Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Amrapali OCP
(b)Name of the Company / Organisation Central Coalfields Limited
(c)Registered Address DARBHANGA HOUSE, CCL, RANCHI,,Ranchi,Jharkhand-834029
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Devendra Prasad
(b)Designation (Owner/ Partner/ CEO) PO
(c)Address Office of Project officer, Amrapali , P.O.- Saradhu, PS- Tandwa, DIst- Chatra,,,Chatra,Jharkhand-825321
(d)Pin code 825321
(e)E-mail poamrapaliccl@gmail.com
(f)STD Code. 6531(f)Telephone No. 236004
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/JH/CMIN/123390/2019
(d)Master Proposal Number(Single Window) SW/123389/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. The block is covered by Survey of India Topo Sheet
(b)Pincode 825321
(c)Bounded Latitudes (North)
From
Degree 23.859722
Minutes
Second
From
Degree 23.977222
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 84.981944
Minutes
Second
From
Degree 85.035277
Minutes
Second
(e)Survey of India Topo Sheet No. 73-A/13 & special sheet no: 12 & 13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 501
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-80/05/EPE2596
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 19 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Capacity124.816.8OthersMTPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Project Area619.87 Ha619.87 Ha619.87 HaNo change in project area
(2.)Mineable reserve114.59 Mte114.59 Mte114.59 MteNo change in reserve
(3.)Quarry Area425.22 Ha425.22 Ha425.22 HaNo change in quarry area
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Jun 2019
(iv)Valid Upto 30 Jun 2020
(v)File No. JSPCB/HO/RNC/CTO-5076029/2019/1230
(vi)Application No. 5076029
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 858.11
(b) Funds Allocated for Environment Management (Capital) (in Crores) 89
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.29
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Explosives4439765Otherskg/annumAuthorised supplierRoad5 OthersAuthorised supplierCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 7.10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.95 To 6.50
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/328/JH/MIN/2018
(f)Date of Issue 29 Dec 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMine Discharge33570.8 Not Appliacble PipelineOthersMine Pump21-4/328/JH/MIN/201829 Dec 20183357
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic336336STP Proposed as the colony has not been constructedReuse within the Plant & Recycling336
(2.)Industrial9696Oil & Grease Trap with Sedimentation PondReuse within the Plant & Recycling96
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 432
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 432
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersOverburden18200000Tons0.6RoadOthersBackfilling of Quarry
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube363.2137.160
(2.)SO2Microgram per Meter Cube32.20133.380
(3.)NOxMicrogram per Meter Cube44.83.214680
(4.)PM10Microgram per Meter Cube187073261300
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50000
(b)Source Piparwar 33 KV Switch Station of CCL.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 531.64
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 88.23
(e)Other Land (ha.) 0
    Total Land (ha.) 619.87
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 317.43
(b)Waste/Barren Land (ha.) 220.20
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 20.91
(e)Settlements (ha.) 20.67
(f)Industrial (ha.) 0
(g)Forest (ha.) 448.89
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining Land 271.90
    Total (ha.) 1300
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area425.22
(2.)OB Dump Area89.16
(3.)Safety Zone18.92
(4.)Built Up Area26.75Workshop CHP Sub station office
(5.)OthersHaul road nallah diversion & embankment etc59.82Haul road nallah diversion & embankment etc
Total (ha.) 619.87
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0There are no such protected areas within 10 KM of the Project.
(2.)ESZsNa0There are no such protected areas within 10 KM of the Project.
(3.)Wildlife CorridorsNa0There are no such protected areas within 10 KM of the Project.
(4.)CorridorsNA0There are no such protected areas within 10 KM of the Project.
(5.)Critically Polluted AreaNA0There are no such protected areas within 10 KM of the Project.
(6.)NPANA0There are no such protected areas within 10 KM of the Project.
(7.)ESAsNA0There are no such protected areas within 10 KM of the Project.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0There are no such protected areas within 10 KM of the Project.
(2.)ForestNa0In the buffer zone banalat protected forest, manata protected forest and several other small patches of protected forest falls
(3.)Defence InstallationsNA0There are no such areas within 10 KM of the Project.
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 619.87
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 5
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species According to Fauna Study conducted by St. Xavier's College Reasearch Centre, Ranchi Schedule-I species reported were Python, Baaz, Kite and Peacock.
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 305 lakhs
(iii)Period of Implementation 03.01.2006-till date
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. J-11015/109/2003-IA.II(M)
(iii)Date of issue 03 Jan 2006
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Chundru and Barki rivers flowing west to east and north to south respectively control the drainage of the block. The Chundru River marks the Southern boundary of the block whereas Barki River is the eastern limit of the property.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area The important drainage controlling the project area and its buffer zone is Garhi nadi and its two major tributaries Barki nala and Chundru nadi.
