(a)Name of the project(s) Capacity enhancement of Mahaparbat (Unchabali) Iron Ore Mine
(b)Name of the Company / Organisation ODISHA MINING CORPORATION LIMITED
(c)Registered Address Odisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar,,Khordha,Orissa-751001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Suman Krishna Sit
(b)Designation (Owner/ Partner/ CEO) GENERAL MANAGER (GEO)
(c)Address Odisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar - 751 001, Dist.: Khurda, Odisha,,,Khordha,Orissa-751001
(d)Pin code 751001
(e)E-mail envcl.omc@gmail.com
(f)STD Code. 674(f)Telephone No. 2377458
(g)Fax No. 06742377458
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category B1
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry ToR issued by MoEFCC
(c)Proposal Number IA/OR/MIN/9515/2007
(d)Master Proposal Number(Single Window) SW/123668/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata No. 169 (Rakhit), Plot No. 639, Kissam Basti
(b)Pincode 758035
(c)Bounded Latitudes (North)
From
Degree 21.52.42.54705
Minutes
Second
From
Degree 21.53.23.54719
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.25.05.66779
Minutes
Second
From
Degree 85.25.36.49480
Minutes
Second
(e)Survey of India Topo Sheet No. F45N5 (Old toposheet no. 73G/5)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 610
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.17
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/779/2007-I.A II (M)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 29 Jun 2007
(c)Date of Issue of EC 16 Jan 2009
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Unchabali village
State :Orissa
District :Kendujhar
Tehsil :Joda
Village :Unchabali
447Employment, Education, HealthOthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-322/07/EPE 10.09.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 29 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Mining of Iron Ore0.070.931OthersMillion Tons per Annum (MTPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Nil000Nil
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 29 Dec 2015
(iv)Valid Upto 31 Mar 2018
(v)File No. 20384/Ind-I-CON-6334
(vi)Application No. 20384/Ind-I-CON-6334
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.063
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.58
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)EXPLOSIVE145OtherskgCaptiveRoad11 CaptiveCopy of Linkage
(2.)HSD3Kilo Litre per DayCaptiveRoad40 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube935575.6100
(2.)PM2.5Micro Gram per Meter Cube582842.560
(3.)SO2Micro Gram per Meter Cube284.011.7580
(4.)NOxMicro Gram per Meter Cube331019.2580
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.566.58.5
(2.)TDSmg/l363455002000
(3.)Chloridesmg/l34.767.722501000
(4.)Fluoridemg/l0.3430.2191.01.5
(5.)Heavy MetalsMercury (as Hg)mg/l0.00050.00050.0010.001
(6.)TSSmg/l0000
(7.)Total Hardnessmg/l24428200600
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l31B
(2.)CODmg/l00A
(3.)pHNA7.527.39A
(4.)DOmg/l76A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))54.139.170
(2.)Leq(Day)A-weighted decibels(dB(A))71.241.975
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.535.38
(2.)Electric ConductivityMillisiemens per Centimetre32971
(3.)P(Phosphorus)Kilogram per hectare3.40.1
(4.)K(Potassium)Kilogram per hectare269123
(5.)N(Nitrogen)Kilogram per hectare564100
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 14
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface900Copy of Permission LetterPipelineOthersPipeline7883/WR04 Sep 201956
(2.)GroundWater250Copy of Permission LetterPipelineOthersPipeline7897/WR04 Sep 20199.78
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Discharge4040RecycleReuse within the Plant & Recycling,Green Belt Renewal Plant40
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 40
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 40
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mine WasteOthersMine Overburden waste1Tons0RoadOthersBackfilled to mine void
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube00010
(2.)PM10Microgram per Meter Cube92012105100
(3.)SO2Microgram per Meter Cube00010
(4.)NOxMicrogram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Nil000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0.5
(b)Source NESCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 68
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 68
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 68
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 68
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area50.399
(2.)Safety Zone14.178
(3.)OthersRoad and Top soil storage3.423
Total (ha.) 68
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None
(2.)ESZsNone0None
(3.)Wildlife CorridorsNone0No corridor. However, movement of elephant has been reported in the study area.
