Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) TECHNICAL GRADE PESTICIDES MANUFACTURING UNIT
(b)Name of the Company / Organisation BHARAT PRODUCTS LIMITED
(c)Registered Address E- 17, 18, DSIDC Industrial Complex, New Delhi,,West,Delhi-110041
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shambhu Nath Upadhyay
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address E-17, 18 , DSIDC Industrial Complex, New Delhi,,Rajouri Garden,West,Delhi-110041
(d)Pin code 110041
(e)E-mail agro@bpl.net.in
(f)STD Code. 11(f)Telephone No. 47003312
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/HR/IND2/92940/2019
(d)Master Proposal Number(Single Window) SW/122997/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Killa no. 12 KA 3/1, 3/2, 8/2, Industrial Sector-2
(b)Pincode 131021
(c)Bounded Latitudes (North)
From
Degree 3206254.38
Minutes
Second
From
Degree 3206370.20
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 703413.07
Minutes
Second
From
Degree 703477.78
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 219
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.68
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaSonipatSonipat
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/33/2019-IA-II(I)
(b)Date of Apply of TOR 25 Jan 2019
(c)Date of Issue of TOR / Standard ToR 02 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0
Killa no. 12 KA 3/1, 3/2, 8/2 Industrial Sector-29, Village Joshi Jat Tehsil Rai Distt. Sonipat, Haryana
State :Haryana
District :Sonipat
Tehsil :Sonipat
Village :Joshi Jat
86Regarding liquid waste and its Management, employment generation, Air emissions and its effect on the surrounding, Solid waste management, noise pollution managementDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Plot Area8000 sqm
(2.)ANF/Centrifuge2-4 cumNumber-04
(3.)Column10 mNumber-02
(4.)DG set400 KVA
(5.)Scrubber2.5-3 m5
(6.)condenser2-20 sqmnumber 10
(7.)Green belt Area2544 sqm
(8.)vessels1-5 cum10
(9.)Vacuum5mmHgNumber 3
(10.)Plant Capacity6480 Tons per Annum
(11.)Cooling Plant150 TR
(12.)Reactor-SS1-6 cumNumber-08
(13.)Plant Area3200 sqm
(14.)Road and other2256 sqm
(15.)Dryer2 cumNumber- 02
(16.)Reactor-MSGL3- 6.3 cumNumber-02
(17.)MEE1 cum/hr
(18.)Air Compressor18 CFM
(19.)Capacity of Boiler2TPH x 1no.
(20.)Capacity of Incinerator100 kg/hr
(21.)WTP5 m3/hr
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pendimethalin Technical240Tons per AnnumRoad
(2.)Metribuzin Technical120Tons per AnnumRoad
(3.)2, -4, Dichlorophenoxy Acetic Acid180Tons per AnnumRoad
(4.)Propiconazole Technical60Tons per AnnumRoad
(5.)Thiamethoxam Technical300Tons per AnnumRoad
(6.)Imidacloprid Technical120Tons per AnnumRoad
(7.)Dicamba Technical60Tons per AnnumRoad
(8.)Diafenthiuron Technical60Tons per AnnumRoad
(9.)Fipronil Technical120Tons per AnnumRoad
(10.)Metalaxyl Technical60Tons per AnnumRoad
(11.)Cypermethrin Technical120Tons per AnnumRoad
(12.)Novaluron60Tons per AnnumRoad
(13.)2-Chloro-5-chloromethyl thiazole (CCMT)480Tons per AnnumRoad
(14.)4 NITRO O'XYLENE480Tons per AnnumRoad
(15.)META PHENOXY BENZALDEHYDE (MPBD)240Tons per AnnumRoad
(16.)2-Chloro-5-chloromethylpyridine (CCMP)240Tons per AnnumRoad
(17.)Triazoles360Tons per AnnumRoad
(18.)Glyphosate Technical120Tons per AnnumRoad
(19.)Clodinafop-Propargyl Technical120Tons per AnnumRoad
(20.)Pretilachlor Technical120Tons per AnnumRoad
(21.)Hexaconazole Technical120Tons per AnnumRoad
(22.)Difenoconazole Technical60Tons per AnnumRoad
(23.)Lambda Cyhalothrin Technical240Tons per AnnumRoad
(24.)Abamectin Technical120Tons per AnnumRoad
(25.)Emamectin Benzoate Technical120Tons per AnnumRoad
(26.)Propargite Technical60Tons per AnnumRoad
(27.)3-methyl-4-nitroimino perhydro 1,3,5-oxadiazine (MNIO)480Tons per AnnumRoad
(28.)Cypermethrin Acid Chloride (CMAC)240Tons per AnnumRoad
(29.)Atrazine Technical120Tons per AnnumRoad
(30.)Bispyribac Sodium60Tons per AnnumRoad
(31.)Oxyfluorfen Technical60Tons per AnnumRoad
(32.)Tricyclazole Technical120Tons per AnnumRoad
(33.)Tebuconazole Technical60Tons per AnnumRoad
(34.)Chlorpyrifos Technical120Tons per AnnumRoad
(35.)Azoxystrobin Technical180Tons per AnnumRoad
(36.)Acetamiprid Technical60Tons per AnnumRoad
(37.)LAMBDA ACID480Tons per AnnumRoad
(38.)N-(Phosphonomethyl)iminodiacetic acid hydrate (PMIDA)120Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2019
(iv)Valid Upto 01 Feb 2019
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.75
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 24851.78
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 24851.78
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dichloroethane13.2Tons per AnnumindegenousRoad10 Open MarketCopy of Linkage
(2.)3,4-Xylidine120Tons per AnnumindegenousRoad10 Open MarketCopy of Linkage
(3.)Sulphuric Acid216Tons per AnnumindegenousRoad10 Open MarketCopy of Linkage
(4.)Nitric acid252Tons per AnnumindegenousRoad10 Open MarketCopy of Linkage
(5.)Hydrogen2.4Tons per AnnumindegenousRoad10 Open MarketCopy of Linkage
(6.)DiethylKetone86.4Tons per AnnumindegenousRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube43.524.842.180
(2.)PM10Micro Gram per Meter Cube258.4118.8242100
(3.)PM2.5Micro Gram per Meter Cube93.541.287.660
(4.)SO2Micro Gram per Meter Cube15.25.414.380
(5.)OthersCOMili Gram per Meter Cube2.20.92.14
