Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Common Hazardous Waste Incinerator & Other Waste Treatment Facility
(b)Name of the Company / Organisation M/S SHEETALA WASTE MANAGEMENT
(c)Registered Address 78/2, GAUR PLAZA, MAIN G.T. ROAD, LAL KAUN, GAUTAM BAUDH NAGAR U.P-201002,,Gautam Buddha Nagar,Uttar Pradesh-201002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant NISHANK KAUSHIK
(b)Designation (Owner/ Partner/ CEO) PARTNER
(c)Address 78/2, GAUR PLAZA, MAIN G.T. ROAD, LAL KAUN, GAUTAM BAUDH NAGAR UP-201002,,Gautam Buddha Nagar,Gautam Buddha Nagar,Uttar Pradesh-201002
(d)Pin code 201002
(e)E-mail sheetalawaste1@gmail.com
(f)STD Code. 11(f)Telephone No. 27571410
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/MIS/85302/2018
(d)Master Proposal Number(Single Window) SW/123555/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. D-26
(b)Pincode 203001
(c)Bounded Latitudes (North)
From
Degree 282759.54
Minutes
Second
From
Degree 282802.77
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 773946.36
Minutes
Second
From
Degree 773950.17
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 206
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.3
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandChatraTandwaKhumarang Khurd Khumarang Kalan Ursu Binglat Honhe
(2.)JharkhandHazaribagBarkagaonUrimari
(3.)OrissaSundargarhKoidaGhoraburhani, Sagasahi, Kalamang
(4.)Uttar PradeshBulandshahrSikandrabad
(5.)GujaratDevbhumi DwarkaKalyanpurMewasa
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-84/2018-IA-III
(c)Date of Apply of TOR 13 Nov 2018
(d)Date of Issue of TOR / Standard ToR 18 Dec 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is coming up in notified industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Hazardous waste incinerator10 MT/day
(2.)recycling/reconditioning of discarded containers10 MT/day
(3.)E-waste dismantling & segregation10 MT/day
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hazardous waste incinerator3000Tons per AnnumRoad
(2.)recycling/reconditioning of discarded containers3000Tons per AnnumRoad
(3.)E-waste dismantling & segregation3000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Dec 2018
(iv)Valid Upto 18 Dec 2021
(v)File No. 10-84/2018-IA-III
(vi)Application No. IA/UP/MIS/85302/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.3245
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.04
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.04
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 30
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 30
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Hazardous waste, E-waste, discarded containers9000Tons per AnnumNearby industriesRoad150 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube269.5132.5192.8100
(2.)SO2Micro Gram per Meter Cube18.25.41280
(3.)NOxMicro Gram per Meter Cube42.110.625.180
(4.)PM2.5Micro Gram per Meter Cube162.34259.560
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy Metalsarsenicmg/l0000.05
(2.)pHNA7.987.226.58.5
(3.)TSSmg/l0000
(4.)TDSmg/l5364235002000
(5.)Total Hardnessmg/l298.8236.6300600
(6.)Chloridesmg/l96.568.52501000
(7.)Fluoridemg/l0.940.550.61.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l43.66.2E
(2.)pHmg/l8.227.58A
(3.)DOmg/l3.61.1E
(4.)CODmg/l126.516.5E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.450.865
(2.)Leq(Night)A-weighted decibels(dB(A))38.833.355
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.586.54
(2.)N(Nitrogen)Kilogram per hectare185.2109
(3.)K(Potassium)Kilogram per hectare257.2122.5
(4.)Electric ConductivityMillisiemens per Centimetre416269
(5.)P(Phosphorus)Kilogram per hectare59.836.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherstanker supply410Copy of Permission LettermodeOthersroadOtherstanker supplySWMP/27 May 20194
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)effluent3.57MBBR based ETPReuse within the Plant & Recycling3.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bottom AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons200RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Domestic wasteMunicipal Solid Waste2.2Tons10RoadOthersMunicipal Corporation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0.10.10.00.260
(2.)SO2Microgram per Meter Cube11.10.12.91580
(3.)PM10Microgram per Meter Cube256.70.17.6264.4100
(4.)NOxMicrogram per Meter Cube280.116.5344.5480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorHSD/LDO300.4PM104.27 E-01 kg/mg
(2.)DG SetHSD3.50.12PM100.3 g/KW-h
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 111.11
(b)Source UPPCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 420 kVA (3*125 kVA + 3*15 kVA)
(e)Stack Height (in m) 3.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.1857
    Total Land (ha.) 0.1857
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.1857
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : industrial land 0.1857
    Total (ha.) 0.3714
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTSDF0.1857
Total (ha.) 0.1857
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0none in 10 km radius
(2.)CorridorsNone0none in 10 km radius
(3.)WLSNone0none in 10 km radius
(4.)Wildlife CorridorsNone0none in 10 km radius
(5.)Critically Polluted AreaNone0none in 10 km radius
(6.)NPANone0none in 10 km radius
(7.)ESZsNone0none in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0none in 10 km radius
(2.)Archaeological SitesNone0none in 10 km radius
(3.)Defence InstallationsNone0none in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 1.0 Lac/-
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area sikandrabad Distributory
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 35
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.061281
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 142000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe proposed project will cater to the need of the hazardous waste generating industries by providing an environmentally sound hazardous waste incineration facility in the area.
(2.)SocialThe growth in industrialization due to availability of safe treatment & disposal system is envisaged to generate additional employment opportunities. Also, the proposed project is envisaged to improve socio-economic conditions through CER activities in nearby villages
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 1857
(e)Total built up area (sqm) 737
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 12
(c)No. of Recharge Pits 1
(d)Capacity 3
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 15
5.
Energy Saving Measures:
(a)Source/Mode Energy efficient Lighting
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No adverse impact envisaged on water bodies and dr
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026(Rev.01)
(ii)Name of the EIA Consultant Gaurang Environmental Solutions Pvt. Ltd.
(iii)Address 102, SNG Shree Ratna Apartments, Near Tambi Petrol Pump, Jhotwara Road, Banipark, Jaipur (302016)
(iv)Mobile No. 9782074776
(v)Landline No. 1414029115
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 22 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per online requested by PP vide letter dated 24.10.2019 for withdraw the proposal no. IA/UP/MIS/85302/2018. In this regard the competent authority has approved for with draw the same proposal vide file no. 10-84/2018-IA-III dated 11.11.2019, now the proposal withdraw from the portal. 14 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNISHANK KAUSHIK
DesignationPARTNER
Name of Company (Applicant Name should not be given here)M/S SHEETALA WASTE MANAGEMENT
Address78/2, GAUR PLAZA, MAIN G.T. ROAD, LAL KAUN, GAUTAM BAUDH NAGAR U.P-201002
Print