1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Petrochemical Park at Ambalamugal, Ernakulam District, Kochi, Kerala | (b)Name of the Company / Organisation | KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION | (c)Registered Address | KINFRA House, TC-31/2312,Sasthamangam, Tiruvanantpuram,Ernakulam,Kerala-695010 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | KA Santhosh Kumar | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | KINFRA House, TC-31/2312,Sasthamangalam, Tiruvananthpuram,Kanayannur,Ernakulam,Kerala-695010 | (d)Pin code | 695010 | (e)E-mail | ambilitb@kinfra.org | (f)STD Code. | 471(f)Telephone No. | 2726585 | (g)Fax No. | 2724773 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| Minor Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| (b)Category | A | (c)Proposal Number | IA/KL/NCP/122958/2018 | (d)Master Proposal Number(Single Window) | SW/122954/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | a. Block No: 37, Survey Nos: 2,3,4,5,6,7,22,23,24, | (b)Pincode | 226001 | (c)Bounded Latitudes (North) | | From | | Degree | 95830.25 | Minutes | | Second | | From | | Degree | 95921.56 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 762137.55 | Minutes | | Second | | From | | Degree | 762342.01 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | C43K8 C43Q5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 49.7 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8.16 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Kerala | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 21-330/2017-IA.II | (c)Date of Apply of TOR | 04 May 2018 | (d)Date of Issue of TOR / Standard ToR | 20 Sep 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 01 Jul 2019 | Distance of Public Hearing Venue from the Proposed Project : | 3.6 |
| Collectorate Conference Hall, Ernakulam | State : | Kerala | District : | Ernakulam | Tehsil : | Kunnathunad | Village : | Thiruvamkulam |
| 43 | main issues raised were related to concern about the increasing pollution and employment | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Facility | 198.08 Ha | Industrial Estate | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Area | 198.08 | Hectares | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Jul 2018 | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1310.47 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 32.6 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.47 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.01 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 33.36 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 33.36 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | electricity | 33.36 | Mega Watt(MW) | | state supply | Others | state supply | 0 | Fuel Supply Agreement | | Copy of Linkage | (2.) | Water | 14148 | Kilo Litre per Day | | KINFRA water supply scheme | Pipe Conveyor | | 3 | Fuel Supply Agreement | industrial supply | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 30 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | Benzene | Micro Gram per Meter Cube | 1.99 | 0.55 | 1.91 | 5 | (2.) | SO2 | | Micro Gram per Meter Cube | 16.5 | 6.3 | 9.45 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 72.84 | 31.56 | 47.95 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 17.85 | 7.37 | 10.63 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 49.9 | 20.67 | 30.75 | 60 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.6 | 3.6 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 179 | 33 | 500 | 500 | (3.) | TSS | | | mg/l | | 0 | 0 | 100 | 200 | (4.) | Chlorides | | | mg/l | | 64 | 12.5 | 250 | 1000 | (5.) | Total Hardness | | | mg/l | | 157.2 | 14.1 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 0.84 | 0 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 38 | 3.2 | C | (2.) | COD | | mg/l | | 130.2 | 12 | C | (3.) | pH | | NA | | 7.17 | 6.5 | C | (4.) | DO | | mg/l | | 5.6 | 3.2 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.53 | 43.71 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 57.3 | 36.41 | 75 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.8 | 4.58 | (2.) | P(Phosphorus) | Others | µg/g | 184 | 15 | (3.) | Electric Conductivity | Others | µmhos/cm | 102 | 7 | (4.) | N(Nitrogen) | Percent | | 0.61 | 0.18 | (5.) | K(Potassium) | Milligram per Kilogram | | 128.4 | 45.6 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.3 To 51.5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.1 To 31.8 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | KINFRA Export Promotion Industrial Park | 10143 | 5 | Copy of Permission Letter | Pipeline | | Others | pipeline | A2-1680/50 | 22 Jan 2018 | 49143 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Effluent | 4450 | 5362 | ETP | Reuse within the Plant & Recycling | | 4450 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4450 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 4450 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Hazardous Waste | Industrial Waste | | 87.068 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Municipal | Municipal Solid Waste | | 9.1 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 72.84 | 0.132 | 1.0 | 73.85 | 100 | (2.) | NOx | | Microgram per Meter Cube | 17.85 | 0.132 | 1 | 18.86 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 49.9 | 0.132 | 1 | 51 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 16.5 | 0.132 | 0.8 | 17.4 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set | Diesel | 30 | 0.3 | PM10 | | 0.072 | (2.) | DG Set | Diesel | 30 | 0.25 | PM10 | | 0.019 | (3.) | DG Set | Diesel | 30 | 0.3 | Others | CO | 0.222 | (4.) | DG set | Diesel | 30 | 0.25 | NOx | | 0.0003 | (5.) | DG Set | Diesel | 30 | 0.25 | Others | CO | 0.058 | (6.) | DG set | Diesel | 30 | 0.3 | NOx | | 0.001 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 33360 | (b)Source | State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1500 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 198.08 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 198.08 