1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Grain/Molasses based Distillery Plant (90 KLPD to 150 KLPD) & Co-generation Power Plant (3.0 MW to 5.0 MW) by adding 60 KLPD Molasses based Ethanol Plant along with 2 MW Co-generation Pow | (b)Name of the Company / Organisation | PICCADILY AGRO INDUSTRIES LIMITED | (c)Registered Address | Chandigarh Technology Park DLF Building Tower D Third Floor Chandigarh U.T.,,Karnal,Haryana-160101 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Chander Bhan Tiwari | (b)Designation (Owner/ Partner/ CEO) | President | (c)Address | Piccadily Agro Inds. Ltd Village Bhadson Tehsil Indri Distt. Karnal Haryana,,Indri,Karnal,Haryana-132001 | (d)Pin code | 132001 | (e)E-mail | presidentdistillerypail@gmail.com | (f)STD Code. | 172(f)Telephone No. | 271859 | (g)Fax No. | 4660995 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HR/IND2/28750/2008 | (d)Master Proposal Number(Single Window) | SW/121235/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1,2,10,9,8,3,11,86/12,13,14,15,20,19,18,17,16,21,2 | (b)Pincode | 132117 | (c)Bounded Latitudes (North) | | From | | Degree | 29.90111111 | Minutes | | Second | | From | | Degree | 29.90944444 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.97777778 | Minutes | | Second | | From | | Degree | 76.98222222 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53C/13, 53G/1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 265 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Haryana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Chhindwara | Sausar | Khapakarimwar | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | F. No. J-11011/495/2008- IA II (I) | (c)Date of Issue of TOR | 29 May 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 14 Oct 2019 | (c)Date of Issue of EC | 13 Feb 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 25 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Plant Site | State : | Haryana | District : | Karnal | Tehsil : | Indri | Village : | Bhadson |
| 139 | Employment, CSR activities
in nearby areas, maintenance of ponds, Odour problem, pollution | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chandigarh | (iii)Letter No. | 4-220/2006-RO (NZ)/849 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 19 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | ENA/RS/Ethanol, Malt Spirits & IMFL/CL Bottling | 90 | 60 | 150 | Kilo Litre per Day(KLD) | | Road | | (2.) | Power | 3 | 2 | 5 | Mega Watt(MW) | | Others | Cables | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Distillery | 90 KLPD Grain / Molasses based | 60 KLPD Molasses Based | 150 KLPD Grain & Molasses Based | | (2.) | Co-generation Power Plant | 3 MW | 2 MW | 5 MW | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 21 Oct 2016 | (iv)Valid Upto | 30 Sep 2020 | (v)File No. | 313106516KARCTOHWM2633364 | (vi)Application No. | 313106516KARCTO2633364 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 47 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.47 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 124080 | (b)Existing quantity of raw material/fuel | 133320 | (c)Total quantity of raw material/fuel | 257400 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Grains – Maize, jowar, broken rice | 77700 | Tons per Annum | | Open Market | Road | | 1000 | Open Market | | Copy of Linkage | (2.) | Molasses as raw material for distillery | 81000 | Tons per Annum | | Own & Nearby Sugar Mills | Road,Pipe Conveyor | | 200 | Others | Own & Nearby Sugar Mills | Copy of Linkage | (3.) | bio fuel as rice husk/bagasse | 91000 | Tons per Annum | | Open Market | Road | | 200 | Open Market | | Copy of Linkage | (4.) | Biogas | 864000 | Others | Cubic meter per annum | Own plant | Others | Pipe line | 0 | Captive | | Copy of Linkage | (5.) | Barley for malting | 7700 | Tons per Annum | | Through Suppliers | Road | | 500 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 18.6 | 6.7 | 17.82 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 26.4 | 11.8 | 26.04 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 91.4 | 59.2 | 91.1 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 49.5 | 26.1 | 49.14 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 66.23 | 24.5 | 250 | 1000 | (2.) | pH | | | NA | | 7.71 | 7.08 | 6.5 | 8.5 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 560 | 201 | 500 | 2000 | (5.) | Total Hardness | | | mg/l | | 380.72 | 112.36 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 0.67 | 0.15 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 0 | 0 | E | (2.) | DO | | mg/l | | 0 | 0 | E | (3.) | BOD | | mg/l | | 0 | 0 | E | (4.) | COD | | mg/l | | 0 | 0 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.9 | 38.1 | Industrial 70, Commercial 55 & Residential 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.4 | 49.8 | Industrial 75, Commercial 65 & Residential 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.29 | 7.91 | (2.) | N(Nitrogen) | Kilogram per hectare | | 228.87 | 103.44 | (3.) | P(Phosphorus) | Kilogram per hectare | | 28.12 | 10.67 | (4.) | K(Potassium) | Kilogram per hectare | | 276.5 | 125.3 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.23 | 0.16 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 21.16 To 4.18 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.68 To 22.22 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1415 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4(39)/NWR/CGWA/2006-816 | 14 May 2015 | 1427 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 543 | 700 | ETP (anaerobic, aerobic, filters and RO) | Reuse within the Plant & Recycling | | 543 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 543 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 543 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Bio Compost | Others | By-product | 7680 | Tons | 100 | Road | | Others | Given to farmers | (2.) | Ash | Fly Ash | | 16380 | Tons | 100 | Road | | Others | Bio-composting & brick manufacturers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 86.8 | 0.7 | 0 | 87.849 | 100 | (2.) | NOx | | Microgram per Meter Cube | 24.6 | 0.7 | 0 | 26.47 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 47.8 | 0.7 | 0 | 48.37 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 15.9 | 0.7 | 0 | 16.78 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Proposed 25 TPH Boiler | Rice Husk/Bagasse & Biogas | 35 | 1.5 | PM10 | | 30 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 5250 | (b)Source | Own 5 MW Co-gen Power plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2x500 KVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 28.3 | Total Land (ha.) | 28.3 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 29625.69 | (b)Waste/Barren Land (ha.) | 1760.33 | (c)Grazing/ Community Land (ha.) | 232.53 | (d)Surface Water Bodies (ha.) | 778.32 | (e)Settlements (ha.) | 1125.58 | (f)Industrial (ha.) | 226.46 | (g)Forest (ha.) | 190.63 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : No | 0 | Total (ha.) | 33939.53999999999 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 3.5 | Main Plant and Utilities | (2.) | Green belt | | 9.3 | | (3.) | Others | Biocomposting & open area | 15.5 | Biocomposting & open area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | No WLS within 10 km radius | (2.) | NPA | Not Applicable | 0 | No NPA within 10 km radius | (3.) | ESZs | Not Applicable | 0 | No ESZ within 10 km radius | (4.) | Corridors | Not Applicable | 0 | No Corridors within 10 km radius | (5.) | ESAs | Not Applicable | 0 | No ESA within 10 km radius | (6.) | Wildlife Corridors | Not Applicable | 0 | No Wildlife Corridors within 10 km radius | (7.) | Critically Polluted Area | Not Applicable | 0 | No CPA within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Not Applicable | 0 | No Archaeological sites within 10 km radius | (2.) | Defence Installations | | Not Applicable | 0 | No defence installations within 10 km radius | (3.) | Forest | | Bir Seonti Reserved Forest | 7.5 | North Direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 28.3 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chautang Nadi – Seasonal | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 2.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 1 | (b)Permanent Employment-During Operation | 190 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 350 | (f)Total Manpower | 311 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 9.3 | 0 | 9.3 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 13700 | 1500 | 15200 | (4.) | Funds Allocated | 2500000 | 1000000 | 3500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The project will help fulfilling the demand for ETHANOL | (2.) | Social | Employment generation & CER Activities | (3.) | Financial | Improved Livelihood with increased business opportunities & revenue generation for the State Govt | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J M EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001 | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Chander Bhan Tiwari | Designation | President | Name of Company (Applicant Name should not be given here) | PICCADILY AGRO INDUSTRIES LIMITED | Address | Chandigarh Technology Park DLF Building Tower D Third Floor Chandigarh U.T. |
|