Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) INSTALLATION OF TWO INDUCTION FURNACE OF 12 MT EACH PRODUCING MS INGOTS/BILLETS IN EXISTING PLANT PREMISES OF M/s ADITYA INDUSTRIES LOCATED AT VILLAGE- RAMPUR JATAN, NAHAN ROAD, KAL-AMB, TEHSIL- NAHAN
(b)Name of the Company / Organisation MS ADITYA INDUSTRIES
(c)Registered Address Rampur Jattan Kala Amb, Nahan Road Tehsil Nahan and Dist. Sirmour Himachal Pradesh 173030,,Sirmaur,Himachal Pradesh-173030
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Aditya Industries
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address Rampur Jattan Kala Amb, Nahan Road Tehsil Nahan and Dist. Sirmour Himachal Pradesh 1703030,,Nahan(T),Sirmaur,Himachal Pradesh-173030
(d)Pin code 173030
(e)E-mail adityaeia1@gmail.com
(f)STD Code. 1762(f)Telephone No. 509496
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Category A
(c)Proposal Number IA/HP/IND/122447/2018
(d)Master Proposal Number(Single Window) SW/122444/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 258/197/2/2
(b)Pincode 173030
(c)Bounded Latitudes (North)
From
Degree 30.50949
Minutes
Second
From
Degree 30.51051
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.21737
Minutes
Second
From
Degree 77.21883
Minutes
Second
(e)Survey of India Topo Sheet No. 53F2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 380
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/201/2016-IA-II(I)
(b)Date of Apply of TOR 05 May 2018
(c)Date of Issue of TOR / Standard ToR 11 Aug 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :1
Aam Suwidah Kendra, Industrial area, Kala Amb, Tehsil: Nahan, Sirmaur, H.P.
State :Himachal Pradesh
District :Sirmaur
Tehsil :Nahan(T)
Village :Rampur jattan
44The project proponent will have to ensure that the water used in the company is fully recycled and sound insulator should be installed in D.G set.Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Induction Furnace2 X 12 MT/heat
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rolled Product103680Tons per AnnumRoad
(2.)Billets86400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 Aug 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. HPSPCB/PCB-ID12767/2070-72
(vi)Application No. HPSPCB/PCB-ID12767/2070-72
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 26.41
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.24
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.11
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.66
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 124500
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 124500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)MS Scrap105040Tons per AnnumIndiaRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2015 To 29 Feb 2016
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube29.8017.5029.6680
(2.)PM2.5Micro Gram per Meter Cube50.7625.6050.1660
(3.)OthersCOMicro Gram per Meter Cube0.1500.152000
(4.)PM10Micro Gram per Meter Cube88.7058.1088.47100
(5.)SO2Micro Gram per Meter Cube19.904.1019.4480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l120102501000
(2.)Otherssulphatemg/l75.243.44200400
(3.)TSSmg/l0000
(4.)Total Hardnessmg/l61221200600
(5.)Fluoridemg/l0011.5
(6.)pHNA8.557.156.58.5
(7.)TDSmg/l501175002000
(8.)Heavy MetalsTotal arsenicmg/l000.020.05
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.27.52B
(2.)DOmg/l10.810.2B
(3.)CODmg/l4.51B
(4.)BODmg/l3.40.7B
(5.)OthersTotal coliformOthersMPN/100ml3900140C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.2747.1475
(2.)Leq(Night)A-weighted decibels(dB(A))54.8541.8070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric Conductivity1.5250.043
(2.)N(Nitrogen)Percent0.780.26
(3.)K(Potassium)Othersmilligram per 100 gm111.9
(4.)pH9.167.19
(5.)P(Phosphorus)Othersmilligram per 100 gm0.380.21
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.76 To 43.98
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.98 To 37.35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherssupply by IADA Kala Amb282Copy of Permission LetterPipelineOthersIADA supplyIND/SWCA/KA/Misc/110101 Nov 201828
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic1010STPGreen Belt Renewal Plant10
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mill scaleIndustrial Waste2700Tons20RoadCo-Processing
(2.)SlagIndustrial Waste3900Tons20RoadCo-Processing
(3.)Spent lubricantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)400Kilolitre20RoadAuthorized Recyclers
(4.)APCD DustIndustrial Waste300Tons20RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxNA00010
(2.)PM2.5NA00010
(3.)PM10Microgram per Meter Cube86.059.51.3414987.39149100
(4.)SO2NA00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD80PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9800
(b)Source HImachal Pradesh State Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 325 KVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.12
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.57
    Total Land (ha.) 1.69
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8045.36
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 47.3
(e)Settlements (ha.) 1613.24
(f)Industrial (ha.) 0
(g)Forest (ha.) 14799.3
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : fallow land and River 6910.3
    Total (ha.) 31415.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.57
Total (ha.) 0.57
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA000
(2.)WLS000
(3.)Critically Polluted Area000
(4.)ESZs000
(5.)Wildlife Corridors000
(6.)Corridors000
(7.)ESAs000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites000
(2.)Defence Installations000
(3.)Otherswildlife sanctuary000
(4.)ForestGumti Sambhalwa RF6.950
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired existing land of 1.39 Ha
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Markanda River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.48
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 45
(b)Permanent Employment-During Operation 45
(c)Temporary Employment- During Construction 60
(d)Temporary Employment- During Operation 60
(e)No. of working days 300
(f)Total Manpower 210
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.57
(b)Percentage of Total Project Area 33.73
(c)No. of Plants to be Planted 2040
(d)Funds Allocated for Plantation 450000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEnvironment
(2.)Socialemployment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 134
(ii)Name of the EIA Consultant shivalik solid waste management Ltd
(iii)Address sco-20-21, Near Hotel Dolphin,Kalka-shimla Highway
(iv)Mobile No. 8288079365
(v)Landline No. 0176250949
(vi)Email Id infoshivalikeia@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 16 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAditya Industries
DesignationOwner
Name of Company (Applicant Name should not be given here)MS ADITYA INDUSTRIES
AddressRampur Jattan Kala Amb, Nahan Road Tehsil Nahan and Dist. Sirmour Himachal Pradesh 173030