1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s Damodar Valley Corporation for Tubed Coal Mines Project (6.0 MTY) Villages: Tubed, Mangra, Dihi, Ambajharan, Dhobiajharam, Nawari, Tehsil: Latehar, District: Latehar (Jharkhand) | (b)Name of the Company / Organisation | MS DAMODAR VALLEY CORPORATION | (c)Registered Address | D.V.C. Tower,V.I.P Road, Kolkata,,Kolkata,West Bengal-700054 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Damodar Valley Corporation | (b)Designation (Owner/ Partner/ CEO) | Ferm | (c)Address | Near Villages Tubed, mangra, dihi, ambajharan, dhobiajharan, nawari, Tehsil Latehar, District Latehar, State Jharkhand,,No Data,Latehar,Jharkhand-829204 | (d)Pin code | 829204 | (e)E-mail | tubedcoal460@gmail.com | (f)STD Code. | 141(f)Telephone No. | 2744509 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/CMIN/65302/2017 | (d)Master Proposal Number(Single Window) | SW/121833/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Village Khasra No. Mangra 330 Tubed 333 Dihi 334 A | (b)Pincode | 700054 | (c)Bounded Latitudes (North) | | From | | Degree | 234917.30 | Minutes | | Second | | From | | Degree | 23501.35 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 84341.99 | Minutes | | Second | | From | | Degree | 8435.015 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45A9 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 412 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Latehar | No Data | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/54/2017-IA-II(M) | (b)Date of Apply of TOR | 03 Jan 2018 | (c)Date of Issue of TOR / Standard ToR | 16 Mar 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 10 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 9.52 |
| Latehar Stadium (Near Boys High School | State : | Jharkhand | District : | Latehar | Tehsil : | Latehar | Village : | Tubed, Mangra, Dihi, Ambajharan, Dhobiajharan, Nawari |
| 629 | Regarding compensation, employment and environment management | Others | Additional Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Open cast Coal Mining Project | 6 million Tons per annum | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 460 | 6000000 | Tons per Annum | | Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1300 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 42.89 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 12.24 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.49 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 2310 | Kilo Litre per Day | | Near by petrol pumps | Road | | 2.6 | Others | BY ROAD | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 26.26 | 11.24 | 25.23 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.52 | 4.12 | 9.39 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 15.14 | 6.52 | 14.54 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 44.28 | 32.29 | 44.27 | 100 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.92 | 6.82 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 32 | 10.5 | 0 | 0 | (3.) | Total Hardness | | | mg/l | | 260 | 192 | 0 | 600 | (4.) | Fluoride | | | mg/l | | 0.66 | 0.36 | 1 | 1.5 | (5.) | TDS | | | mg/l | | 510 | 410 | 500 | 2000 | (6.) | Chlorides | | | mg/l | | 110 | 88 | 0 | 100 | (7.) | Heavy Metals | | iron | mg/l | | 0.68 | 0.26 | 0.30 | 1 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 8.12 | 6.78 | A | (2.) | DO | | mg/l | | 8.2 | 7.4 | A | (3.) | COD | | mg/l | | 0 | 0 | A | (4.) | BOD | | mg/l | | 7.2 | 4.8 | A | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.6 | 62.44 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 50.6 | 38.56 | 75 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.14 | 7.54 | (2.) | P(Phosphorus) | Kilogram per hectare | | 44.62 | 36.24 | (3.) | K(Potassium) | Kilogram per hectare | | 162 | 88.64 | (4.) | N(Nitrogen) | Kilogram per hectare | | 0.08 | 0.0.64 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 410 | 290 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 18 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 12 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 40 | 6 | Copy of Permission Letter | modeOthers | Water Tanker | Others | Bore well | CGWA/NOC/MIN/ORIG/2019/5876 | 14 Aug 2019 | 40 | (2.) | Surface | | 710 | 1 | Copy of Permission Letter | modeOthers | Water Tanker | Others | by Water pumps | CGWA/NOC/MIN/ORIG/2019/5876 | 14 Aug 2019 | 770 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Service Facilities | 10 | 1000 | septic tank | Others | Reuse for Mining porpose | 10 | 0 | (2.) | HEMM washing and workshop | 45 | 1000 | Septic Tank | Others | washing the machinery | 45 | 0 | (3.) | CHP and coal stock pile | 150 | 1000 | Septic Tank | Others | Reuse to develop the green belt area | 150 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 205 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 205 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Mine waste | Others | Over burden | 40.65 | Tons | 0 | Others | dumper | Others | OB will be back filled in pit | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 26.26 | 5 | 4.9 | 31.17 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 44.28 | 5 | 16.4 | 60.70 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 9.92 | 5 | 1.23 | 11.16 | 80 | (4.) | NOx | | Microgram per Meter Cube | 15.14 | 5 | 2.13 | 17.28 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1000 | (b)Source | Jharkhand State Electricity board | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 162.39 | (b)Private Land (ha.) | 235.24 | (c)Government Land (ha.) | 62.37 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 460 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 112.98 | (b)Waste/Barren Land (ha.) | 21.21 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 73.06 | (e)Settlements (ha.) | 24.23 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 186.7 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow land | 41.82 | Total (ha.) | 460 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 63 | | (2.) | Others | road, undistubed area , area excavated | 397 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | 0 | 0 | 0 | (2.) | Corridors | 0 | 0 | 0 | (3.) | Critically Polluted Area | 0 | 0 | 0 | (4.) | NPA | 0 | 0 | 0 | (5.) | ESAs | NA | 0 | 0 | (6.) | ESZs | NA | 0 | 0 | (7.) | Wildlife Corridors | NA | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Tubed RF | 0.23 | NW direction | (2.) | Others | p.f | Mangra PF | 0.12 | SSE direction | (3.) | Archaeological Sites | | Bishrampur PF | 0.21 | SW direction | (4.) | Defence Installations | | Ubar PF | 2.5 | SSW direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Protected | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 460 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 6 | (b)No. of Households | 164 | (c)No. of PDFs (Project Displaced Families) | 201 | (d)No. of PAFs (Project Affected Families) | 418 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 3543 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 650 LAKHS | (iii)Period of Implementation | 10 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 911 | (iii)Date of issue | 23 May 2018 | (iv)Recommendation | 0 | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Sukri River | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | A river named sukri is a tributary of auranga flows in western direction and passes through the tubed coal block. | (ii)Details of Study Conducted | Assessment study for diversion of river Sukri pass | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | SE/canal/304/plan/2019/1045 | (iii)Date of issue | 13 Nov 2019 | (iv)Recommendation | The diversion plan has been accepted ‘In principal | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bhugbhug nala Ekchatia nala Bhaimanda nala | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 6.