1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | ‘Lakhpat Cement Works’ (An Integrated Cement Project - Cement Plant Clinkerization Plant,each of 10 MTPA production capacity with Captive Power Plant of 99MW, Limestone Mine for 12MTPA with lease are | (b)Name of the Company / Organisation | ADANI CEMENTATION LIMITED | (c)Registered Address | Adani House,
56 Srimali Society, Navrangpura,Ahmedabad,Ahmedabad,Gujarat-380009 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjay Prasad | (b)Designation (Owner/ Partner/ CEO) | AGM | (c)Address | Adani Cementation Limited, Ground Floor, South Wing, Adani Coporate House,Shantigram, S.G. Highway,
Ahmedabad,,Ahmedabad,Gujarat-382421 | (d)Pin code | 382421 | (e)E-mail | sanjay.prasad@adani.com | (f)STD Code. | 79(f)Telephone No. | 25558623 | (g)Fax No. | 07925557401 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/MIN/70787/2017 | (d)Master Proposal Number(Single Window) | SW/121094/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Pvt. Land: 8P/1, 8P/2, 8P/9, 18P/3, 26P/7, 26P/8, | (b)Pincode | 370627 | (c)Bounded Latitudes (North) | | From | | Degree | 2622387.757 | Minutes | | Second | | From | | Degree | 2624886.005 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 469188.168 | Minutes | | Second | | From | | Degree | 470578.944 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41A/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 27 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | kutch | Lakhpat | | (2.) | Madhya Pradesh | Chhindwara | Sausar | Khapakarimwar | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/121/2017-IA-II(M) | (b)Date of Apply of TOR | 12 Nov 2017 | (c)Date of Issue of TOR / Standard ToR | 09 Jan 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 May 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| Village Koriyani | State : | Gujarat | District : | kutch | Tehsil : | Lakhpat | Village : | Koriyani |
| 553 | Related to public health, hospital facility, women empowerment, problem of air pollution and water pollution and employment and land compensation | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Limestone Mine | Production 12MTPA and Area 251.9 ha | Limestone Mining | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 12 | Others | MTPA | Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7525 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 107 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 46 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Others | NA | NA | Others | NA | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 32.9 | 20.2 | 32.9 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 75.2 | 57.4 | 75.1 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 18.8 | 5.3 | 18.7 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 19.9 | 7.1 | 19.9 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 0.85 | 0.48 | 0.85 | 2 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (2.) | Chlorides | | | mg/l | | 548 | 253 | 250 | 1000 | (3.) | pH | | | NA | | 7.4 | 7.1 | 6.5 | 8.5 | (4.) | Total Hardness | | | mg/l | | 600.6 | 309.7 | 300 | 600 | (5.) | Fluoride | | | mg/l | | 0.48 | 0.29 | 1 | 1.5 | (6.) | TDS | | | mg/l | | 1570 | 830 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.4 | 4.3 | C | (2.) | BOD | | mg/l | | 2.4 | 0.8 | C | (3.) | pH | | NA | | 8.1 | 7.5 | C | (4.) | COD | | mg/l | | 38.4 | 20.3 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.4 | 41.4 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.9 | 32.7 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.84 | 7.34 | (2.) | Electric Conductivity | Others | microsiemens per Centimeter | 985 | 732 | (3.) | P(Phosphorus) | Kilogram per hectare | | 42.3 | 21.8 | (4.) | K(Potassium) | Kilogram per hectare | | 79.5 | 48.2 | (5.) | N(Nitrogen) | Kilogram per hectare | | 145 | 87 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | CGWA/NOC/MIN/ORIG/2019/5864 | (f)Date of Issue | 13 Aug 2019 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 250 | 12 | Copy of Permission Letter | Pipeline | | Intake Well | | 1 | 26 Nov 2018 | 30000 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 9000 | (c)Quantity of Brine (KLD) | 21000 | (d)Mode of Disposal of Brine | Brine would return to the designated outfall point | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic use | 15 | 15 | MBBR Technology | Green Belt Renewal Plant | | 15 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 15 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 15 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Overburden | Others | Overburden | 3000000 | Tons | 2 | Others | By road within mining lease area | Others | Concurrent Reclamation | (2.) | Top Soil | Others | Top Soil | 48000 | Tons | 2 | Others | By road within mining lease area | Others | For afforestation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.001 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 64.7 | 0 | 108.6 | 173.4 | 100 | (3.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0.001 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.001 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1000 | (b)Source | Captive Power Plant/ Grid Power from Dayapar | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | Not Required | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 91.2762 | (c)Government Land (ha.) | 160.6238 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 251.9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 8794.58 | (b)Waste/Barren Land (ha.) | 5400.67 | (c)Grazing/ Community Land (ha.) | 18835.90 | (d)Surface Water Bodies (ha.) | 11401.96 | (e)Settlements (ha.) | 434.39 | (f)Industrial (ha.) | 95.25 | (g)Forest (ha.) | 3332.33 | (h)Mangroves (ha.) | 1493.24 | (i)Marine Area (ha.) | 769.30 | (j)Others (ha.) : Mining Activities, sandy area and mud land | 12873.78 | Total (ha.) | 63431.4 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Limestone Mining | 251.9 | Mining of Limestone | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Narayan Sarovar Wildlife Sanctuary | 3.4 | South from Mining Lease Area | (2.) | Critically Polluted Area | NA | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | Wildlife Corridors | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | ESAs | NA | 0 | NA | (7.) | ESZs | ESZ of Narayan Sarovar Wildlife Sanctuary | 2.4 | South from Mining Lease Area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | Waterbody | Kapurasi Nadi | 2 | Direction- W | (2.) | Archaeological Sites | | Lakhpat Fort | 12.2 | Towards NE beyond 10Km from Mining Block | (3.) | Forest | | Mudhvay RF | 0.05 | Direction- S & E | (4.) | Defence Installations | | BSF Camp | 9.0 | West of Mining