Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Technical Grade Pesticide Manufacturing Unit
(b)Name of the Company / Organisation EXCEL PHOSPHATES PVT LTD
(c)Registered Address B 16-17 UPSIDC INDUSTRIAL AREA SALAMPUR HATHARAS,,Hathras,Uttar Pradesh-274509
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pradeep Shrama
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address VA 157 VILA ANANDAM MEERUT ROAD GHAZIABAD,,Meerut,Meerut,Uttar Pradesh-250103
(d)Pin code 250103
(e)E-mail excel2011phosphate@gmail.com
(f)STD Code. 121(f)Telephone No. 2441970
(g)Fax No. 01212441970
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/UP/IND2/106127/2019
(d)Master Proposal Number(Single Window) SW/123003/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. B-16, 17
(b)Pincode 204102
(c)Bounded Latitudes (North)
From
Degree 3062421.30
Minutes
Second
From
Degree 3062517.74
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 227783.11
Minutes
Second
From
Degree 227786.47
Minutes
Second
(e)Survey of India Topo Sheet No. 54 I/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 179
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.47
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshHathrasSasni
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/199/2019-IA-II(I)
(b)Date of Apply of TOR 28 May 2019
(c)Date of Issue of TOR / Standard ToR 01 Jul 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since, the project lies in an Industrial area. So,
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total Power Requirement125 kVA
(2.)Fresh Water requirement16 KLD
(3.)Capacity of ETP20 KLD
(4.)Capacity of incinerator100 kg/hr
(5.)Plot Area0.608 Ha
(6.)Plant Capacity1150 TPA
(7.)Waste water generation16 KLD
(8.)D.G. Set125 kVA1
(9.)Capacity of Boiler`2 TPH1
(10.)Water requirement30.5 KLD
(11.)Capacity of MEE3 cum/hr
(12.)Green Area1438.14 sqm.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Clodinafop-propargyl100Tons per AnnumRoad
(2.)Glyphosate100Tons per AnnumRoad
(3.)Butachlor50Tons per AnnumRoad
(4.)Sulfosulfuron100Tons per AnnumRoad
(5.)Thiaram100Tons per AnnumRoad
(6.)Imidacloprid50Tons per AnnumRoad
(7.)Atrazine100Tons per AnnumRoad
(8.)Thiomethoxam50Tons per AnnumRoad
(9.)2,4-D Sodium salt tech100Tons per AnnumRoad
(10.)Pretilachlor100Tons per AnnumRoad
(11.)Hexaconozol100Tons per AnnumRoad
(12.)Lambda cyhalothrin100Tons per AnnumRoad
(13.)Fipronil50Tons per AnnumRoad
(14.)Cartap hydrochloride50Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Aug 2019
(iv)Valid Upto 30 Aug 2019
(v)File No. -
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 44163.15
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 44163.15
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aceto Nitrile13.99Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(2.)Potassium Carbonate103.42Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(3.)propargyl Chloride30.42Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(4.)isopropyl amine51.1Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(5.)Ferrous Sulphate72Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(6.)Caustic lye172.8Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(7.)Paraformaldehyde12600Tons per AnnumIndegenousRoad10 CaptiveCopy of Linkage
(8.)Acetone1584Tons per AnnumIndegenousRoad10 CaptiveCopy of Linkage
(9.)2,4-Dichloro Valerophenone144Tons per AnnumIndegenousRoad10 MoUCopy of Linkage
(10.)Dimethyl sulphide208.8Tons per AnnumIndegenousRoad10 CaptiveCopy of Linkage
(11.)Dimethyl Sulphate122.4Tons per AnnumIndegenousRoad10 CaptiveCopy of Linkage
(12.)Potassium Hydroxide122.4Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(13.)Soda ash32.36Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(14.)5-Chloro-2,3-difluoropyridine51.71Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(15.)Toluene2.43Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(16.)Cynuric chloride110.23Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(17.)Monoethyl Amine39.18Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(18.)Hydrogen Peroxide180Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(19.)Chloroacetyl chloride2160Tons per AnnumIndegenousRoad10 LOACopy of Linkage
(20.)NaOH16.2Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(21.)ammonia5400Tons per AnnumIndegenousRoad10 LOACopy of Linkage
(22.)Hexane720Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(23.)Dimethyl formamide14.4Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(24.)Caustic lye23.85Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(25.)1,2,4 TRIAZOLE43.2Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(26.)Heptane7.2Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(27.)Sodium Cyanide62.29Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(28.)N-hexane58.4Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(29.)soda ash 5% Sol486.67Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(30.)I P A26.77Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
(31.)TEA360Tons per AnnumIndegenousRoad10 CaptiveCopy of Linkage
(32.)MONO CHLROACETIC ACID91.25Tons per AnnumIndegenousRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube185102.2176.8100
(2.)PM2.5Micro Gram per Meter Cube71.935.969.760