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 800 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 400 | (e)No. of working days | 330 | (f)Total Manpower | 1200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 427.67 | (b)Percentage of Total Project Area | 92.97 | (c)No. of Plants to be Planted | 684272 | (d)Funds Allocated for Plantation | 23318160 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | It becomes important for the region to operate the mine to generate employment opportunities for local people and improves livelihood as well as lifestyle of people. Besides this, the project of Tubed Coal Mine by M/s Damodar Valley Corporation will prove beneficial in terms of socio-economic development as it will provide employment to locals. Further, the average income level, which is the indicator of socio – economic status of households is expected to increase, which will result in better s | (2.) | Financial | Coal is one of the major mineral deposits occurring in the Indian sub-continent. It has played a great role in development of civilization and industrialization. The occurrence of coal in proposed area is proved by the way of exploration and its production has important role in the local industries | (3.) | Environmental | The environment management plan is prepared with a view to facilitate effective environmental management of the project, in general and implementation of the mitigation measures in particular. The EMP provides a delivery mechanism to address potential adverse impacts and to introduce standards of good practice to be adopted for all project works. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | COAL | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 6.0 Million TPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | No.13016/19/2009-CA-I | (b)Date of Approval | 12 Oct 2009 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 460 | (f)Approved Capacity | 6000000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 189.82 | (b)Mineable Reserves (Million Ton) | 170.83 | (c)Extractable Reserves(Million Ton) | 139.65 | (d)Percent(%) of Extraction | 0.81 | (e)Grade of Coal /Ore /Mineral | F | (f)Stripping Ratio | 2.15m3 : 1 T | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 1 in 9 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 30 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 12 | (c)Thickness of seams to be worked on | 12 | (d)Maximum Thickness of Seams (metres) | NA | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 460 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 07 Oct 2016 | (iii)Validity of LOI | 30 | (iv)Reference No. of LOI | 103/04/2016/NA | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 460 | (iii)Validity of the lease deed | From : 07 Oct 2016 To : 06 Oct 2046 | (iv)Date of Execution of Mining Lese | 28 Aug 2018 | (v)Reference Number | F. No. 43015/34/2017–LA & IR | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | land acquisition done under CBA act 1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.5 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.5 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 4 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 350 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | By Dumper | (b)Surface to Siding/Loading | By Dumper | (c)Transportation / Conveyor Details | Transport by Road upto nearest available Railway s | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 235.24 | 0 | 235.24 | (2.) | WASTE LAND | | 62.37 | 0 | 62.37 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | FOREST LAND | | 162.39 | 0 | 162.39 | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 460 | 0 | 460 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 330 | 12 | 8 | | 350 | (2.) | ROADS | | 3 | 0 | 4 | | 7 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | Other | safety zone | 16 | 0 | 0 | | 16 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 7 | 0 | 3 | | 10 | (7.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (8.) | EXTERNAL OB DUMPS | | 63 | 0 | 0 | | 63 | (9.) | GREEN BELT | | 4 | 10 | 0 | | 14 | |
TOTAL | 423 | 22 | 15 | 0 | 460 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 30 | (b)Internal Dump(in hectare) | 350 | (c)Quarry(in hectare) | 350 | (d)Safety Zone(in hectare) | 16 | (e)Final Void of 4 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1600 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 427.67 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0091 | (ii)Name of the EIA Consultant | Overseas Min-Tech Consultants | (iii)Address | 501, 5th Floor, apex tower, Tonk road, Jaipur | (iv)Mobile No. | 9460221084 | (v)Landline No. | 0141274450 | (vi)Email Id | arun.omtc@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 31 Jul 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Pls clarify and comments on the following
a. status for forest land of 162.39as in form-2 - it is written as FC yet to be applied
b. Kindly provide list of attendees with signature during PH and advertisement deatils in english newspaper
c. QCI Accredition certificate of EIA/EMP Consultant
d. Conservation plan for schedule-I species has no clarity (not properly visible). Kindly provide the conservation plan report with approval letter with clarity
e. River passing through the coal block- Any plan for diversion and approval for the same (if any)- what is the distant from quarry and OB dump
f. In Form-2 Sr. 21- details of total land is not similar (as mentioned in EIA report). pls correct
g. In Form-2 Details of OB , Final mine void, are not filled
h. Mine Plan is approved for M/s Tubed coal mine limited not M/s DVC. Pls justify
i. permission from ground water authority for extraction of ground water | 21 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 28 Nov 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Damodar Valley Corporation | Designation | Ferm | Name of Company (Applicant Name should not be given here) | MS DAMODAR VALLEY CORPORATION | Address | D.V.C. Tower,V.I.P Road, Kolkata |
|