Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) SONADIH LIMESTONE MINE (ML-1) ; 5.5 MTPA LIMESTONE PRODUCTION ;NUVOCO VISTAS CORPORATION LTD
(b)Name of the Company / Organisation NUVOCO VISTAS CORP. LTD. SONADIH UNIT
(c)Registered Address Nuvoco Vistas Corp. Ltd. (formerly Lafarge India Limited) SONADIH CEMENT PLANT, P.O Raseda, Dist. Balodabazar - Bhatapara, Chhattisgarh,,Balodabazar,Chhattisgarh-493332
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinay Kale
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address Nuvoco Vistas Corp. Ltd. SONADIH CEMENT PLANT, P.O Raseda, Dist. Balodabazar - Bhatapara, Chhattisgarh - 493 332,,Baloda Bazar,Raipur,Chhattisgarh-493332
(d)Pin code 493332
(e)E-mail vinay.kale@nuvoco.in
(f)STD Code. 7727(f)Telephone No. 272224
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/MIN/72229/2016
(d)Master Proposal Number(Single Window) SW/123422/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 376, 432, 433, 441, 415, 416, 419, 420, 421, 425 E
(b)Pincode 493332
(c)Bounded Latitudes (North)
From
Degree 2402239.48
Minutes
Second
From
Degree 2405641.92
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 622102.49
Minutes
Second
From
Degree 624662.11
Minutes
Second
(e)Survey of India Topo Sheet No. 64 K/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 250
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.40
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)JharkhandChatraTandwaUrshu Binglat Kumarang Kalan Kumarang Khurd Honne
(2.)JharkhandHazaribagBarkagaonUrimari
(3.)ChhattisgarhBalodabazarBaloda Bazar
(4.)ChhattisgarhBalodabazarBaloda Bazar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/184/2016-IA.II(M)
(b)Date of Apply of TOR 23 Aug 2016
(c)Date of Issue of TOR / Standard ToR 16 Dec 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Apr 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 May 2018
Distance of Public Hearing Venue from the Proposed Project :0
Mine Site
State :Chhattisgarh
District :Balodabazar
Tehsil :Baloda Bazar
Village :Sonadih Dhabadih Raseda Keshdabri
500Employment, Laying of Roads, Education, Bus facility and Hospital facilityDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Limestone MiningOpencast mining-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limestone5.5OthersMTPARoad,Conveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.51
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.48
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ANFO & Booster990000OtherskglocalRoad150 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Dec 2016 To 25 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube26.318.12660
(2.)NOxMicro Gram per Meter Cube14.89.114.880
(3.)PM10Micro Gram per Meter Cube56.641.256.2100
(4.)SO2Micro Gram per Meter Cube13.98.013.580
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA7.26.66.58.5
(2.)TSSNA0000
(3.)Chloridesmg/l273162501000
(4.)Fluoridemg/l1.270.531.01.5
(5.)TDSmg/l11842625002000
(6.)Total Hardnessmg/l593154200600
(7.)Heavy MetalsZincmg/l0.020.02515
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.97.7A
(2.)DOmg/l5.54.2A
(3.)BODmg/l52A
(4.)CODmg/l83A
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.146.455
(2.)Leq(Night)A-weighted decibels(dB(A))42.040.345
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare2807
(2.)Electric ConductivityMillisiemens per Centimetremicro siemens/cm0.5460.084
(3.)N(Nitrogen)Kilogram per hectare537190
(4.)K(Potassium)Kilogram per hectare1333250
(5.)pH7.36.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 35 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1002 Not Appliacble PipelineIntake WellAgreement with Water Resources Department22 Oct 20104800
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic810Septic TankOthersSoak Pit08
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8
(b)Total Discharged Water (Kilolitre per Day) 8
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OBandwasteIndustrial Waste325000Tons0.5RoadOthersUtilised for greenbelt , dump and backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube13.50.54.818.480
(2.)PM10Microgram per Meter Cube56.20.5015.271.6100
(3.)PM2.5Microgram per Meter Cube260.401.627.760
(4.)NOxMicrogram per Meter Cube14.80.510.625.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)None-00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500 kVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 277.025
(c)Government Land (ha.) 17.135
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 294.160
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 277.025
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 17.135
    Total (ha.) 294.15999999999997
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area176.98Mine pit
(2.)Green belt80.00At Conceptual Stage
(3.)OB Dump Area13.030
(4.)Othersundisturbed and other areas24.15
Total (ha.) 294.16
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0Not Applicable
(2.)NPANone0Not Applicable
(3.)CorridorsNone0Not Applicable
(4.)Wildlife CorridorsNone0Not Applicable
(5.)WLSNone0Not Applicable
(6.)ESZsNone0Not Applicable
(7.)ESAsNone0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0Not Applicable
(2.)Archaeological SitesNone0Not Applicable
(3.)ForestMohtara RF0.6South of ML boundary
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 200
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 130
(b)Land yet to be acquired(Ha) 147
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 4
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 100
(e)Funds Allocated for R&R(in INR) (in Lacs) 100
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock and Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs 180 Lakhs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. kramank/va.Pra/Prabandh-449/2019/3623
(iii)Date of issue 26 Jun 2019
(iv)Recommendation Approved
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Shivnath
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.90
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 113
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 113
32.
