Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Petrochemical Park at Ambalamugal, Ernakulam District, Kochi, Kerala
(b)Name of the Company / Organisation KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION
(c)Registered Address KINFRA House, TC-31/2312,Sasthamangam, Tiruvanantpuram,Ernakulam,Kerala-695010
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant KA Santhosh Kumar
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address KINFRA House, TC-31/2312,Sasthamangalam, Tiruvananthpuram,Kanayannur,Ernakulam,Kerala-695010
(d)Pin code 695010
(e)E-mail ambilitb@kinfra.org
(f)STD Code. 471(f)Telephone No. 2726585
(g)Fax No. 2724773
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Minor Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category A
(c)Proposal Number IA/KL/NCP/122958/2018
(d)Master Proposal Number(Single Window) SW/122954/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. a. Block No: 37, Survey Nos: 2,3,4,5,6,7,22,23,24,
(b)Pincode 226001
(c)Bounded Latitudes (North)
From
Degree 95830.25
Minutes
Second
From
Degree 95921.56
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 762137.55
Minutes
Second
From
Degree 762342.01
Minutes
Second
(e)Survey of India Topo Sheet No. C43K8 C43Q5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 49.7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.16
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-330/2017-IA.II
(c)Date of Apply of TOR 04 May 2018
(d)Date of Issue of TOR / Standard ToR 20 Sep 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :31 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :3.6
Collectorate Conference Hall, Ernakulam
State :Kerala
District :Ernakulam
Tehsil :Kunnathunad
Village :Thiruvamkulam
43main issues raised were related to concern about the increasing pollution and employmentDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Facility198.08 HaIndustrial Estate
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Area198.08HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Jul 2018
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1310.47
(b) Funds Allocated for Environment Management (Capital) (in Crores) 32.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.47
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.01
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 33.36
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 33.36
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)electricity33.36Mega Watt(MW)state supplyOthersstate supply0 Fuel Supply AgreementCopy of Linkage
(2.)Water14148Kilo Litre per DayKINFRA water supply schemePipe Conveyor3 Fuel Supply Agreementindustrial supplyCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 30 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersBenzeneMicro Gram per Meter Cube1.990.551.915
(2.)SO2Micro Gram per Meter Cube16.56.39.4580
(3.)PM10Micro Gram per Meter Cube72.8431.5647.95100
(4.)NOxMicro Gram per Meter Cube17.857.3710.6380
(5.)PM2.5Micro Gram per Meter Cube49.920.6730.7560
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.63.66.58.5
(2.)TDSmg/l17933500500
(3.)TSSmg/l00100200
(4.)Chloridesmg/l6412.52501000
(5.)Total Hardnessmg/l157.214.1200600
(6.)Fluoridemg/l0.84011.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l383.2C
(2.)CODmg/l130.212C
(3.)pHNA7.176.5C
(4.)DOmg/l5.63.2C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.5343.7175
(2.)Leq(Night)A-weighted decibels(dB(A))57.336.4175
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.84.58
(2.)P(Phosphorus)Othersµg/g18415
(3.)Electric ConductivityOthersµmhos/cm1027
(4.)N(Nitrogen)Percent0.610.18
(5.)K(Potassium)Milligram per Kilogram128.445.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.3 To 51.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.1 To 31.8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersKINFRA Export Promotion Industrial Park101435Copy of Permission LetterPipelineOtherspipelineA2-1680/5022 Jan 201849143
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Effluent44505362ETPReuse within the Plant & Recycling4450
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4450
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4450
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Hazardous WasteIndustrial Waste87.068Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)MunicipalMunicipal Solid Waste9.1Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube72.840.1321.073.85100
(2.)NOxMicrogram per Meter Cube17.850.132118.8680
(3.)PM2.5Microgram per Meter Cube49.90.13215160
(4.)SO2Microgram per Meter Cube16.50.1320.817.480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel300.3PM100.072
(2.)DG SetDiesel300.25PM100.019
(3.)DG SetDiesel300.3OthersCO0.222
(4.)DG setDiesel300.25NOx0.0003
(5.)DG SetDiesel300.25OthersCO0.058
(6.)DG setDiesel300.3NOx0.001
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 33360
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 198.08
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 198.08
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 198.08
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : none 0
    Total (ha.) 198.0800
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt27.97
(2.)OthersFACT Road6.21
(3.)Main Plant163.9
Total (ha.) 198.08
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAEravikulam National Park72.5ESE
(2.)WLSMangalavanam Bird Sanctuary9.5It is a nesting ground for a large variety of migratory birds and supports many types of mangroves
(3.)Critically Polluted AreaGreater Cochin area covering Eloor-Edayar11.9NNW
(4.)ESZsMangalavanam Bird Sanctuary9.5W
(5.)CorridorsThe elephant corridor in Brahmagiri-Thirunelli217.7The elephant corridor in Brahmagiri-Thirunelli lies between the states of Kerala and Karnataka in NNW
(6.)Wildlife CorridorsThe elephant corridor in Brahmagiri-Thirunelli217.7NNW
(7.)ESAsMangalavanam Bird Sanctuary9.5W
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesHill Palace2.5it is largest archaeological museum in Kerala
(2.)ForestIdamalayar Reserve Forest54.8NE
(3.)Defence InstallationsMinistry of Defence, D.A.D. Residential complex11.8WSW
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 15008
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is Owned by FACT which will be transferred to
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Manmade Lake
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chithrapuzha River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 3733
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 5597
(e)No. of working days 365
(f)Total Manpower 9330
32.