(3.)NOxMicro Gram per Meter Cube3514.83080
(4.)SO2Micro Gram per Meter Cube13.26.412.680
(5.)OthersCOMicro Gram per Meter Cube1.80.81.52
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l20751645002000
(3.)pHNA7.77.16.58.5
(4.)Total Hardnessmg/l308108200600
(5.)Fluoridemg/l0.960.4911.5
(6.)Heavy MetalsNickelmg/l0.540.020.020.02
(7.)OthersAlkalinitymg/l29797200600
(8.)Chloridesmg/l250482501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.67.4E
(2.)DOmg/l4.54.3C
(3.)BODmg/l19.433.3E
(4.)CODmg/l6424E
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))65.446.145-70
(2.)Leq(Day)A-weighted decibels(dB(A))72.351.855-75
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre48.422.1
(2.)pH7.667.43
(3.)P(Phosphorus)Milligram per Kilogram43.428
(4.)K(Potassium)Milligram per Kilogram29.813.6
(5.)N(Nitrogen)Milligram per Kilogram50.828.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 17.03 To 3.54
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.82 To 17.70
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater30.50Copy of Permission LetterPipelineTube Well21-4/8024/UP/IND/201929 Jul 201935
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Lab, Scrubbing, boiler, cooling tower1620AOP based ETPReuse within the Plant & Recycling,Green Belt Renewal Plant,Otherslosses of 1.5 KLD160
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 16
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 16
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)RecyclableMunicipal Solid Waste1.46Tons10RoadAuthorized Recyclers
(2.)BiodegradableMunicipal Solid Waste1.095Tons10RoadOthersApproved Vendor
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.610.0310.6480
(2.)PM10Microgram per Meter Cube152.110.3152.5100
(3.)NOxMicrogram per Meter Cube26.210.0526.2680
(4.)Others(Specify)COMicrogram per Meter Cube1.310.00011.30024
(5.)PM2.5Microgram per Meter Cube57.710.157.8160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (125 kVA)HSD300.3PM100.025
(2.)DG Set (125 kVA)HSD300.3SO20.09
(3.)Boiler (2 TPH)Coal300.8NOx0.089
(4.)DG Set (125 kVA)HSD300.3OthersPM2.50.01
(5.)Boiler (2 TPH)Coal300.8SO20.014
(6.)Boiler (2 TPH)Coal300.8PM100.036
(7.)DG set (125 kVA)HSD300.3NOx0.175
(8.)Boiler (2 TPH)Coal300.8OthersPM2.50.02
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 125
(b)Source Uttar Pradesh Power Corporation Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 X 125 kVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.6080
    Total Land (ha.) 0.6080
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 29496.51
(b)Waste/Barren Land (ha.) 573.84
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 150.45
(e)Settlements (ha.) 1172.43
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Inland Wetland & scrub land 307.66
    Total (ha.) 31700.89
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.197394
(2.)Green belt0.1438
(3.)OthersUtility, road and open area0.266792
Total (ha.) 0.607986
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0-
(2.)CorridorsNone0-
(3.)WLSNone0-
(4.)NPANone0-
(5.)Critically Polluted AreaNone0-
(6.)ESZsNone0-
(7.)Wildlife CorridorsNone0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0-
(2.)Defence InstallationsNone0-
(3.)ForestNone0-
(4.)OthersDensely populated areaNagla Kanch0.23SE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.6080
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1 lakh
(iii)Period of Implementation 2 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Siktara Distribuitary
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 47
(e)No. of working days 310
(f)Total Manpower 72
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.143814
(b)Percentage of Total Project Area 23.65
(c)No. of Plants to be Planted 288
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated.
(2.)FinancialRevenues will be generated.
(3.)Environmental1438.14 sqm. (23.65% of total plot area) will be developed as green area which will help to reduce the pollution load of the areas.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO.19/0987
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Limited
(iii)Address 2nd floor, SCO 20-21, Near Dolphin Hotel, Zirakpur, Punjab, 140604
(iv)Mobile No. 9316028131
(v)Landline No. 0176250949
(vi)Email Id dakshagupta2000@yahoo.co.uk
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) The onsite emergency plan needs to be submitted as per MSIHC Rules, layout plan of the plant need to be revised. (ii) Detailed Plan for Corporate Environmental Responsibility and its implementable schedule with budgetary provisions needs to be submitted. (iii) Accurate water balance with details of total water and fresh water requirement, and permission/MoU/NOC from concerned regulatory authority/CGWA needs to be submitted. (iv) Effluent treatment mechanism with plan for Zero Liquid Discharge needs to be submitted. (v) Details of Raw material linkage and its mitigation measure during transportation needs to be submitted. 05 Dec 2019
2.NAThe correction have been made as per the instruction received 05 Dec 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPradeep Shrama
DesignationDirector
Name of Company (Applicant Name should not be given here)EXCEL PHOSPHATES PVT LTD
AddressB 16-17 UPSIDC INDUSTRIAL AREA SALAMPUR HATHARAS