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 275
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 375
(e)No. of working days 365
(f)Total Manpower 650
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt315.9218.92
(2.)Percentage of Total Project Area0.482.563.04
(3.)No. of Plants12003980041000
(4.)Funds Allocated12600041790004305000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialSocioeconomic benefits of the Project will accrue through direct and indirect employment to local population.
(2.)EnvironmentalReclamation activities will be carried out throughout the life of mine and post closure as per progressive and final mine closure plan.
(3.)FinancialContribution to exchequer
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 16800000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Vide no: 167454
(b)Date of Approval 04 Oct 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department CCL Board
(e)Approved Mining Lease Area 619.87
(f)Approved Capacity 16.8
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 698.81
(b)Mineable Reserves (Million Ton) 114.59
(c)Extractable Reserves(Million Ton) 114.59
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral A
(f)Stripping Ratio 0.69 : 1.08
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 5
(i)Mining Method Opencast
(j)Life of Mine (Years) 9
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 8
(c)Thickness of seams to be worked on 10
(d)Maximum Thickness of Seams (metres) 20
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 619.87
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Land acquired under CB Act SO No: 1381 dt. 09.05.2
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Land acquired under CB Act SO No: 1381 dt. 09.05.2
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Land acquired under CB Act SO No: 1381 dt. 09.05.2
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 637830
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 637830
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 153.51 (hectare) at a Depth of 90 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 425.22
13.
Details of Transportation:
(a)In Pit/Underground to Surface Tipping Truck
(b)Surface to Siding/Loading Tipping Truck
(c)Transportation / Conveyor Details At present, the coal is being transported by tippi
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)OTHERS(Specify)Non-Forest Land88.23088.23
(2.)AGRICULTURE LAND000
(3.)SURFACE WATER BODIES000
(4.)SETTLEMENTS000
(5.)FOREST LAND531.640531.64
(6.)WASTE LAND000
(7.)GRAZING LAND000
TOTAL619.870619.87
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)OtherNala diversion Haul Road Safety Zone Garland Drain18.923.1056.7278.74
(2.)VIRGIN AREA0000
(3.)EXCAVATION/QUARRY271.71153.510425.22
(4.)TOP SOIL STORAGE0000
(5.)EXTERNAL OB DUMPS89.160089.16
(6.)BUILT UP AREA (COLONY/OFFICE)0026.7526.75
(7.)INTERNAL OB DUMPS0000
(8.)ROADS0000
(9.)GREEN BELT0000
TOTAL379.79156.6183.470619.87
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 89.16
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 425.22
(d)Safety Zone(in hectare) 18.92
(e)Final Void of 153.51 (hectare) at a Depth of 90 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 379.79
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20141212122.550
(2.)20151212124.790
(3.)20171212126.500
(4.)20161212126.230
(5.)201812121210.20
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Jharkhand
(d)Case No. WP(PIL) No. 2775 of 2015
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Enclosed
(f)Case Details Case disposed
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Notice under Section (5) of EPA 1986 regarding non-compliance of EC conditions
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Compliance to the notice was submitted to MOEF&CC
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0092
(ii)Name of the EIA Consultant CENTRAL MINE PLANNING AND DESIGN INSTITUTE
(iii)Address KANKE ROAD, RANCHI
(iv)Mobile No. 8987789101
(v)Landline No. 0651279222
(vi)Email Id gmenv.cmpdi@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Total area is forest land, however in form 2 it is mentioned that no forest land (S.no. 24 of form 2) is involved. please update the form 2 and details of Stage 1 and Stage 2 FC needs to be uploaded.\ 2.Details of Terms of Reference (ToR)/EC in form 2 at Sno. 6 is mentioned NIL. It seems that PP has not uploaded the EC details as the proposal relates to under 7(ii) of EIA 2006 for expansion. PP need to upload the details of EC and details of expansion sought 3.Details of linkage at SNo. 13.1 of Form 2 has to be submitted adequately 4.Details of Presence of Schedule-I Species mentioned NIL, however total land is forest land. Details of conservation plan alongwith its approval letter needs to be uploaded 5. Notice under Section (5) of EPA 1986 regarding non-compliance of EC condition was issued. what is the compliance status of the direction now?? 6. This EC is granted under 1994 notification. How the PP can submit the application under 7(ii) provisions of the EIA Notification, 2006. This provisions is only valid for those projects who got EC under 2006 notification. Kindly clarify and upload relevant documents. 7.Updated form 1 has uploaded without signature. Kindly correct the same 5. 28 Nov 2019
2.NAThe correction have been made as per the instruction received 10 Jan 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDevendra Prasad
DesignationPO
Name of Company (Applicant Name should not be given here)Central Coalfields Limited
AddressDARBHANGA HOUSE, CCL, RANCHI
Print