(4.)CorridorsNone0None
(5.)WLSNone0None
(6.)NPANone0None
(7.)ESAsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPF0Entire ML Forest land
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Village Forest
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1871
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian elephant, Sloth Bear, Monitor Lizard, Python, Pea cock
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 3.20 crore
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 7364/1WL-FC-Mines-SSP-95/2018
(iii)Date of issue 04 Sep 2019
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Surface Nala
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Baitarani River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 270
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 270
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.10012.07814.177999999999999
(2.)Percentage of Total Project Area31821
(3.)No. of Plants32001970622906
(4.)Funds Allocated000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue generation.
(2.)SocialSocio-economic development through CER and CSR activities
(3.)EnvironmentalNo water discharge.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron OreMajor
2.
Mine Capacity in ROM (Run of Mine) 1.0 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MS/FM/34-ORI/BHU/2017-18
(b)Date of Approval 27 Dec 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 68
(f)Approved Capacity 1.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 10.56
(b)Mineable Reserves (Million Ton) 7.56
(c)Extractable Reserves(Million Ton) 7.56
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral Cut off 45%
(f)Stripping Ratio 1 : 0.6
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 36
(i)Mining Method Opencast
(j)Life of Mine (Years) 8
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1200 Mobile crusher (Dry crushing and Screening)
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 68
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease already executed
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 68
(iii)Validity of the lease deed From : 11 Jun 2003 To : 08 Jun 2058
(iv)Date of Execution of Mining Lese 09 Jun 2008
(v)Reference Number 4998/SM dtd 27.06.2018
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Initial 01 Jan 1900 From : 09 Jun 2008 To : 08 Jun 2058 Copy of Earlier Lease4998/SM dtd 27.06.2018 68
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 60
(iv)Quantity (in Million Cubic meter) 3.3184
(v)No. of year back fill up 1
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.00511
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.0051
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 50.399
(b)Depth (in meter) 33
(c)Volume (in Million Cubic meter) 6.38
12.
Details of Quarry:
(a)Final Void of 50.399 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 50.399
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper/Truck
(b)Surface to Siding/Loading Dumper/Truck
(c)Transportation / Conveyor Details Dumper/Truck
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)WASTE LAND000
(3.)GRAZING LAND000
(4.)SETTLEMENTS000
(5.)OTHERS(Specify)Nil000
(6.)SURFACE WATER BODIES000
(7.)FOREST LAND68068
TOTAL68068
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS0.238000.238
(2.)TOP SOIL STORAGE3.185003.185
(3.)EXTERNAL OB DUMPS0000
(4.)BUILT UP AREA (COLONY/OFFICE)0000
(5.)GREEN BELT14.1780014.178
(6.)EXCAVATION/QUARRY50.3990050.399
(7.)INTERNAL OB DUMPS0000
(8.)VIRGIN AREA0000
(9.)OtherNil0000
TOTAL6800068
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 50.399
(d)Safety Zone(in hectare) 14.178
(e)Final Void of 50.399 (hectare) at a Depth of 33 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1600
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 3.185
(h)Total afforestation plant (in hectare) 67.762
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 0
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20180.070.070.0700
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0068
(ii)Name of the EIA Consultant MECON Limited
(iii)Address MECON Limited Vivekananda Path PO. Doranda, Dist – Ranchi, Jharkhand – 834002
(iv)Mobile No. 9470193793
(v)Landline No. 6512483247
(vi)Email Id envenggranchi@meconlimited.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 30 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP submitted that it is a category B project and it does not attract general conditions. The ToR has been granted by MoEFCC, however, as per the EIA Notification S. O. 3977 (E) dated 14.08.2018, the proposal is a Category B project (less than 100 ha) and it will be appraised at SEIAA level. 10 Dec 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSuman Krishna Sit
DesignationGENERAL MANAGER (GEO)
Name of Company (Applicant Name should not be given here)ODISHA MINING CORPORATION LIMITED
AddressOdisha Mining Corporation Limited OMC House, Post Box No.: 34, Bhubaneswar
Print