1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Onshore Oil and Gas Exploration and Appraisal in RJ-ONHP-2017/1 Block, Barmer District, Rajasthan. | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | (c)Registered Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Kumar Bera | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | (c)Address | Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,Cairn Oil & Gas, Vedanta Limited, DLF Atria, DLF Phase-2, DLF City, Gurgaon, Haryana - 122002,,Gurgaon,Haryana-122002 | (d)Pin code | 122002 | (e)E-mail | dilipkumar.bera@cairnindia.com | (f)STD Code. | 124(f)Telephone No. | 4594176 | (g)Fax No. | 4145612 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Category | A | (c)Proposal Number | IA/RJ/IND2/98724/2019 | (d)Master Proposal Number(Single Window) | SW/123149/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 40O/11, 40O/12 | (b)Pincode | 344704 | (c)Bounded Latitudes (North) | | From | | Degree | 2788047.12 | Minutes | | Second | | From | | Degree | 281898.71 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 751363.69 | Minutes | | Second | | From | | Degree | 775476.26 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 40O/11, 40O/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 342 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6.54 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Sundargarh | Hemgir | Gopalpur (Telendih) | (2.) | Orissa | Sundargarh | Hemgir | Gopalpur (Telendih), Ratansara | (3.) | Rajasthan | Barmer | gudhamalani | | (4.) | Rajasthan | Barmer | Chohtan | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/80/2019-IA-II(I) | (b)Date of Apply of TOR | 11 Mar 2019 | (c)Date of Issue of TOR / Standard ToR | 13 Apr 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Sep 2019 | Distance of Public Hearing Venue from the Proposed Project : | 15.4 |
| Rajkiya Higher Secondary School, Bachdao | State : | Rajasthan | District : | Barmer | Tehsil : | Chohtan | Village : | Bachdao |
| 100 | Training of
Local
untrained
Community
people for
livelihood
Providing
Drinking
water
infrastructure
Plantation
around Well
Pad | Others | Aditional District Magistrate, Barmer | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 29 Well Pad | 90 days | For exploitation of hydrocarbons. | (2.) | Eairly Production Facility | 60 days | For Eairly Production of hydrocarbons. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Drilling of Exploretory and Apprisal Wells | 29 | Others | Number | Others | Drilling | (2.) | Natural Gas | 1.8 | Others | MMSCFD | Others | Captive use as fuel in GEG | (3.) | Crude OIl | 12000 | Others | BOPD | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 670.78 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.08 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.71 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.08 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1902 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1902 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Water Based Mud | 1000 | Others | m3/well | supply from Manufacturer | Others | Truck | 0 | Others | Manufacturer | Copy of Linkage | (2.) | Synthetic Based Mud | 800 | Others | m3/well | supply from Manufacturer | Others | Truck | 0 | Others | Manufacturer | Copy of Linkage | (3.) | Water | 102 | Cubic Meter per Day | | Tanker Supply | Road | | 0 | Others | Approved Supplier | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 10 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 18 | 5.3 | 17.59 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 49.50 | 21.10 | 47.83 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 1.55 | 0.00 | 1.39 | 4 | (4.) | PM10 | | Micro Gram per Meter Cube | 92 | 40 | 89.08 | 100 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 44 | 11 | 38.38 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 3800 | 950 | 250 | 1000 | (2.) | Fluoride | | | mg/l | | 3800 | 950 | 250 | 1000 | (3.) | pH | | | NA | | 7.5 | 7.2 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 0.00 | 0.00 | 0.00 | 0.00 | (5.) | TDS | | | mg/l | | 9428 | 2460 | 500 | 2000 | (6.) | Heavy Metals | | Arsenic | mg/l | | 0.001 | 0.001 | 0.01 | 0.05 | (7.) | Total Hardness | | | mg/l | | 970 | 430 | 300 | 600 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 0 | 0 | C | (2.) | pH | | NA | | 0 | 0 | C | (3.) | BOD | | mg/l | | 0 | 0 | C | (4.) | COD | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 59.5 | 38 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 66.4 | 38.5 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.2 | 6.8 | (2.) | N(Nitrogen) | Percent | | 1.37 | 0.75 | (3.) | P(Phosphorus) | Others | mg/kg | 49.41 | 14.76 | (4.) | K(Potassium) | Parts per Million | | 1253.55 | 690.84 | (5.) | Electric Conductivity | Others | µS/cm | 866.2 | 248.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 36.18 To 4.9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 38.07 To 4 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Water Supply from Approved Supplier | 102 | 0 | Copy of Permission Letter | modeOthers | Tanker Supply | Others | Tanker Supply | Not Applicable | 27 Oct 2019 | 102 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water during Drilling | 25 | 30 | Mobile STP | Others | Reuse within the Plant & Recycling, green Belt | 25 | 0 | (2.) | Effluent From Drilling Operation | 40 | 50 | Mobile ETP | Others | Discharge as per CPCB Standerd | 10 | 30 | (3.) | Produced water During Early Production | 225 | 250 | Mobile ETP | Others | Discharge as per CPCB Standerd | 0 | 225 | (4.) | Domestic waste water during Early Production | 15 | 20 | Mobile STP | Others | Reuse within the Plant & Recycling, green Belt | 15 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 305 | (b)Total Discharged Water (Kilolitre per Day) | 255 | (c)Total Reused Water (Kilolitre per Day) | 50 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent WBM | Others | Hazardous Waste Sch-2.2 | 500 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (2.) | Used Oil | Others | Hazardous Waste Sch-5.1 | 2 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (3.) | Drill Cuttings assiciated with WBM | Others | Soild/non hazardous waste | 750 | Tons | 0 | Road | | Others | HDPE Lined Pit | (4.) | Drill Cuttings assiciated with WBM | Others | Soild/non hazardous waste | 750 | Tons | 0 | Road | | Others | HDPE Lined Pit | (5.) | Domestic Waste | Municipal Solid Waste | | 0.03 | Tons | 0 | Road | | Others | Compost Pit | (6.) | Drill Cuttings associated with SBM | Others | Hazardous Waste Sch-2.1 | 1500 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (7.) | Sludge Containing Oil and Others drilling waste | Others | Hazardous Waste Sch-I Cat-2.3 | 500 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 92 | 5 | 0.48 | 93 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 44 | 5 | 0 | 44.1 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 17.7 | 5 | 0.06 | 18 | 80 | (4.) | NOx | | Microgram per Meter Cube | 49.9 | 5 | 20 | 70 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG 1000KVA | HSD | 10 | 0.305 | NOx | | 2.04 | (2.) | DG1000KVA | HSD | 10 | 0.305 | NOx | | 2.04 | (3.) | GEG 1MW | Natural Gas | 10 | 0.3 | NOx | | 4.8 | (4.) | Flating during Testing of wells | Natural Gas | 30 | 0.078 | NOx | | 0.023 | (5.) | Flaring during Early Production | Natural Gas | 30 | 0.30 | NOx | | 0.18 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2450 | (b)Source | DG and GEG | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 x 350 KVA DG Sets (camp site) 2 x 1000 KVA or 1x | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 7614.5 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 71.9 | (e)Settlements (ha.) | 133.5 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 753.3 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Srub and Fellow Land | 45805.2 | Total (ha.) | 54378.399999999994 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Well Pad | 9 | Each Well Pad | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NA | 0 | Not Present | (2.) | Critically Polluted Area | NA | 0 | Not Present | (3.) | WLS | NA | 0 | Not Present | (4.) | NPA | NA | 0 | Not Present | (5.) | ESAs | NA | 0 | Not Present | (6.) | Corridors | NA | 0 | Not Present | (7.) | Wildlife Corridors | NA | 0 | Not Present | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | Not Present | (2.) | Forest | | Degraded Reserve Forest | 0 | Within Block | (3.) | Archaeological Sites | | NA | 0 | Not Present | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land acqisition not started yet | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Seven schedule I species has been recorded but only 1 Schedule I species has been spotted during faunal sampling, Indian Gazelle (Gazella bennettii) and ten avian schedule I species has been recorded | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Luni River | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 0.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 80 | (e)No. of working days | 90 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 0 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue will be generated for both State and country during production phase | (2.) | Social | Community will be benefited through induced socio-economic development, employment generation and CSR activity | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA0108 | (ii)Name of the EIA Consultant | AECOM India Private Limited | (iii)Address | ?AECOM India Private Limited 19th Floor, Building No.5 Tower C, Cyber City Gurgaon 122002 Haryana, India | (iv)Mobile No. | 9819068877 | (v)Landline No. | 8240771980 | (vi)Email Id | chetan.zaveri@aecom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 13 Jan 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Issues raised during public hearing, response by the project proponent, action plan with budgetary allocation needs to be submitted. Public hearing proceedings to be forwarded by the Member Secretary, SPCB along with complete public hearing/consultation documents.
(ii) It is noted that there are various deficiencies in Form 2 (viz. S. no. 7.1, 19, 32, 38 etc.) uploaded by the PP and accordingly Revised Form 2 shall be submitted incorporating all the information related to the project.
(iii) The report contains 11 Chapters. TOR compliance is not adequate in EIA/EMP report and need to revise as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006.
(iv) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised.
(v) Accurate water balance with details of total water and fresh water requirement, and permission/ MoU/NOC from concerned regulatory authority needs to be submitted.
(vi) As per EIA Report schedule I species reported. Please submit approval status of conservation plan for Schedule I species along with budgetary provisions and its approval from CWLW needs to be provided.
(vii) Proposed Green belt development programe along-with time line and budgetary allocation needs to be provided | 05 Dec 2019 | 2. | NA | The correction have been made as per the instruction received | 06 Dec 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | In similar proposals, the EAC in its meeting held on 18th June,2020 has already noted that those proposals submitted for onshore oil and Gas exploration and appraisal are now covered as B2 projects in view of the Ministry Notification S.O. 236(E) dated 16th January, 2020. Accordingly, now, only projects in respect of off-shore and onshore oil and gas development and production except exploration, are listed at Category A, requiring appraisal at the Central by the Expert Appraisal Committee.
The EAC also noted that the Early Production Unit (EPU) / Quick Production Unit (QPU) is associated facility of exploration and appraisal and may not be considered for development and production. The EAC has taken decision and suggested the project proponent in similar cases to apply at SEIAA for consideration of project under B2 category. | 29 Jun 2020 | 2. | ADS Reply Letter | Additional Details of RJ-ONHP-2017/1 | 25 May 2020 | 3. | NA | Deferred | 06 Feb 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dilip Kumar Bera | Designation | Sr. Manager - Environment | Name of Company (Applicant Name should not be given here) | M/s Vedanta Limited(Division Cairn Oil & Gas) | Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002 |
|