CENTRIFUGE S.S BASKET | 0 | 2 | 2 | Cap. 48? Dia. | (8.) | NUTSCHE FILTER | 0 | 2 | 2 | Cap. 2000 LTR | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Dec 2015 | (iv)Valid Upto | 19 Oct 2020 | (v)File No. | GPCB/ANK/CCA-17744/ID-19146/ | (vi)Application No. | AWH-75043 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4.5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.486 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.045 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.0184 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 100 | (b)Existing quantity of raw material/fuel | 350 | (c)Total quantity of raw material/fuel | 450 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Toluene | 70 | Tons per Annum | | Local Market | Road | | 10 | Open Market | | Copy of Linkage | (2.) | Sulfuric Acid | 600 | Tons per Annum | | Local Market | Road | | 10 | Open Market | | Copy of Linkage | (3.) | HCl | 1200 | Tons per Annum | | Local Market | Road | | 10 | Open Market | | Copy of Linkage | (4.) | Methanol | 563 | Tons per Annum | | Local Market | Road | | 10 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 28.53 | 15.11 | 28 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 51.28 | 41.93 | 51 | 60 | (3.) | Others | ozone | Micro Gram per Meter Cube | 11.73 | 9.74 | 11 | 100 | (4.) | PM10 | | Micro Gram per Meter Cube | 137.6 | 111.2 | 137 | 100 | (5.) | SO2 | | Micro Gram per Meter Cube | 26.72 | 14.87 | 26 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1478 | 372 | 500 | 2000 | (2.) | Heavy Metals | | iron | mg/l | | 22.08 | 0.23 | 0.3 | 1 | (3.) | pH | | | NA | | 8.02 | 7.37 | 6.5 | 8.5 | (4.) | Total Hardness | | | mg/l | | 753 | 165.3 | 300 | 600 | (5.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (6.) | TSS | | | mg/l | | 68 | 2 | 80 | 100 | (7.) | Chlorides | | | mg/l | | 267.4 | 98.55 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.33 | 8.33 | A | (2.) | DO | | mg/l | | 5.42 | 5.42 | A | (3.) | COD | | mg/l | | 124.3 | 124.3 | A | (4.) | BOD | | mg/l | | 0 | 0 | A | (5.) | Others | Copper | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 55 | 46 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 47 | 37 | 65 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.16 | 7.32 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 216 | 52 | (3.) | K(Potassium) | Milligram per Kilogram | | 1082 | 260 | (4.) | Electric Conductivity | Milligram per Kilogram | | 52.35 | 47.35 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 20.25 | 12 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 100 To 80 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 50 To 60 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water | 44.67 | 10 | Copy of Permission Letter | Pipeline | | Intake Well | | NAO/PNL/1318 | 27 Nov 2018 | 44.67 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 4 | 4 | Soak pit & septic tank | Others | septic tank & soak pit | 0 | 4 | (2.) | Industrial | 18.68 | 19 | ETP (Primary Treatment) | Others | Common MEE of BEIL,Dahej | 0 | 18.68 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 22.68 | (b)Total Discharged Water (Kilolitre per Day) | 22.68 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Industrial Waste | | 5 | Tons | 10 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Na2SO4, NaBr, Acetic Acid, Ammonium Sulphate | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 31.1 | Tons | 15 | Road | | Others | rule 9 | (3.) | Organic Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20 | Tons | 10 | Road | | Co-Processing | | (4.) | Solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 480 | Tons | 10 | Road | | Others | Reuse | (5.) | Discarded Containers/bags/liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 10 | Road | | Authorized Recyclers | | (6.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 10 | Road | | Authorized Recyclers | | (7.) | HCl | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Tons | 10 | Road | | Others | reuse | (8.) | Sodium Chloride sol | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 10 | Pipe Conveyor | | Others | ETP | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 77.8 | 0.28 | 0.1 | 77.9 | 100 | (2.) | NOx | | Microgram per Meter Cube | 21.06 | 0.28 | 0.03 | 22 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 44.1 | 0.28 | 0.5 | 45 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 17.5 | 0.28 | 0.1 | 18 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | boiler | Natural gas | 12 | 0.2 | Others | PM10,SO2, NOx | 150,100,50 | (2.) | Baby Boiler (existing) | Natural gas | 12 | 0.2 | Others | PM10,SO2,NOX | 150,100,50 | (3.) | THF | Natural gas | 11 | 0.2 | Others | pm10,so2,nox | 150,100,50 | (4.) | DG Set | LDO | 11 | 0.1 | Others | pm10,so2,nox | 150,100,50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 160 KVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.2544 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.2544 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 6661 | (b)Waste/Barren Land (ha.) | 4089 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 112 | (e)Settlements (ha.) | 2230 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow, Open, River & Canal, Orchards, River bad, | 18314 | Total (ha.) | 31406 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.0680 | | (2.) | Green belt | | 0.0839 | | (3.) | Area for Solid Waste Management | | 0.0035 | haz. waste storage area | (4.) | Others | Utility, storage area,etc | 0.099 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | - | 0 | - | (2.) | ESAs | - | 0 | - | (3.) | NPA | - | 0 | - | (4.) | Wildlife Corridors | - | 0 | - | (5.) | WLS | - | 0 | - | (6.) | ESZs | - | 0 | - | (7.) | Corridors | -- | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | - | 0 | - | (2.) | Archaeological Sites | | - | 0 | - | (3.) | Defence Installations | | - | 0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.2544 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 12 | (c)Temporary Employment- During Construction | 8 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 325 | (f)Total Manpower | 40 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 839 | 0 | 839 | (2.) | No. of Plants | 210 | 0 | 210 | (3.) | Funds Allocated | 680000 | 0 | 680000 | (4.) | Percentage of Total Project Area | 33 | 0 | 33 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay order Against QCI | (ii)Name of the EIA Consultant | Aqua Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Center Point, Nr. Kadiwala School, Ring Road, Surat– 395002, Gujarat, India. | (iv)Mobile No. | 9099069611 | (v)Landline No. | 0261244935 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Apr 2016 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(ii) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised.
(iii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted.
(iv) Submit plan/compliance of Ministry’s office memorandum dated 31st October, 2019 regarding projects located in Critically and Severely Polluted Area. | 05 Dec 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ramnik Patel | Designation | CEO | Name of Company (Applicant Name should not be given here) | DIVINE CHEMICALS | Address | Plot No. 3004/2917, GIDC Estate, Panoli |
|