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 198.08 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : none | 0 | Total (ha.) | 198.0800 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 27.97 | | (2.) | Others | FACT Road | 6.21 | | (3.) | Main Plant | | 163.9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Eravikulam National Park | 72.5 | ESE | (2.) | WLS | Mangalavanam Bird Sanctuary | 9.5 | It is a nesting ground for a large variety of migratory birds and supports many types of mangroves | (3.) | Critically Polluted Area | Greater Cochin area covering Eloor-Edayar | 11.9 | NNW | (4.) | ESZs | Mangalavanam Bird Sanctuary | 9.5 | W | (5.) | Corridors | The elephant corridor in Brahmagiri-Thirunelli | 217.7 | The elephant corridor in Brahmagiri-Thirunelli lies between the states of Kerala and Karnataka in NNW | (6.) | Wildlife Corridors | The elephant corridor in Brahmagiri-Thirunelli | 217.7 | NNW | (7.) | ESAs | Mangalavanam Bird Sanctuary | 9.5 | W | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Hill Palace | 2.5 | it is largest archaeological museum in Kerala | (2.) | Forest | | Idamalayar Reserve Forest | 54.8 | NE | (3.) | Defence Installations | | Ministry of Defence, D.A.D. Residential complex | 11.8 | WSW | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land is Owned by FACT which will be transferred to | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Manmade Lake | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chithrapuzha River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 3733 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 5597 | (e)No. of working days | 365 | (f)Total Manpower | 9330 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 27.97 | (b)Percentage of Total Project Area | 14.12 | (c)No. of Plants to be Planted | 500 | (d)Funds Allocated for Plantation | 20 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Constructing Industrial Estates encourages local investors and foreign companies to invest in this country. The existence of Industrial Estates means, investors are not forced to go through a complicated process that can last years in developing countries (searching a suitable land, getting the necessary permissions from the concerning authorities, constructing infrastructure and get necessary services. Encouraging investors through the construction of Industrial Estates contributes to create su | (2.) | Environmental | Getting rid of health hazards and damages of buildings, which may be caused by accidents occurring in factories and workshops.
Reducing noise pollution caused by factories and workshops.
Industrial Estates contribute to maintain cities clean. In the absence of well organized industrial areas lots of wadis (so called Saila), streets and footpaths suffer from pollution with oils, lubricants and industrial rubbish. Reducing noise and clean cities have positive effects on tourism. Collection, transp | (3.) | Financial | Investors contribute to the development of the national economy through paying rent for the lot or buying the lot, taxes paid by themselves and by their employees, producing goods not existing at the local market and as such reducing the import rate, production of products at competitive costs, which can be exported to foreign markets. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 9 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 5 | (d)Total plot area (sqm) | 1980774.167 | (e)Total built up area (sqm) | 3466.9 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 25 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | state supply | (b)Percentage | 15 | (c)Quantity | 5 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
(1.) | PETROCHEMICAL INTERMEDIATES | 51 | A | (2.) | PHARMACEUTICALS | 10 | B | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0114 | (ii)Name of the EIA Consultant | Voyants Solutions Private Limited | (iii)Address | 403, 4th floor, Park Centra, Sector-30, NH-8, Gurugram-122001, INDIA | (iv)Mobile No. | 9599757300 | (v)Landline No. | 0124459820 | (vi)Email Id | info@voyants.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 09 Jun 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please provide following information/documents:
1. Cover page of EIA/EMP report.
2. Page no. reference for TOR condition compliance in chapter 1.
3. Numbering of sub-heading in chapter 7 is not in order. Itmay be checked for other chapters too. Provide EIA/EMP report with correct numbering of headings and sub-headings.
4. Public Hearing issues raised and commitment made along with budget provision and time frame in tabular form. | 04 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 14 Nov 2019 | 3. | NA | Please submit/comply following:
1. Authorization shall not be given to EIA Consultant. Please submit revised authorization letter.
2. In Form-2 application, at S. No. 6, ToR F. N. not matched with ToR letter issued by the Ministry and same was also mentioned in Covering letter. Please update the same.
3. Tree cutting details shall be in project proponent's letter head. | 18 Nov 2019 | 4. | NA | The correction have been made as per the instruction received | 28 Nov 2019 | 5. | NA | Please submit the authorization letter for this project, as per Form-2. | 09 Dec 2019 | 6. | NA | The correction have been made as per the instruction received | 09 Dec 2019 | 7. | NA | 1Authorization shall not be given to EIA Consultant. Please submit revised authorization letter
2. In Form-2 application, at S. No. 6, ToR F. N. not matched with ToR letter issued by the Ministry and same was also mentioned in Covering letter. Please update the same | 24 Dec 2019 | 8. | NA | The correction have been made as per the instruction received | 24 Feb 2020 | 9. | NA | Please withdraw proposal online from PARIVESH portal. | 03 Mar 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | KA Santhosh Kumar | Designation | MD | Name of Company (Applicant Name should not be given here) | KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION | Address | KINFRA House, TC-31/2312 |
|