Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil and Gas Exploration and Appraisal in the Block CB-ONHP-2017/3 in Bharuch district of Gujarat
(b)Name of the Company / Organisation M/s Vedanta Limited(Division Cairn Oil & Gas)
(c)Registered Address DLF Atria, Phase 2, Jacaranda Marg, DLF City,Gurugram,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Khitish kumar Nayak
(b)Designation (Owner/ Partner/ CEO) Head, HSE & Compliance
(c)Address DLF Atria, Phase 2, Jacaranda Marg, DLF City,Gurugram,Gurgaon,Gurgaon,Haryana-122002
(d)Pin code 122002
(e)E-mail kk.nayak@cairnindia.com
(f)STD Code. 0(f)Telephone No. 4593082
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Category A
(c)Proposal Number IA/GJ/IND2/99849/2019
(d)Master Proposal Number(Single Window) SW/123154/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 46B16, 46C13
(b)Pincode 392110
(c)Bounded Latitudes (North)
From
Degree 21.57
Minutes
Second
From
Degree 22.05
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.49
Minutes
Second
From
Degree 72.57
Minutes
Second
(e)Survey of India Topo Sheet No. F43N1, F43H4, F43G16, F43G12, 46C9, 46C13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 210
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchJambusar
(2.)GujaratBharuchAmod
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/100/2019-IA-II(I)
(b)Date of Apply of TOR 19 Mar 2019
(c)Date of Issue of TOR / Standard ToR 20 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :1
BRC Bhavan, infront of GEB office, Near veterinary clinic, Amod, Tal: Amod, District –Bharuch, Gujarat
State :Gujarat
District :Bharuch
Tehsil :Amod
Village :Amod
44EmploymentsOthersResident Additional Collector and Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Well Pad90 daysFor exploitation of Hydrocarbons
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Drilling of Exploratory & Appraisal wells17OthersNos.OthersNot Applicable
(2.)Associated Natural Gas1.2OthersMMSCFDOthersCaptive consumption as fuel in GEG
(3.)Crude Oil8000OthersBOPDOthersOil Tanker
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 315.42
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.1
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.73
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 102
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 102
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water102Kilo Litre per DayTanker SupplyRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 13 Mar 2019 To 06 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube60.538.560.2100
(2.)PM2.5Micro Gram per Meter Cube28.917.228.960
(3.)SO2Micro Gram per Meter Cube9.55.19.280
(4.)NOxMicro Gram per Meter Cube19.98.419.880
(5.)OthersCarbon MonoxideMili Gram per Meter Cube0.290.110.284
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l780240200600
(2.)OthersSulphatemg/l20834200400
(3.)pHNA8.057.416.58.5
(4.)TSSmg/l1111
(5.)TDSmg/l17415225002000
(6.)Chloridesmg/l7071622501000
(7.)Fluoridemg/l0.910.3611.5
(8.)Heavy MetalsLeadmg/l0.0030.0030.0030.003
(9.)OthersIronmg/l0.050.050.30.3
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.14.6C
(2.)BODmg/l5.12.5C
(3.)OthersTDSmg/l978219C
(4.)OthersNitratemg/l152C
(5.)pHNA8.367.88C
(6.)CODmg/l3218C
(7.)OthersChloridemg/l33648C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.647.855
(2.)Leq(Night)A-weighted decibels(dB(A))44.139.945
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.237.56
(2.)N(Nitrogen)Kilogram per hectare561280
(3.)Electric ConductivityMillisiemens per Centimetre0.6870.089
(4.)K(Potassium)Parts per Million463216
(5.)P(Phosphorus)Kilogram per hectare52.819.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Supply1022Copy of Permission LettermodeOthersTankerOthersNot Applicablexyz25 Oct 2019102
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Wastewater - produced water223250Mobile Effluent treatment plantOthersAs per CPCB standard17053
(2.)Effluent from drilling operation4050Mobile Effluent treatment plantOthersAs per CPCB standard1030
(3.)Domestic waste water2530mobile sewage treatment plantReuse within the Plant & Recycling250
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 288
(b)Total Discharged Water (Kilolitre per Day) 83
(c)Total Reused Water (Kilolitre per Day) 205
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic WasteMunicipal Solid Waste0.03Tons0RoadOthersCompost pits
(2.)Drill cuttings associate with WBMIndustrial Waste750Tons0RoadOthersHDPE lined collection pit
(3.)Drill cuttings associated with SBMIndustrial Waste1500Tons0RoadOthersHDPE lined collection pit
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.91.32.9422.8580
(2.)PM2.5Microgram per Meter Cube28.91.10.1829.0960
(3.)SO2Microgram per Meter Cube9.51.20.0039.50480
(4.)PM10Microgram per Meter Cube60.51.10.1860.681100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)EPU Flare StackNG300.3NOx2.52
(2.)Test flare StackNG300.21SO20.063
(3.)1000 KVA DG SetHSD100.2NOx0.687
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2450
(b)Source 1 x 350 KVA DG Sets (camp site) 1 x 100 KVA DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1X1000 KVA (drilling site) –(1Stand by )or 1X1850
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 9
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 49000
(b)Waste/Barren Land (ha.) 5901
(c)Grazing/ Community Land (ha.) 3200
(d)Surface Water Bodies (ha.) 10200
(e)Settlements (ha.) 7700
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Road, rail etc 13600
    Total (ha.) 89601
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersWell pad9Each well pad
Total (ha.) 9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0Not Applicable
(2.)ESZsNone0Not Applicable
(3.)WLSNone0Not Applicable
(4.)NPANone0Not Applicable
(5.)ESAsNone0Not Applicable
(6.)CorridorsNone0Not Applicable
(7.)Wildlife CorridorsNone0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0Not Applicable
(2.)OthersWater BodiesRupa Khadi & Rohad Lake0.75From well no. 8 & 9
(3.)ForestNone0Not Applicable
(4.)Archaeological SitesNone0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 9
(c)Status of Land acquisition if not acquired Land will be taken on lease
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pea Fowl (Pavo cristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Dhadhar River (Vishwamitri)
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Dhadhar River (Vishwamitri)
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 80
(e)No. of working days 90
(f)Total Manpower 80
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.8
(b)Percentage of Total Project Area 31.11
(c)No. of Plants to be Planted 1500
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Issues raised during public hearing, response by the project proponent, action plan with budgetary allocation. Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents. (ii) It is noted that there are various deficiencies in Form 2 (viz. S. no. 7.1, 32, 38 etc.) uploaded by the PP and accordingly Revised Form 2 shall be submitted incorporating all the information related to the project. (iii) The report contains 11 Chapters. TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. (iv) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised. (v) As per EIA Report schedule I species reported. Please submit approval status of conservation plan for Schedule I species along with budgetary provisions and its approval from CWLW needs to be provided. (vi) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted. (vii) Details of show cause notice and other violations, if any, needs to be submitted. (viii) Incremental GLC values in the EIA/Form 2 were reported and needs to be confirmed/rechecked. (ix) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (x) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted. (xi) Consultant accreditation has expired 05 Dec 2019
2.NAThe correction have been made as per the instruction received 09 Dec 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are pleased to submit the response to the Additional detail Sought (ADS) against Proposal No. IA/GJ/IND2/99849/2019 for your kind consideration and grant of environmental clearance. 08 May 2020
2.NA

The proposal was accordingly deferred for the needful. 

06 Feb 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKhitish kumar Nayak
DesignationHead, HSE & Compliance
Name of Company (Applicant Name should not be given here)M/s Vedanta Limited(Division Cairn Oil & Gas)
AddressDLF Atria, Phase 2, Jacaranda Marg, DLF City