Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Modikunta Vagu Irrigation Project
(b)Name of the Company / Organisation IRRIGATION AND CAD TELANGANA
(c)Registered Address Superintending Engineer Office, Irrigation Circle, Nakkalagunta, Hanumakonda, Warangal-506001, Telangana,,Warangal,Telangana-506001
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Superindenting Engineer
(b)Designation (Owner/ Partner/ CEO) SE
(c)Address SE OFFICE, IRRIGATION CIRCLE, NAKKALAGUNTA, HANUMAKONDA, WARANGAL,,Hanamkonda,Warangal,Telangana-506001
(d)Pin code 506001
(e)E-mail modiguntavagulis@gmail.com
(f)STD Code. 8333(f)Telephone No. 3832040
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity1(c) River Valley projects
(b)Category A
(c)Proposal Number IA/TG/RIV/67158/2017
(d)Master Proposal Number(Single Window) SW/124247/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Krishnapuram village, Wazeedu Mandal, Jayashankar
(b)Pincode 506015
(c)Bounded Latitudes (North)
From
Degree 18.546867
Minutes
Second
From
Degree 18.57389
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.26
Minutes
Second
From
Degree 80.39
Minutes
Second
(e)Survey of India Topo Sheet No. 65 B6, B7, B10, B11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 119
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 60
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaKhammamWazeed
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/24/2017-IA-I
(b)Date of Apply of TOR 02 Aug 2017
(c)Date of Issue of TOR / Standard ToR 29 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :13
Govt. Junior College Grounds
State :Telangana
District :Khammam
Tehsil :Wazeed
Village :Wazeed
75The participants suggested to implement the Environmental Management Plan viz. Public health, CAD and compensatory afforestation and supported the project for early implementation of the project.District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)5500Hectare
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)COMMAND AREA5500HectaresOthersCOMMAND AREA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 425.16
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.68
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.37
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10.91
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4978255
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4978255
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Stone / Metal201355Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
(2.)Sand174115Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
(3.)Hard rock966775Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
(4.)Rough stone150560Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
(5.)B C862950Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
(6.)Gravel1976210Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
(7.)Cement61150OthersMetric tonnsHyderabadRoad243 LinkageCopy of Linkage
(8.)Steel9040OthersMetric tonnsHyderabadRoad243 LinkageCopy of Linkage
(9.)All soils576100Cubic Meter per DayHyderabadRoad243 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Aug 2017 To 30 Apr 2018
(b)Season Three-Sesions
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube694761.65100
(2.)SO2Micro Gram per Meter Cube9.185.499.0880
(3.)NOxMicro Gram per Meter Cube25.2818.8624.8380
(4.)PM2.5Micro Gram per Meter Cube241321.8660
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l24022200600
(3.)Fluoridemg/l0.430.0811.5
(4.)Heavy MetalsLeadmg/l0.00700.010.01
(5.)pHNA7.26.386.58.5
(6.)TDSmg/l487605002000
(7.)Chloridesmg/l79.0611.572501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.537.2A
(2.)BODmg/l2.20B
(3.)CODmg/l25.60B
(4.)DOmg/l5.84.7B
    14.4.     No. of Ambient Noise monitoring locations : 2
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))44.1441.6255
(2.)Leq(Night)A-weighted decibels(dB(A))35.634.2245
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.734.92
(2.)Electric ConductivityMillisiemens per Centimetre35721.4
(3.)N(Nitrogen)Kilogram per hectare401.72107.69
(4.)K(Potassium)Milligram per Kilogram718.271.8
(5.)P(Phosphorus)Kilogram per hectare863.43112.39
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 8.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 8.7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface60654.60Copy of Permission LetterCanalOthersEarthern damNo.2/19/2015/AIBP/M&A/HYD/429-3020 Apr 201560654.6
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Wastewater from maintenance office540600Extended aerationReuse within the Plant & Recycling540
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 540
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 540
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal waste from labour campsMunicipal Solid Waste24.82Tons1.5RoadOthersWazeedu Mandal Municipal authority landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube54.850.0428.584100
(2.)PM2.5Microgram per Meter Cube000160
(3.)SO2Microgram per Meter Cube000180
(4.)NOxMicrogram per Meter Cube000180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD50.01SO20.075
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source DG
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 499
(b)Private Land (ha.) 75.99
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 574.99
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8566
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3261
(e)Settlements (ha.) 520
(f)Industrial (ha.) 0
(g)Forest (ha.) 22090
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : no other land 0
    Total (ha.) 34437
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersnil0
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL0nil
(2.)ESAsNIL0nil
(3.)CorridorsNIL0nil
(4.)WLSEturnagaram7.5No forest land required for the project
(5.)ESZsEturnagaram6No forest land required for the project
(6.)NPANIL0nil
(7.)Wildlife CorridorsNIL0nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnil0nil
(2.)ForestETURNAGARAM WLS7.5No forest land is required for the project
(3.)Archaeological Sitesnil0nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 912
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 45.46
(b)Land yet to be acquired(Ha) 30.53
(c)Status of Land acquisition if not acquired Compensation of 1.09 crores has been paid as per L
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Common buzzard, Common pierrot, Gaur, Indian Wolf, Leopard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 500000
(iii)Period of Implementation 3 years during operation phase
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Modikunta vagu and Godavari
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required 2.142 TMC
(ii)Details of Study Conducted Hydrology studies
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. No.2/19/2015/AIBP/M&A/HYD/429-30
(iii)Date of issue 20 Apr 2015
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 730
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 499
(b)Percentage of Total Project Area 86.78
(c)No. of Plants to be Planted 6205
(d)Funds Allocated for Plantation 1551250
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment generation for local villagers
(2.)Environmental• Agro-forestry shall be taken up in the command area and it improves the ecosystem services in the region
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Modikuntavagu
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam44.3151359427.805500550055005500
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Underground
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %16552015
(2.)75 %24822015
(3.)90 %33322015
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 491511
(c) Utilized for Construction (in cubic meter)491511
(d) No. of Muck Disposal sites5
(e) Total Muck Disposal Area (in hectare)0
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 38
(c) Name of the umbrella Fish Species (Scientific Name)Cyprinus carpio
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Monsoon0.0011076597.2
(2.)Lean0.0011076597.2
(3.)Non-Lean Non-Monsoon0.000031952.80
11. Free Flow Stretch (in km) 9.36
12.
Approval of Central Water Commission Yes
(a)Approval Reference No. No.2/19/2015/AIBP/M&A/HYD/429-30
(a)Date of Approval 20 Apr 2015
(a)Copy of Approval Copy of approval
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0107
(ii)Name of the EIA Consultant ENVIRONMENTAL HEALTH AND SAFETY CONSULTANTS PRIVAT
(iii)Address No. 174, New No. 13/2 14th E CROSS INDUSTRIAL TOWN AGRAHARA DASARAHALLI BANGALORE
(iv)Mobile No. 9886599677
(v)Landline No. 0802301620
(vi)Email Id ehscblr1974@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 22 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1 While opening .kml file submitted with form 2 is "showing not valid". Submit the proper kml having polygonal feature. 2. PH issues to be addressed in the appropriate chapter along with the point wise compliance of issue raised. 3. QCI NABET certificate of the consultant to be submitted for the period of collection of base line data. 4. Concurrence of CWC on water availability 29 Nov 2019
2.NAThe correction have been made as per the instruction received 16 Dec 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

The EAC in the present meeting deliberated on the information submitted by the PP (EIA/EMP report, Form 2, Public hearing issues etc.). EAC after detailed deliberation deferred the proposal for want of following information:

 