Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Jailaxmi Casting and Alloys Pvt. Ltd.
(b)Name of the Company / Organisation JAILAXMI
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shrinivas PAlsudesai
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address NIL
(d)Pin code 431107
(e)E-mail jailaxmi.casting@rediffmail.com
(f)STD Code. 2431(f)Telephone No. 251236
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND/122469/2017
(d)Master Proposal Number(Single Window) SW/122370/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gut no : 74 & 75 Pharola Village and Gut no : 53 M
(b)Pincode 431107
(c)Bounded Latitudes (North)
From
Degree 19.734015
Minutes
Second
From
Degree 19.734193
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.293284
Minutes
Second
From
Degree 752931.94
Minutes
Second
(e)Survey of India Topo Sheet No. 47M/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 505
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhHemgirTelendih
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/131/2017.- IA II (I)
(c)Date of Issue of TOR 01 May 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 25 Oct 2019
(c)Date of Issue of EC 05 May 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0
Gut no: 74 & 75, Pharola Village, Paithan, Aurangabad (Project Site)
State :Maharashtra
District :Aurangabad
Tehsil :Paithan
Village :Pharola
64Attached as annexureOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. Not Applicable since project was established in ye
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 21 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bright Bars07575OthersTons per Day (TPD)Road
(2.)MS, SS & alloy billet /ingot220530750OthersTons per DayRoad
(3.)Ms,SS & alloy bars & rods, flat bars125625750OthersTons per Day (TPD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Induction Furnace25 MT Capacity X 1 nos--25 MT Capacity X 1 nosNo change
(2.)Re-Heating Furnace20 MT Capacity X 1 nos--20 MT Capacity X 1 nosNo change
(3.)Arc Furnace--30 MT Capacity X 1 nos30 MT Capacity X 1 nosAdditional furnace will be added for proposed expansion
(4.)D.G. Set--1000 kVA1000 kVANew DG set will be installed for power backup
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Dec 2018
(iv)Valid Upto 30 Apr 2021
(v)File No. BO/JD(APC)/TB/UAN No.0000047772/R/CC/1594
(vi)Application No. --
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 73.72
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.64
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.7372
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.4489
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 581.62
(b)Existing quantity of raw material/fuel 239.38
(c)Total quantity of raw material/fuel 821
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FeMn7.5OthersTPDLocalRoad50 Open MarketCopy of Linkage
(2.)Scrap486OthersTPDLocalRoad18 Open MarketCopy of Linkage
(3.)Sponge Iron324OthersTPDLocalRoad820 Open MarketCopy of Linkage
(4.)Silico Manganese2OthersTPDLocalRoad820 Open MarketCopy of Linkage
(5.)Nickel1OthersTPDUAE by Nhava Sheva PortRoad357 Open MarketCopy of Linkage
(6.)Moybdenum Concentrate0.5OthersTPDUAE by Nhava Sheva PortRoad357 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube41.7431.5439.6980
(2.)PM2.5Micro Gram per Meter Cube41.7419.6539.9660
(3.)PM10Micro Gram per Meter Cube87.1271.9486.83100
(4.)SO2Micro Gram per Meter Cube29.5518.5828.0280
(5.)OthersCOMili Gram per Meter Cube10.310.954
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3472515002000
(2.)Total Hardnessmg/l167117200600
(3.)Fluoridemg/l0.440.121.01.5
(4.)Heavy MetalsZincmg/l0.340.08515
(5.)TSSmg/l0000
(6.)Chloridesmg/l86532501000
(7.)pHNA7.296.986.50
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l44D
(2.)CODmg/l3210D
(3.)pHNA7.67.16A
(4.)DOmg/l7.56.9A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.550.775
(2.)Leq(Night)A-weighted decibels(dB(A))52.241.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.257.82
(2.)N(Nitrogen)Kilogram per hectare483291
(3.)K(Potassium)Kilogram per hectare516438
(4.)Electric ConductivityMillisiemens per Centimetre522310
(5.)P(Phosphorus)Kilogram per hectare25.6521.42
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 26 To 28
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 22 To 24
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersFarm Lake1401.46Copy of Permission LetterPipelineOthersFarm LakeNA21 Oct 2019140
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2025Domestic waste will be treated in STPGreen Belt Renewal Plant20
(2.)Furnace cooling tower50NAReuse within the Plant & Recycling5
(3.)DM Plant30NAReuse within the Plant & Recycling3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 28
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 28
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste21900Tons10RoadOthersuse for road development
(2.)AshFly Ash3066Tons10RoadOtherssell to brick manufacturer
(3.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.015Kilolitre5RoadAuthorized Recyclers
(4.)STP SludgeOthersOrganic Sludge from STP1.095Tons1.74RoadOthersUse as manure
(5.)Office WasteMunicipal Solid Waste0.18Tons5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube86.800.186.9100
(2.)PM2.5Microgram per Meter Cube39.900039.9160
(3.)NOxMicrogram per Meter Cube39.600.2839.980
(4.)SO2Microgram per Meter Cube28.000.3628.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stack attached to Induction & proposed arc furnaceElectricity302.0PM100.8
(2.)Stack attached to reheating furnaceCoal402.5PM100.025
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 30000
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000
(e)Stack Height (in m) 6.4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 8.8
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4.5
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Reserved for greenbelt development at Gut no :53, 4.3
    Total (ha.) 8.8
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.4136
(2.)Green belt4.80
(3.)Water Reservoir0.36
(4.)OthersIncludes road, parking area & open area2.2264Includes road, parking area & open area
Total (ha.) 8.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0Not present within 10 km radius
(2.)CorridorsNA0Not present within 10 km radius
(3.)ESZsNA0Not present within 10 km radius
(4.)Critically Polluted AreaNA0NA
(5.)WLSNA0Not present within 10 km radius
(6.)ESAsNA0Not present within 10 km radius
(7.)Wildlife CorridorsNa0Not present within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0Not present within 10 km radius
(2.)OthersNANA0Not present within 10 km radius
(3.)ForestReserved forest patch near Maulalkatoka village7.52NA
(4.)Defence InstallationsNA0Not present within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.80
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Small Checkdam near Farola village & Buranguli River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kham river
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8.27
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.4994.3014.8
(2.)Percentage of Total Project Area1143.4254.42
(3.)No. of Plants97839936
(4.)Funds Allocated32730
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialAdditional Jobs to locals
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/IA0038
(ii)Name of the EIA Consultant Enviro Resources
(iii)Address E-604, Crystal Plaza, Andheri West
(iv)Mobile No. 9867898844
(v)Landline No. 6619881
(vi)Email Id timir@enviroresources.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Jul 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShrinivas PAlsudesai
DesignationDirector
Name of Company (Applicant Name should not be given here)JAILAXMI
AddressPaithan Road, Fut No. 74&75,Village-Farola,