Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Grain/Molasses based Distillery Plant (90 KLPD to 150 KLPD) & Co-generation Power Plant (3.0 MW to 5.0 MW) by adding 60 KLPD Molasses based Ethanol Plant along with 2 MW Co-generation Pow
(b)Name of the Company / Organisation PICCADILY AGRO INDUSTRIES LIMITED
(c)Registered Address Chandigarh Technology Park DLF Building Tower D Third Floor Chandigarh U.T.,,Karnal,Haryana-160101
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Chander Bhan Tiwari
(b)Designation (Owner/ Partner/ CEO) President
(c)Address Piccadily Agro Inds. Ltd Village Bhadson Tehsil Indri Distt. Karnal Haryana,,Indri,Karnal,Haryana-132001
(d)Pin code 132001
(e)E-mail presidentdistillerypail@gmail.com
(f)STD Code. 172(f)Telephone No. 271859
(g)Fax No. 4660995
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/IND2/28750/2008
(d)Master Proposal Number(Single Window) SW/121235/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1,2,10,9,8,3,11,86/12,13,14,15,20,19,18,17,16,21,2
(b)Pincode 132117
(c)Bounded Latitudes (North)
From
Degree 29.90111111
Minutes
Second
From
Degree 29.90944444
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.97777778
Minutes
Second
From
Degree 76.98222222
Minutes
Second
(e)Survey of India Topo Sheet No. 53C/13, 53G/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 265
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshChhindwaraSausarKhapakarimwar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number F. No. J-11011/495/2008- IA II (I)
(c)Date of Issue of TOR 29 May 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 14 Oct 2019
(c)Date of Issue of EC 13 Feb 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0
Plant Site
State :Haryana
District :Karnal
Tehsil :Indri
Village :Bhadson
139Employment, CSR activities in nearby areas, maintenance of ponds, Odour problem, pollutionOthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 4-220/2006-RO (NZ)/849
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 19 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ENA/RS/Ethanol, Malt Spirits & IMFL/CL Bottling9060150Kilo Litre per Day(KLD)Road
(2.)Power325Mega Watt(MW)OthersCables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery90 KLPD Grain / Molasses based60 KLPD Molasses Based150 KLPD Grain & Molasses Based
(2.)Co-generation Power Plant3 MW2 MW5 MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Oct 2016
(iv)Valid Upto 30 Sep 2020
(v)File No. 313106516KARCTOHWM2633364
(vi)Application No. 313106516KARCTO2633364
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 47
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.47
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 124080
(b)Existing quantity of raw material/fuel 133320
(c)Total quantity of raw material/fuel 257400
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Grains – Maize, jowar, broken rice77700Tons per AnnumOpen MarketRoad1000 Open MarketCopy of Linkage
(2.)Molasses as raw material for distillery81000Tons per AnnumOwn & Nearby Sugar MillsRoad,Pipe Conveyor200 OthersOwn & Nearby Sugar MillsCopy of Linkage
(3.)bio fuel as rice husk/bagasse91000Tons per AnnumOpen MarketRoad200 Open MarketCopy of Linkage
(4.)Biogas864000OthersCubic meter per annumOwn plantOthersPipe line0 CaptiveCopy of Linkage
(5.)Barley for malting7700Tons per AnnumThrough SuppliersRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.66.717.8280
(2.)NOxMicro Gram per Meter Cube26.411.826.0480
(3.)PM10Micro Gram per Meter Cube91.459.291.1100
(4.)PM2.5Micro Gram per Meter Cube49.526.149.1460
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l66.2324.52501000
(2.)pHNA7.717.086.58.5
(3.)TSSmg/l0000
(4.)TDSmg/l5602015002000
(5.)Total Hardnessmg/l380.72112.36200600
(6.)Fluoridemg/l0.670.1511.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)DOmg/l00E
(3.)BODmg/l00E
(4.)CODmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))53.938.1Industrial 70, Commercial 55 & Residential 45
(2.)Leq(Day)A-weighted decibels(dB(A))63.449.8Industrial 75, Commercial 65 & Residential 55
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.297.91
(2.)N(Nitrogen)Kilogram per hectare228.87103.44
(3.)P(Phosphorus)Kilogram per hectare28.1210.67
(4.)K(Potassium)Kilogram per hectare276.5125.3
(5.)Electric ConductivityMillisiemens per Centimetre0.230.16
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 21.16 To 4.18
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.68 To 22.22
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater14150Copy of Permission LetterPipelineTube Well21-4(39)/NWR/CGWA/2006-81614 May 20151427
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial543700ETP (anaerobic, aerobic, filters and RO)Reuse within the Plant & Recycling543
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 543
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 543
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Bio CompostOthersBy-product7680Tons100RoadOthersGiven to farmers
(2.)AshFly Ash16380Tons100RoadOthersBio-composting & brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube86.80.7087.849100
(2.)NOxMicrogram per Meter Cube24.60.7026.4780
(3.)PM2.5Microgram per Meter Cube47.80.7048.3760
(4.)SO2Microgram per Meter Cube15.90.7016.7880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Proposed 25 TPH BoilerRice Husk/Bagasse & Biogas351.5PM1030
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5250
(b)Source Own 5 MW Co-gen Power plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x500 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 28.3
    Total Land (ha.) 28.3
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 29625.69
(b)Waste/Barren Land (ha.) 1760.33
(c)Grazing/ Community Land (ha.) 232.53
(d)Surface Water Bodies (ha.) 778.32
(e)Settlements (ha.) 1125.58
(f)Industrial (ha.) 226.46
(g)Forest (ha.) 190.63
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : No 0
    Total (ha.) 33939.53999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.5Main Plant and Utilities
(2.)Green belt9.3
(3.)OthersBiocomposting & open area15.5Biocomposting & open area
Total (ha.) 28.3
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0No WLS within 10 km radius
(2.)NPANot Applicable0No NPA within 10 km radius
(3.)ESZsNot Applicable0No ESZ within 10 km radius
(4.)CorridorsNot Applicable0No Corridors within 10 km radius
(5.)ESAsNot Applicable0No ESA within 10 km radius
(6.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(7.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(2.)Defence InstallationsNot Applicable0No defence installations within 10 km radius
(3.)ForestBir Seonti Reserved Forest7.5North Direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 28.3
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chautang Nadi – Seasonal
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1
(b)Permanent Employment-During Operation 190
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 100
(e)No. of working days 350
(f)Total Manpower 311
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt9.309.3
(2.)Percentage of Total Project Area33033
(3.)No. of Plants13700150015200
(4.)Funds Allocated250000010000003500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe project will help fulfilling the demand for ETHANOL
(2.)SocialEmployment generation & CER Activities
(3.)FinancialImproved Livelihood with increased business opportunities & revenue generation for the State Govt
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J M EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChander Bhan Tiwari
DesignationPresident
Name of Company (Applicant Name should not be given here)PICCADILY AGRO INDUSTRIES LIMITED
AddressChandigarh Technology Park DLF Building Tower D Third Floor Chandigarh U.T.
Print