Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Production of Masonry Stone & Soapstone at Mining Lease (M.L. No. 19/2001 area: 4.9893 ha) of M/s Balaji Stone Mines & Minerals
(b)Name of the Company / Organisation M/S BALAJI STONE MINES& MINERALS
(c)Registered Address Ward no. 12, Asthalok colony , REECO,Jhunjhunun,,Jhunjhunu,Rajasthan-333001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Narendar kumar sunda
(b)Designation (Owner/ Partner/ CEO) authorizedsignatory
(c)Address Ward no. 12, Asthalok colony, REECo, Jhunjhunu,,Jhunjhunun,Jhunjhunu,Rajasthan-333001
(d)Pin code 333001
(e)E-mail balajimines086@gmail.com
(f)STD Code. 141(f)Telephone No. 2751990
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category B2
   Reason for Applying at Ministry general
(c)Proposal Number IA/RJ/MIN/121118/2018
(d)Master Proposal Number(Single Window) SW/121116/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Production of Masonry Stone & Soapstone Mining Le
(b)Pincode 332703
(c)Bounded Latitudes (North)
From
Degree 27.202415
Minutes
Second
From
Degree 27.202501
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.134691
Minutes
Second
From
Degree 75.135247
Minutes
Second
(e)Survey of India Topo Sheet No. 45M/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 70
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 20
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number DIA/DEAC/Project/Cat-604
(b)Date of Apply of TOR 19 Dec 2018
(c)Date of Issue of TOR / Standard ToR 14 Oct 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason B2 category lease
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Mining lease of B2Mining leasena
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Soap Stone & Masonry Stone604660Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 31 Jan 2017
(iv)Valid Upto 30 Jan 2022
(v)File No. 109(1)/2009-2010/2486-2487
(vi)Application No. 2016-2017/Sikar/4482
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.50
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.008
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0085
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.008
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 604660
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 604660
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Deisel200Othersliters per dayNARoad0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 29 Jul 2019 To 31 Jul 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube78.278.076.636is:5182
(2.)PM2.5Micro Gram per Meter Cube38.338.337.534Gravimatric methord
(3.)SO2Micro Gram per Meter Cube20.720.720.286IS: 5182( PART-2)
(4.)NOxMicro Gram per Meter Cube30.330.329.694IS: (PART)-6
(5.)OthersNaMicro Gram per Meter Cube0000
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.257.256.58.5
(2.)TDSmg/l355.4355.45002000
(3.)Total Hardnessmg/l163.7163.7200600
(4.)Chloridesmg/l26.826.82501000
(5.)OthersTurbudityOthersNTU1111
(6.)Heavy MetalsTotal Alkalinitymg/l119.2119.2200600
(7.)Fluoridemg/l0.50.51.51.5
(8.)TSSOthersNTU1111
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODNA00B
(2.)CODNA00B
(3.)pHNA00A
(4.)DONA00A
(5.)OthersnaNA00B
    14.4.     No. of Ambient Noise monitoring locations : 0
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.270.275/90
(2.)Leq(Night)A-weighted decibels(dB(A))56.256.270
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram79.279.2
(2.)Electric ConductivityOthersMMHO/CM352.5352.5
(3.)pH7.277.27
(4.)N(Nitrogen)OthersNA00
(5.)P(Phosphorus)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 70 To 75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 65 To 70
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTankers5.01.0Copy of Permission LettermodeOthersNAOthersTankers031 Jul 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Effluent0.350.35Septic tank Soak PitOthersPlantation00.35
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.35
(b)Total Discharged Water (Kilolitre per Day) 0.35
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ob & wasteOtherswaste604660Tons0OthersNaOthersHaul Road Construction
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2NA00010
(2.)Others(Specify)NaNA00010
(3.)PM2.5NANA00010
(4.)NOxNA00010
(5.)PM10NA00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 4.9893
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4.9893
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Quarry, unused ,plantation dumps 4.9893
    Total (ha.) 4.9893
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersNa00
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsRupgarh6NW
(2.)ESAsDanta Ramgarh5sw
(3.)Corridors000
(4.)NPAna00
(5.)Wildlife Corridorsna00
(6.)WLSna00
(7.)Critically Polluted Areana00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesBadla BIR PF14.0sw
(2.)Defence InstallationsNA00
(3.)Forestna00
(4.)Othersna000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 20
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.64
(b)Percentage of Total Project Area 32.87
(c)No. of Plants to be Planted 25000
(d)Funds Allocated for Plantation 1640
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialcsr
(2.)EnvironmentalGreen Belt & Plantation
(3.)FinancialRevinue
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Soap StoneMinor
(2.)masonry stoneMinor
2.
Mine Capacity in ROM (Run of Mine) 604660
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 0000
(b)Date of Approval 07 Oct 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Mines
(e)Approved Mining Lease Area 4.9893
(f)Approved Capacity 604660
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1.36
(b)Mineable Reserves (Million Ton) 0.560
(c)Extractable Reserves(Million Ton) 0.604
(d)Percent(%) of Extraction 99
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 1 : 1000
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 0
(h)Average Gradient(Degree) 1
(i)Mining Method Opencast
(j)Life of Mine (Years) 11
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.9893
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 12 May 2014
(iii)Validity of LOI 50
(iv)Reference No. of LOI 19/2001
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 4.9893
(iii)Validity of the lease deed From : 12 May 2014 To : 11 May 2064
(iv)Date of Execution of Mining Lese 16 Jul 2019
(v)Reference Number 19/2001
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof na
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.001
(iii)Height (in meter) 0.1
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 1.00 (hectare) at a Depth of 15 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 2.67
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)WASTE LAND000
(3.)OTHERS(Specify)Pits, qurries etc.4.949304.9493
(4.)FOREST LAND000
(5.)GRAZING LAND000
(6.)SURFACE WATER BODIES000
(7.)SETTLEMENTS000
TOTAL4.949304.9493
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)Otherna0000
(2.)EXTERNAL OB DUMPS0000
(3.)INTERNAL OB DUMPS0000
(4.)GREEN BELT1.64001.64
(5.)EXCAVATION/QUARRY02.6702.67
(6.)VIRGIN AREA000.62930.6293
(7.)TOP SOIL STORAGE0000
(8.)BUILT UP AREA (COLONY/OFFICE)000.050.05
(9.)ROADS0000
TOTAL1.642.670.679304.9893
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 1
(c)Quarry(in hectare) 2.67
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 330
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 640
(h)Total afforestation plant (in hectare) 0.33
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)604660604660604660604660604660604660
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant na
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe instant proposal is the category B as per the EIA notification, 2006 kindly apply your proposal in concern SEIAA/SEAC. 08 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarendar kumar sunda
Designationauthorizedsignatory
Name of Company (Applicant Name should not be given here)M/S BALAJI STONE MINES& MINERALS
AddressWard no. 12, Asthalok colony , REECO,Jhunjhunun
Print