Green Belt in Ha:
(a)Total Area of Green Belt 27.97
(b)Percentage of Total Project Area 14.12
(c)No. of Plants to be Planted 500
(d)Funds Allocated for Plantation 20
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialConstructing Industrial Estates encourages local investors and foreign companies to invest in this country. The existence of Industrial Estates means, investors are not forced to go through a complicated process that can last years in developing countries (searching a suitable land, getting the necessary permissions from the concerning authorities, constructing infrastructure and get necessary services. Encouraging investors through the construction of Industrial Estates contributes to create su
(2.)EnvironmentalGetting rid of health hazards and damages of buildings, which may be caused by accidents occurring in factories and workshops. Reducing noise pollution caused by factories and workshops. Industrial Estates contribute to maintain cities clean. In the absence of well organized industrial areas lots of wadis (so called Saila), streets and footpaths suffer from pollution with oils, lubricants and industrial rubbish. Reducing noise and clean cities have positive effects on tourism. Collection, transp
(3.)FinancialInvestors contribute to the development of the national economy through paying rent for the lot or buying the lot, taxes paid by themselves and by their employees, producing goods not existing at the local market and as such reducing the import rate, production of products at competitive costs, which can be exported to foreign markets.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 9
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 5
(d)Total plot area (sqm) 1980774.167
(e)Total built up area (sqm) 3466.9
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 25
5.
Energy Saving Measures:
(a)Source/Mode state supply
(b)Percentage 15
(c)Quantity 5
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Not Applicable
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
(1.)PETROCHEMICAL INTERMEDIATES51A
(2.)PHARMACEUTICALS10B
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0114
(ii)Name of the EIA Consultant Voyants Solutions Private Limited
(iii)Address 403, 4th floor, Park Centra, Sector-30, NH-8, Gurugram-122001, INDIA
(iv)Mobile No. 9599757300
(v)Landline No. 0124459820
(vi)Email Id info@voyants.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 09 Jun 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease provide following information/documents: 1. Cover page of EIA/EMP report. 2. Page no. reference for TOR condition compliance in chapter 1. 3. Numbering of sub-heading in chapter 7 is not in order. Itmay be checked for other chapters too. Provide EIA/EMP report with correct numbering of headings and sub-headings. 4. Public Hearing issues raised and commitment made along with budget provision and time frame in tabular form. 04 Nov 2019
2.NAThe correction have been made as per the instruction received 14 Nov 2019
3.NAPlease submit/comply following: 1. Authorization shall not be given to EIA Consultant. Please submit revised authorization letter. 2. In Form-2 application, at S. No. 6, ToR F. N. not matched with ToR letter issued by the Ministry and same was also mentioned in Covering letter. Please update the same. 3. Tree cutting details shall be in project proponent's letter head. 18 Nov 2019
4.NAThe correction have been made as per the instruction received 28 Nov 2019
5.NAPlease submit the authorization letter for this project, as per Form-2. 09 Dec 2019
6.NAThe correction have been made as per the instruction received 09 Dec 2019
7.NA1Authorization shall not be given to EIA Consultant. Please submit revised authorization letter 2. In Form-2 application, at S. No. 6, ToR F. N. not matched with ToR letter issued by the Ministry and same was also mentioned in Covering letter. Please update the same 24 Dec 2019
8.NAThe correction have been made as per the instruction received 24 Feb 2020
9.NAPlease withdraw proposal online from PARIVESH portal. 03 Mar 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKA Santhosh Kumar
DesignationMD
Name of Company (Applicant Name should not be given here)KERALA INDUSTRIAL INFRASTRUCTURE DEVELOPMENT CORPORATION
AddressKINFRA House, TC-31/2312
Print