Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance for the proposed 1200 MT/day (396000 MT/annum) Cement Plant to be located at village Bhatayan, Khrew, Tehsil Pampore, District Pulwama, Jammu and Kashmir
(b)Name of the Company / Organisation KASHMIR CEMENTS
(c)Registered Address Village Bhatayan Khrew, Tehsil Pampore, District Pulwama, J & K,,Pulwama,Jammu and Kashmir-191103
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ovaice Ishaq Zaroo
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Kashmir Cements, Navai Subha Complex, 1st Floor, Zero Bridge, Srinagar,,Srinagar,Srinagar,Jammu and Kashmir-190008
(d)Pin code 190008
(e)E-mail kashmircement.sgr@gmail.com
(f)STD Code. 194(f)Telephone No. 2434916
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity3(b) Cement plants
(b)Category A
(c)Proposal Number IA/JK/IND/76457/2018
(d)Master Proposal Number(Single Window) SW/121339/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khewat No : 211, Khasra No. : 3226 Khatoni No : 15
(b)Pincode 191103
(c)Bounded Latitudes (North)
From
Degree 34.05211
Minutes
Second
From
Degree 35.05322
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.01749
Minutes
Second
From
Degree 75.01954
Minutes
Second
(e)Survey of India Topo Sheet No. 43J/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1894
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 11
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirPulwamaPampore
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/269/2018-IA-II(I)
(b)Date of Apply of TOR 28 Aug 2018
(c)Date of Issue of TOR / Standard ToR 09 Oct 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 May 2019
Distance of Public Hearing Venue from the Proposed Project :10
Town Hall, Pampore
State :Jammu and Kashmir
District :Pulwama
Tehsil :Pampore
Village :Pampore
250The major issues raised during the public hearing was employment of local youth and pollution control problems due to the existing cement factories of the areaOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Rotary Kiln based Ordinary Portland Cement Plant1200 TPD (396000 TPA) Cement Plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ordinary Portland Cement396000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 146.98
(b) Funds Allocated for Environment Management (Capital) (in Crores) 8.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 485000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 485000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone485000Tons per AnnumLocally AvailableRoad10 Open MarketCopy of Linkage
(2.)Clay99000Tons per Annumopen marketRoad100 Open MarketCopy of Linkage
(3.)Coal81000Tons per AnnumCoal SuppliersRoad1500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube10.25.41080
(2.)PM10Micro Gram per Meter Cube713270100
(3.)NOxMicro Gram per Meter Cube23.49.82380
(4.)PM2.5Micro Gram per Meter Cube39183960
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.290.2111.5
(2.)pHNA7.467.266.5.8.56.5.8.5
(3.)TDSmg/l3543095002000
(4.)Total Hardnessmg/l145118200600
(5.)Chloridesmg/l57.244.62501000
(6.)Heavy MetalsTotal Chromiummg/l000.050.05
(7.)TSSmg/l000105
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA00B
(2.)pHNA00B
(3.)BODNA00B
(4.)CODNA00B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.942.275
(2.)Leq(Night)A-weighted decibels(dB(A))47.837.370
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityParts per Million574492
(2.)P(Phosphorus)Kilogram per hectare3.52.3
(3.)pH8.197.48
(4.)N(Nitrogen)Percent0.0290.023
(5.)K(Potassium)Milligram per Kilogram5.23.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 2.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater400Copy of Permission LetterPipelineTube Well13416 Oct 201940
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic910Septic TankGreen Belt Renewal Plant9
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)wastes from pollution control devicesIndustrial Waste50Tons0Pipe ConveyorCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.71.83.714.580
(2.)PM2.5Microgram per Meter Cube391.59.648.760
(3.)NOxMicrogram per Meter Cube23.41.72.425.980
(4.)PM10Microgram per Meter Cube711.29.680.7100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stack Emissions from Kiln furnaceCoal/Petcoke301.5PM1050
(2.)Stack Emissions from Kiln furnaceCoal/Petcoke301.5SO23.1
(3.)Stack Emissions from Kiln FurnaceCoal/Petcoke301.5NOx4.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9000
(b)Source Jammu and Kashmir State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 2500 KVA D G Sets
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.89
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.89
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 3.89
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Land for Industrial Use 0
    Total (ha.) 3.89
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.5
(2.)Green belt1.39
Total (ha.) 3.89
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNot applicalbe0N A
(2.)ESAsDachigam National Park3.37Wildlife National Park
(3.)WLSDachigam National Park3.37Wildlife National Park
(4.)NPANot applicalbe0N A
(5.)ESZsDachigam National Park3.37Wildlife National Park
(6.)Critically Polluted AreaNot applicalbe0N A
(7.)CorridorsNot applicalbe0N A
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Applicable0N A
(2.)Defence InstallationsKhrew Battle School5Defence Installation
(3.)ForestKhrew Conservation Reserve1.2Forests
(4.)OthersWildlife National ParkDachigam National Park3.37Wildlife National Park
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.89
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 30
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.3
(b)Percentage of Total Project Area 33.42
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 2000000.00
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will give employment to the youth. Besides this, cement at cheaper price will be available in the area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA 0018
(ii)Name of the EIA Consultant Enviro Infra Solutions Pvt. Ltd.
(iii)Address 301, 302, 305, SRBC, Plot no. INS 12, Sector 9,, Vasundhara, Ghaziabad
(iv)Mobile No. 9814087586
(v)Landline No. 0120415118
(vi)Email Id jain_yp@yahoo.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following: EIA report submitted is not line with the QCI/NABET norms. It is requested to re-submit the EIA report as per norms including declaration by the functional area experts and EIA coordinator followed by content and structure of report as prescribed at Appendix iii of the EIA Notification, 2006. 08 Nov 2019
2.NAThe correction have been made as per the instruction received 15 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantOvaice Ishaq Zaroo
DesignationPartner
Name of Company (Applicant Name should not be given here)KASHMIR CEMENTS
AddressVillage Bhatayan Khrew, Tehsil Pampore, District Pulwama, J & K
Print