Green Belt in Ha:
(a)Total Area of Green Belt 80
(b)Percentage of Total Project Area 27.20
(c)No. of Plants to be Planted 160000
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirect Employment to 113 Persons
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 5.5 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. RPR-1309/02/2017-MINING PLAN VOL I II/192
(b)Date of Approval 09 May 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 294.160
(f)Approved Capacity 5.4962
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 156.79
(b)Mineable Reserves (Million Ton) 97.26
(c)Extractable Reserves(Million Ton) 97.26
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral Cement Grade
(f)Stripping Ratio 1 : 0.06
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 2-5
(i)Mining Method Opencast
(j)Life of Mine (Years) 18
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 294.160
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 15 Jun 2016
(iii)Validity of LOI 50
(iv)Reference No. of LOI 3-44/2010/12
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Mining lease yet to be executed
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Mining lease yet to be executed
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 11
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 13.03
(iii)Height (in meter) 17
(iv)Quantity (in Million Cubic meter) 3.32
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.88
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.2
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.68
11.
Details of Final Mine Void:
(a)Area (in Hectare) 176.98
(b)Depth (in meter) 30
(c)Volume (in Million Cubic meter) 49.55
12.
Details of Quarry:
(a)Final Void of 176.98 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 176.98
13.
Details of Transportation:
(a)In Pit/Underground to Surface 1.0
(b)Surface to Siding/Loading 3.0
(c)Transportation / Conveyor Details upto crusher by road and after conveyor
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)OTHERS(Specify)Out crop17.135017.135
(2.)FOREST LAND000
(3.)WASTE LAND000
(4.)AGRICULTURE LAND277.0250277.025
(5.)SETTLEMENTS000
(6.)GRAZING LAND000
(7.)SURFACE WATER BODIES000
TOTAL294.160294.16
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT800080
(2.)TOP SOIL STORAGE0000
(3.)EXCAVATION/QUARRY16.83160.150176.98
(4.)BUILT UP AREA (COLONY/OFFICE)000.100.1
(5.)ROADS002.32.3
(6.)EXTERNAL OB DUMPS0000
(7.)VIRGIN AREA0021.7521.75
(8.)INTERNAL OB DUMPS13.030013.03
TOTAL109.86160.1524.150294.16
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 13.030
(c)Quarry(in hectare) 176.98
(d)Safety Zone(in hectare) 80.00
(e)Final Void of 160.15 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 21.75
(h)Total afforestation plant (in hectare) 80
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA064
(ii)Name of the EIA Consultant B. S. Envi-Tech Pvt. Ltd.
(iii)Address B. S. Envi-Tech Pvt Ltd., ?'Amity Ville' 12-13-1270/71/73, 4th Floor, St. Ann's School Road, Tarnaka, Secunderabad - 500 017 TELANGANA
(iv)Mobile No. 9848053012
(v)Landline No. 0404978306
(vi)Email Id info@bsenvitech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 12 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. The TOR issued to M/s. Lafarge India Private Limited on 16.12.2016 but EC application submitted in the name of M/s. NUVOCO VISTAS CORP. LTD. SONADIH UNIT. PP needs to clarify the same. 2.Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. 3. Authenticated English translated copy of LOI/Lease document. 4. All documents are submitted in the name of M/s. NUVOCO VISTAS CORP. LTD. PP needs to clarify the same. 10 Dec 2019
2.NAThe correction have been made as per the instruction received 19 Dec 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinay Kale
DesignationAGM
Name of Company (Applicant Name should not be given here)NUVOCO VISTAS CORP. LTD. SONADIH UNIT
AddressNuvoco Vistas Corp. Ltd. (formerly Lafarge India Limited) SONADIH CEMENT PLANT, P.O Raseda, Dist. Balodabazar - Bhatapara, Chhattisgarh
Print