Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance for the Proposed Mandal Becharji Special Investment Region(MBSIR), at near Villages Mandal and Becharaji, Dist. Ahmedabad and Mehsana(for cluster –A), Gujarat by Mandal Becha
(b)Name of the Company / Organisation GUJARAT INDUSTRIAL CORRIDOR CORPORATION
(c)Registered Address 6th Floor, Block 1-2, Udyog Bhavan, Sector 11, GH 4 Circle, Gandhinagar, Gujarat,,Gandhinagar,Gujarat-382016
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jai Prakash Prakash Shivahare
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address M/s Mandal Becharaji Special Investment Region Development Authority (MBSIRDA) Block No. 1-2, 3rd Floor, Udyog Bhavan, Gandhinagar-382017,,Gandhinagar,Gandhinagar,Gujarat-382017
(d)Pin code 382017
(e)E-mail mbsir.env@gmail.com
(f)STD Code. 79(f)Telephone No. 23226015
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/NCP/75764/2018
(d)Master Proposal Number(Single Window) SW/123446/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Refer Annexure-II of EIA report
(b)Pincode 382130
(c)Bounded Latitudes (North)
From
Degree 23.25
Minutes
Second
From
Degree 23.30
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.1
Minutes
Second
From
Degree 72.1
Minutes
Second
(e)Survey of India Topo Sheet No. F42F14,F43A2,F43A3,F42F15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 38
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMahesanaBecharaji
(2.)GujaratAhmedabadMandal
(3.)JharkhandChatraTandwaKhumarang Khurd Khumarang Kalan Ursu Binglat Honhe
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-75/2018-IA.III
(c)Date of Apply of TOR 04 Oct 2018
(d)Date of Issue of TOR / Standard ToR 08 Feb 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :3
91
State :Gujarat
District :Mahesana
Tehsil :Becharaji
Village :chandanki
91tree re-plantationDistrict Collector
(2.)
Date of Advertisement :23 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :4
at community hall,thakor vas, vill: sitapur,Ta:Mandal,Dist: Ahmedabad,Gujarat
State :Gujarat
District :Ahmedabad
Tehsil :Mandal
Village :sitapur
108disposal of waste water,technology for CETP and STPOthersadditional collector & additional district magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Project area for cluster A5060Industrial ,residensial
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Establishment of SIR5060HectaresOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7231
(b) Funds Allocated for Environment Management (Capital) (in Crores) 208.72
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 36
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube63.834.850.8100
(2.)SO2Micro Gram per Meter Cube9.565.017.1480
(3.)PM2.5Micro Gram per Meter Cube35.91725.960
(4.)NOxMicro Gram per Meter Cube18.68.814.3580
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.944.476.58.5
(2.)TDSmg/l13502175002000
(3.)Total Hardnessmg/l396140200600
(4.)Fluoridemg/l1.220.11.01.5
(5.)TSSmg/l0000
(6.)Chloridesmg/l540552501000
(7.)Heavy Metalsleadmg/l000.010.01
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.15.3C
(2.)CODmg/l2410.8C
(3.)pHNA7.427.14C
(4.)BODmg/l3.82.2C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.447.175
(2.)Leq(Night)A-weighted decibels(dB(A))44.841.770
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.057.18
(2.)N(Nitrogen)Kilogram per hectare740284
(3.)P(Phosphorus)Kilogram per hectare71.719.6
(4.)Electric ConductivityMillisiemens per Centimetre0.2870.071
(5.)K(Potassium)Kilogram per hectare625310
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.28 To 22.58
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.06 To 16.52
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface18516 Not Appliacble PipelineJack Well024 Oct 2019269
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Residential7650077000STPReuse within the Plant & Recycling76500
(2.)Industrial3360034000CETPReuse within the Plant & Recycling33600
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 110100
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 110100
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Commercial wasteOtherscommercial waste4738.43Tons45RoadSanitary Landfills
(2.)STP sludgeOthersSTP sludge76.65Tons0Otherson siteOthersUsed as Manure for plantation
(3.)Residential wasteMunicipal Solid Waste54346.31Tons45RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube0.310.50.961.82
(2.)PM2.5Microgram per Meter Cube0000.000000000160
(3.)NOxMicrogram per Meter Cube18.60.51.12080
(4.)SO2Microgram per Meter Cube0000.00000000010
(5.)PM10Microgram per Meter Cube63.80.50.0563.85100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Nil000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 526610
(b)Source GETCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Details are given in table 4.6 of chapter 4 of EIA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 5060
    Total Land (ha.) 5060
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 148.1
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrial ,commercial 4911.9
    Total (ha.) 5060
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersIndustrial,commercial5060
Total (ha.) 5060
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NIL
(2.)ESZsNA0NIL
(3.)Wildlife CorridorsNA0NIL
(4.)Critically Polluted AreaNA0NIL
(5.)ESAsNA0NIL
(6.)CorridorsNA0NIL
(7.)NPANA0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNIL0NIL
(2.)Archaeological SitesNIL0NIL
(3.)Defence InstallationsNIL0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 8000
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5060
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land acquisition is done based on the Town Plannin
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pea fowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rupen river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 124800
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 179000
(e)No. of working days 360
(f)Total Manpower 304500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1012
(b)Percentage of Total Project Area 20.00
(c)No. of Plants to be Planted 40000
(d)Funds Allocated for Plantation 6675000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirect employment generation,Indirect jobs creation
(2.)FinancialIncreased investments in the region
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 50.60
(e)Total built up area (sqm) 50.60
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 0
5.
Energy Saving Measures:
(a)Source/Mode LED lights, solar lighting
(b)Percentage 10
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area 0
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
(1.)Green category (automobile industry)9B
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno lab India Pvt.Ltd
(iii)Address ABC TOWER #400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098 Land Mark: Near National Productivity Council
(iv)Mobile No. 9940304000
(v)Landline No. 0442625779
(vi)Email Id mumbai@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. EIA/EMP report is not prepared as per TOR issued for this project (Separate reports for Cluster A and Cluster B). 2. EIA?EMP report does not follow the Generic Structure as per EIA Notifiaction, 2006 as amended from time. 3. Please provide CER details as per Ministry's OM dated 1.5.2018. 4. Public Hearing issues raised and commitment by proponent along with the fund provisions and time bound action plan to be submitted. 04 Nov 2019
2.NAThe correction have been made as per the instruction received 16 Nov 2019
3.NAPlease submit following documents/information: 1. As per certificate of accreditation by EIA Consultant, M/s ABC Techno Labs India Private Limited, Chennai, they are eligible for category B projects under item no. 7(c) of EIA Schedule as per QCI/NABET guidelines. However, this project belongs to Category A project. In view of this, please furnish explanation. Also submit an undertaking that EIA Coordinator and other Function Area Experts belong to A Category and have prepared EIA/EMP report of this project, which is Category A project under item no. 7(c) of schedule under EIA Notification, 2006 as amended from time to time. 2. Since, one TOR was issued for this project including Clusters A and Cluster B, only one application for EC to be submitted having both EIA/EMP reports (for Cluster A and Cluster B). Withdraw both proposals and submit fresh application with EIA/EMP reports of both the clusters. 18 Nov 2019
4.NAThe correction have been made as per the instruction received 21 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJai Prakash Prakash Shivahare
DesignationCEO
Name of Company (Applicant Name should not be given here)GUJARAT INDUSTRIAL CORRIDOR CORPORATION
Address6th Floor, Block 1-2, Udyog Bhavan, Sector 11, GH 4 Circle, Gandhinagar, Gujarat
Print