Lease Area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Not in Mining Lease Area | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 512 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 23 | (b)Land yet to be acquired(Ha) | 228.9 | (c)Status of Land acquisition if not acquired | Government land acquisition is under process at Co | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 3 | (b)No. of Households | 131 | (c)No. of PDFs (Project Displaced Families) | 17 | (d)No. of PAFs (Project Affected Families) | 154 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 992.863 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Black shoulder kite, Indian Peafowl, Montagu's Harrier, Pallid Harrier and Shikra | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 5.25 crore | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kapurasi Nadi | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 600 | (d)Temporary Employment- During Operation | 450 | (e)No. of working days | 300 | (f)Total Manpower | 1230 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 83.5 | (b)Percentage of Total Project Area | 33.15 | (c)No. of Plants to be Planted | 125250 | (d)Funds Allocated for Plantation | 140000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | At the conceptual stage, out of the total mining lease area (i.e. 251.9 ha), total mined-out area will be 163.5 ha which will be reclaimed & rehabilitated by converting into water reservoir. At end of life of mine, about, 83.5 ha area will be under greenbelt & plantation which will be beneficial to the environment & will provide an aesthetic look. Hence conceptual land use will be better than present land use. The water reservoir will be helpful for recharge of ground water. About 64 ha. Sparse | (2.) | Financial | The project has positive employment and income effects, both direct as well as indirect. Manpower is
required for mining operations, plant operations, jetty operations and manning of ships as well as other
related activities such as transportation for day to day operations etc. The impact of the project on the
economic aspects can be clearly observed. | (3.) | Social | The company has undertaken and will continue undertake activities for the upliftment of the social community through community development. The CSR (Adani Foundation) arm operates in four chosen areas of Education, Healthcare, Rural Infrastructure and Sustainable Livelihood to bring about progress and prosperity in the communities we impact | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 12 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 684 (4)(1)/MP-84 | (b)Date of Approval | 03 Jan 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 251.9 | (f)Approved Capacity | 12 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 292.5 | (b)Mineable Reserves (Million Ton) | 101.763 | (c)Extractable Reserves(Million Ton) | 101.763 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Cement Grade Limestone | (f)Stripping Ratio | 1 : 0.42 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | NA | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 15 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 251.9 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 21 Jun 2017 | (iii)Validity of LOI | 3 | (iv)Reference No. of LOI | MCR-102016-2146-CHH | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | New Project | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | New Project | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.32 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.32 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 0 | (b)Depth (in meter) | 0 | (c)Volume (in Million Cubic meter) | 0 | |
|
12. | Details of Quarry: | (a)Final Void of 112.3 (hectare) at a Depth of 57 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 112.3 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Haul Road within Pit area | (b)Surface to Siding/Loading | Tipper/Dumpers | (c)Transportation / Conveyor Details | Surface Belt Conveyor from mine to Cement Plant | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 160.6238 | 0 | 160.6238 | (2.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | OTHERS(Specify) | Santhani Land | 91.2762 | 0 | 91.2762 | (6.) | FOREST LAND | | 0 | 0 | 0 | (7.) | AGRICULTURE LAND | | 0 | 0 | 0 | |
TOTAL | 251.9 | 0 | 251.9 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 78.5 | 33.8 | 0 | | 112.3 | (2.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | ROADS | | 0 | 0 | 6 | | 6 | (5.) | Other | Undisturbed area | 0 | 0 | 128.5 | | 128.5 | (6.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (7.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (8.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.1 | | 0.1 | (9.) | GREEN BELT | | 5 | 0 | 0 | | 5 | |
TOTAL | 83.5 | 33.8 | 134.6 | 0 | 251.9 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 112.3 | (d)Safety Zone(in hectare) | 5 | (e)Final Void of 33.8 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 83.5 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0058 | (ii)Name of the EIA Consultant | Greencindia Consulting Private Limited | (iii)Address | 608-611, Shopprix Mall, Sector-5, Vaishali, National Capital Region, Ghaziabad- 201010 (U.P.) | (iv)Mobile No. | 9891906015 | (v)Landline No. | 0120429653 | (vi)Email Id | information@greencindia.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 27 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. Form-2 is not properly filled
2. Whether mine lease area consist of forest land.
3. Public hearing also completed integrated plant.
4. Mining plan not uploaded
5. Copy of accreditation certificate for consultant.
6. Letter of authorization/power of attorney for the project.
7. Validity of mine lease and copy of valid lease document
8. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018
9. Past production details duly authenticated by State mines and Geology
10. Status of mine whether working or not.
11. Copy of Previous EC documents, if any | 08 Nov 2019 | 2. | NA | The correction have been made as per the instruction received | 12 Dec 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Point wise reply to the requisite information raised by MoEFCC vide letter no. J-11015/121/2017-IA.II dated 6th March 2020 with respect to proposal no. IA/GJ/MIN/70787/2017 and ADS raised by MOEFCC dated 25.04.2020
Kindly consider the proposal for appraisal to recommend Environment Clearance at earliest. | 30 Apr 2020 | 2. | NA | deferred
| 25 Apr 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjay Prasad | Designation | AGM | Name of Company (Applicant Name should not be given here) | ADANI CEMENTATION LIMITED | Address | Adani House,