Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil & Gas exploration & development drilling and production in NINGRU OIL & GAS FIELD in Changlang and Namsai Districts under Ningru PML.
(b)Name of the Company / Organisation OIL INDIA LIMITED
(c)Registered Address OIL INDIA LIMITED DULIAJAN District : Dibrugarh ,,Dibrugarh,Assam-786602
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajit Chandra Haloi
(b)Designation (Owner/ Partner/ CEO) CGM(HSE)
(c)Address Safety & Environment Department , Oil India Limited, Duliajan,,,Dibrugarh,Assam-786602
(d)Pin code 786602
(e)E-mail safety@oilindia.in
(f)STD Code. 374(f)Telephone No. 2800542
(g)Fax No. 03742801796
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/AR/IND2/123232/2018
(d)Master Proposal Number(Single Window) SW/123230/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Changlang and Namsai Districts
(b)Pincode 793103
(c)Bounded Latitudes (North)
From
Degree 27.383333
Minutes
Second
From
Degree 27.749982
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 95.919436
Minutes
Second
From
Degree 96.258333
Minutes
Second
(e)Survey of India Topo Sheet No. 92A/6, 92A/7, 92A/2, 92A/3, 83M/5, 83M/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1050
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Arunachal Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/116/2018-IA-II(I)
(b)Date of Apply of TOR 27 Mar 2018
(c)Date of Issue of TOR / Standard ToR 04 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :1.5
Kumchai Deori
State :Arunachal Pradesh
District :Changlang
Tehsil :Diyun Circle
Village :Kumchai Deori
350Employment for locals, Infrastructure development related to education, healthcare, roads in the area through CSR activities, Pollution controlOthersAdditional Deputy Commissioner
(2.)
Date of Advertisement :18 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :9.5
Nongtau Khampti
State :Arunachal Pradesh
District :Namsai
Tehsil :No Data
Village :Nongtau Khampti
160Employment for locals, Infrastructure development related to education, healthcare, roads in the area through CSR activities, Pollution controlDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Oil & Gas exploration development and production35 wells and 3 production installation
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Oil and gas wells35OthersNo of wellsOthersWell drilling
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1431.90
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.58
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.79
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel3.5Kilo Litre per DayLocal supplierRoad50 Othersthrough supplierCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 19 Oct 2018 To 10 Jan 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube68.440.665.70100
(2.)PM2.5Micro Gram per Meter Cube35.515.935.2460
(3.)SO2Micro Gram per Meter Cube30.16.120.6180
(4.)NOxMicro Gram per Meter Cube34.26.232.180
(5.)OthersCOMili Gram per Meter Cube0.750.110.692
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l136685002000
(2.)Total Hardnessmg/l12542200600
(3.)Fluoridemg/l0.10.011.5
(4.)pHOthersNone7.326.926.58.5
(5.)TSSOthersNot analyzed0000
(6.)Chloridesmg/l234.62501000
(7.)Heavy MetalsLeadmg/l0.0050.0050.010.01
(8.)OthersTotal Chromiummg/l0.010.010.050.05
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l32C
(2.)pHOthersnone7.66.8A
(3.)CODmg/l134C
(4.)DOmg/l7.06.2C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.843.345
(2.)Leq(Day)A-weighted decibels(dB(A))61.348.055
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram1693559
(2.)K(Potassium)Milligram per Kilogram1082250
(3.)pHOthersnone6.625.70
(4.)Electric ConductivityMillisiemens per Centimetre14449
(5.)P(Phosphorus)Milligram per Kilogram3018
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.44 To 2.93
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.38 To 1.78
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater500Copy of Permission LettermodeOthersWell at siteTube WellS&E/E/98/143509 Sep 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater88Septic tank and soak pitOtherssoak pit08
(2.)Drilling and Wash wastewater16.8150Effluent Treatment PlantOthersDischarge, reuse and recycling106.8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 24.8
(b)Total Discharged Water (Kilolitre per Day) 14.8
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste drilling mudIndustrial Waste3072Tons0OthersDisposed at HDPE lined pits within siteOthersDisposed at HDPE lined pits within site
(2.)Drill CuttingIndustrial Waste1840Tons0OthersDisposed at HDPE lined pits within siteOthersDisposed at HDPE lined pits within site
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube53.432.50.004753.43471100
(2.)PM2.5Microgram per Meter Cube26.050026.050160
(3.)SO2Microgram per Meter Cube9.042.50.15949.19940180
(4.)NOxMicrogram per Meter Cube23.212.50.117523.3275180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel70.3PM100.07
(2.)DG setDiesel70.3SO20.374
(3.)DG setDiesel70.3NOx1.836
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Diesel Generator sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) one additional 1250 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 28213
(b)Private Land (ha.) 11621
(c)Government Land (ha.) 2216
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 655
    Total Land (ha.) 42705
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 10052
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2150
(e)Settlements (ha.) 1569
(f)Industrial (ha.) 145
(g)Forest (ha.) 28213
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Tea Garden, roads 576
    Total (ha.) 42705
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersWells and production installations109.369
Total (ha.) 109.369
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone10No WLS within 10 km of wells
(2.)Critically Polluted AreaNone10No critically polluted area within 10 km
(3.)Wildlife CorridorsNone10No Wildlife corridor within 10 km of wells
(4.)CorridorsNone10No corridors within 10 km of wells
(5.)NPANamdapha Tiger Reserve22Namdapha Tiger reserve 22 km from nearest well
(6.)ESZsNone10No ESZ within 10 km of wells
(7.)ESAsNone10No ESA within 10 km of wells
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone10No No archaeological sites within 10 km of wells
(2.)ForestAll Wells located within forests0All wells located within forest land
(3.)Defence InstallationsNone10No major defense installations within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land will not be acquired, land will be leased fro
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 21 Schedule I species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 0
(iii)Period of Implementation Within the drilling and production period
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kumchai River, Janthu River, Noa Dehing River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 80
(d)Temporary Employment- During Operation 40
(e)No. of working days 120
(f)Total Manpower 180
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProvision of more royalty to Arunachal Pradesh State Government and more cess to Govt. of India Energy security for the country
(2.)SocialProvision of more employment opportunity to local people, Development of infrastructure (roads), improvement of school infrastructure etc.) in the area, Increase in business opportunity for the local people Programs related to livelihood generation, health improvement as per OIL’s Corporate Social Responsibility (CSR) programmes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1618/RA 0055
(ii)Name of the EIA Consultant ERM India Pvt. Ltd.
(iii)Address Building 10, Tower A, 4th Floor, DLF Cyber City Gurgaon 122002
(iv)Mobile No. 9810068161
(v)Landline No. 0124417030
(vi)Email Id subir.gupta@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per the project details submitted, the drilling is proposed in the forest land. (1)Kindly provide the status of Stage-1 FC/application. ()Please inform whether the drilling site is located in any protected area, requiring NBWL recommendations? 07 Nov 2019
2.NAThe correction have been made as per the instruction received 08 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjit Chandra Haloi
DesignationCGM(HSE)
Name of Company (Applicant Name should not be given here)OIL INDIA LIMITED
AddressOIL INDIA LIMITED DULIAJAN District : Dibrugarh
Print