Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Proposed Onshore Oil and Gas Exploration drilling in OALP Block CB-ONHP-2017/9 Located in Kheda District, Gujarat by M/s Bharat PetroResources Ltd.
(b)Name of the Company / Organisation Bharat PetroResources Ltd.
(c)Registered Address 12th Floor, Maker Tower, F wing, cuffe Parade, Mumbai, Maharashtra,,Mumbai City,Maharashtra-400005
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BIBHOR RANJAN
(b)Designation (Owner/ Partner/ CEO) Assistant Manager assets
(c)Address NIL
(d)Pin code 400005
(e)E-mail ranjan.b@bharatpetroresources.in
(f)STD Code. 22(f)Telephone No. 96191322
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/GJ/IND2/88387/2018
(d)Master Proposal Number(Single Window) SW/124471/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 25,387,122,230
(b)Pincode 387130
(c)Bounded Latitudes (North)
From
Degree 22.42
Minutes
Second
From
Degree 22.55
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.42
Minutes
Second
From
Degree 72.52
Minutes
Second
(e)Survey of India Topo Sheet No. F43G9, F43G13, F43G10, F43G14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 60
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratKhedaMehmedabad
(2.)GujaratKhedaNadiad
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/409/2018-IA-II(I)
(b)Date of Apply of TOR 13 Dec 2018
(c)Date of Issue of TOR / Standard ToR 14 Jan 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :2.5
Primary Teachers Association Building, Behind Aadhar Super Market, Station Road, Mehemdabad, Ta. Mahemdavad, Dist. Kheda, Gujarat
State :Gujarat
District :Kheda
Tehsil :Mehmedabad
Village :Mehemdabad
46EmploymentOthersResident Additional Collector and Additional District Magistrate, Kheda
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Wellpad45 daysFor exploitation of Hydrocarbons
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Drilling of Exploratory wells5Othersno.sOthersNot applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 84
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.68
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 35
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 35
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)High Speed Diesel6Kilo Litre per Daylocal marketRoad2 Open MarketCopy of Linkage
(2.)Water35Kilo Litre per Daytanker supplyRoad2 OthersApproved supplierCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube8.85.18.280
(2.)NOxMicro Gram per Meter Cube17.19.617.080
(3.)PM10Micro Gram per Meter Cube70.543.970.4100
(4.)PM2.5Micro Gram per Meter Cube45.220.243.860
(5.)OthersCOMili Gram per Meter Cube0.20.10.24
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l645752501000
(2.)Fluoridemg/l1.270.111.5
(3.)OthersSulphatemg/l983200400
(4.)pHNA7.927.616.58.5
(5.)TDSmg/l15142175002000
(6.)Total Hardnessmg/l630222200600
(7.)Heavy MetalsLEADmg/l0.010.010.010.01
(8.)TSSmg/l1111
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.427.12C
(2.)BODmg/l8.82.1C
(3.)OthersTDSmg/l292122C
(4.)DOmg/l6.24.5C
(5.)CODmg/l4411C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.438.645
(2.)Leq(Day)A-weighted decibels(dB(A))52.742.455
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare194.3171.2
(2.)Electric ConductivityMillisiemens per Centimetre0.250.13
(3.)P(Phosphorus)Kilogram per hectare12474
(4.)pH7.216.61
(5.)K(Potassium)Kilogram per hectare1723981
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker supply352Copy of Permission LettermodeOthersTanker supplyOthersNot applicablexyz01 Nov 201935
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater44Septik tank and soak pitOthersSoak pit04
(2.)Drilling and rig wash wastewater55Mobile ETPReuse within the Plant & Recycling5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9
(b)Total Discharged Water (Kilolitre per Day) 4
(c)Total Reused Water (Kilolitre per Day) 5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic wasteMunicipal Solid Waste0.03Tons0RoadOtherscompost pit
(2.)Drill cuttingsIndustrial Waste1000Tons0RoadOthersHDPE lined collection pit
(3.)Waste drilling mudIndustrial Waste500Tons0RoadOthersHDPE lined collection pit
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.51.20.02270.53100
(2.)PM2.5Microgram per Meter Cube45.21.10.02245.2360
(3.)SO2Microgram per Meter Cube8.81.30.018.8280
(4.)NOxMicrogram per Meter Cube17.11.10.03217.13380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG (500 KVA)HSD120.42NOx0.162
(2.)DG (250 KVA)HSD120.28NOx0.067
(3.)DG (100 KVA)HSD90.25NOx0.042
(4.)Flaring during well testingNG300.21NOx0.018
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source 3 x 500 KVA DG Sets 1 x 250 KVA DG Sets (Flare) 1
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 x 500 KVA DG Sets 1 x 250 KVA DG Sets (Flare) 1
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 9
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 29000
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 44100
(d)Surface Water Bodies (ha.) 12000
(e)Settlements (ha.) 9500
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : roads, rail etc 22000
    Total (ha.) 116600
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant9
Total (ha.) 9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0Not applicable
(2.)CorridorsNone0Not applicable
(3.)Critically Polluted AreaNone0Not applicable
(4.)WLSNone0Not applicable
(5.)ESAsNone0Not applicable
(6.)ESZsNone0Not applicable
(7.)Wildlife CorridorsNone0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0Not applicable
(2.)ForestNone0Not applicable
(3.)Archaeological SitesNone0Not applicable
(4.)OthersWater bodiesVatrak River0.3From well no. N1 & N2
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 9
(c)Status of Land acquisition if not acquired Land acquisition not started yet
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pea fowl (Pavo cristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1300000
(iii)Period of Implementation 3 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Vatrak River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sedhi River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 40
(e)No. of working days 180
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProject proponent will be organized regular medical check-up camps and recreational activities. Employment to local people will be generated. Overall living standard of nearby people have positive impact
(2.)Financialrevenue
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. EIA report contains 11 chapters in place of 12 chapters. (ii) Accreditation of consultant has been expired. (iii) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised. (iv) As per EIA Report schedule I species reported, however in form 2 No schedule I species mentioned. Please submit details accurately and conservation plan for Schedule I species along with budgetary provisions and its approval from CWLW needs to be provided. 05 Dec 2019
2.NAThe correction have been made as per the instruction received 08 Jan 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBIBHOR RANJAN
DesignationAssistant Manager assets
Name of Company (Applicant Name should not be given here)Bharat PetroResources Ltd.
Address12th Floor, Maker Tower, F wing, cuffe Parade, Mumbai, Maharashtra
Print