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHOthersnone7.47.16.58.5
(3.)TDSmg/l1894875.35002000
(4.)Total Hardnessmg/l760260200600
(5.)Chloridesmg/l4301402501000
(6.)Fluoridemg/l0.680.3211.5
(7.)Heavy MetalsNickelmg/l0.00100.020.02
(8.)OthersNitratemg/l41.819.94545
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.67.3E
(2.)DOmg/l5.54E
(3.)BODmg/l43.24.2E
(4.)CODmg/l28816E
    14.4.     No. of Ambient Noise monitoring locations : 11
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))68.146.245-70
(2.)Leq(Day)A-weighted decibels(dB(A))75.454.255-75
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersMicro Siemens per centimeter35064.2
(2.)P(Phosphorus)Milligram per Kilogram26.86.8
(3.)K(Potassium)Milligram per Kilogram41.85.9
(4.)pH7.96.9
(5.)N(Nitrogen)Milligram per Kilogram92.432.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.57 To 24.84
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.64 To 22.46
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Supply6310Copy of Permission LettermodeOthersRoadOthersTanker Supply-01 Oct 201965
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Boiler, Scrubbing, process, Cooling101120ETP with UV Treatment, RO, MEEReuse within the Plant & Recycling,OthersLosses1010
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 101
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 101
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36Tons0OthersIn-House IncineratorOthersin-house Incinerator
(2.)Discarded Containers (In number)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)3600Tons10RoadAuthorized Recyclers
(3.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)54Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Kilolitre10RoadAuthorized Recyclers
(6.)Biodegradable WasteMunicipal Solid Waste1.98Tons10RoadOthersApproved Vendor
(7.)LinerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.2Tons10RoadAuthorized Recyclers
(8.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)72Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Non-BiodegradableMunicipal Solid Waste2.97Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube7.60.250.27.8180
(2.)Others(Specify)COMicrogram per Meter Cube13000.25400053014000
(3.)PM2.5Microgram per Meter Cube55.70.251.156.8160
(4.)PM10Microgram per Meter Cube147.40.252.23149.64100
(5.)NOxMicrogram per Meter Cube26.20.251.4327.6480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set (400 KVA)HSD300.2NOx0.0289
(2.)Bolier 2TPHCoal300.9PM100.036
(3.)Boiler 2 TPHCoal300.9SO20.0214
(4.)DG set (400 KVA)HSD300.2SO20.0077
(5.)DG set (400 KVA)HSD300.2PM100.0106
(6.)Boiler 2 TPHCoal300.9NOx0.108
(7.)DG set (400 KVA)HSD300.2OthersCO0.138
(8.)Boiler 2TPHCoal300.9OthersCO0.306
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Uttar Haryana Bijli Vitran Nigam
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 400 kVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.8
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22543
(b)Waste/Barren Land (ha.) 90
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 255
(e)Settlements (ha.) 8693
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub land 174
    Total (ha.) 31755
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.2544
(2.)Main Plant0.32
(3.)OthersRoad0.2256
Total (ha.) 0.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone0NA
(2.)CorridorsNone0NA
(3.)Critically Polluted AreaNone0NA
(4.)WLSNone0NA
(5.)NPANone0NA
(6.)ESAsNone0NA
(7.)Wildlife CorridorsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0NA
(2.)Archaeological SitesOld MughalKosMinars,Baiyanpur5.41SWW direction of project site
(3.)Defence InstallationsNone0NA
(4.)OthersWater Body1L Minor1.85East
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1 Lakh
(iii)Period of Implementation 2 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area 1 L Minor
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.85
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 70
(e)No. of working days 330
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.2544
(b)Percentage of Total Project Area 31.80
(c)No. of Plants to be Planted 509
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
(2.)FinancialRevenue will be generated
(3.)EnvironmentalGreen area of 2544 sqm (32% of the plot area) shall be provided as green area which will reduce the pollution load in the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/0987
(ii)Name of the EIA Consultant SHIVALIK SOLID WASTE MANAGEMENT LIMITED
(iii)Address 2nd Floor, SCO 20-21, Near Hotel Dolphin, Zirakpur, Punjab-140604
(iv)Mobile No. 9316028131
(v)Landline No. 0176250949
(vi)Email Id infoshivalikeia@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) EIA report to be revised as per the terms of reference granted for the project, and shall conform to Appendix III of the EIA Notification, 2006. (ii) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised. (iii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be resubmitted. (iv) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted. 05 Dec 2019
2.NAThe correction have been made as per the instruction received 05 Dec 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShambhu Nath Upadhyay
DesignationCEO
Name of Company (Applicant Name should not be given here)BHARAT PRODUCTS LIMITED
AddressE- 17, 18, DSIDC Industrial Complex, New Delhi