Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Establishment of 10,000 TCD Sugar Factory (scrapping of existing 800 TCD plant), 60 MW Co-gen Plant (50 MW from Co-gen plant & 10 MW from distillery) and 200 KLPD molasses based Distillery by Shivneri
(b)Name of the Company / Organisation SHIVNERI SUGARS LTD.
(c)Registered Address A/p. Ganesh tekadi, Nhavi (Bk.), Tal. Koregaon, Dist. Satara, Maharashtra,,Satara,Maharashtra-415511
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sushant Shrimant Patil
(b)Designation (Owner/ Partner/ CEO) ExecutiveDirector
(c)Address 2nd floor, Shiv Pavillion, Near Ram Mandir, Sangli-Miraj Road, Sangli, Maharashtra,,Miraj,Sangli,Maharashtra-416416
(d)Pin code 416416
(e)E-mail sushant.shivneri@gmail.com
(f)STD Code. 233(f)Telephone No. 2373885
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/78167/2018
(d)Master Proposal Number(Single Window) SW/120982/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S. No. 164, 166, 173, 174, 175, 176, 177, 178, 180
(b)Pincode 416416
(c)Bounded Latitudes (North)
From
Degree 173324.32
Minutes
Second
From
Degree 173351.71
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 741440.26
Minutes
Second
From
Degree 74151.43
Minutes
Second
(e)Survey of India Topo Sheet No. 47K2, 47K3, 47K6, 47K7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 695
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSataraKoregaon
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/277/2018-IA-II(I)
(b)Date of Apply of TOR 07 Sep 2018
(c)Date of Issue of TOR / Standard ToR 12 Oct 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 May 2019
Distance of Public Hearing Venue from the Proposed Project :0
Shivneri Sugars Ltd., Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, MS
State :Maharashtra
District :Satara
Tehsil :Koregaon
Village :Nhavi (Bk.)
69During public hearing issue was raised regarding IEM validity.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Sugar Factory10,000 TCD
(2.)Co-generation Plant60 MW
(3.)Distillery Unit200 KLPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sugar36000OthersMT/MRoad
(2.)Electricity60Mega Watt(MW)OthersGrid
(3.)CO24500OthersMT/MOthersCylinders
(4.)Pressmud12000OthersMT/MRoad
(5.)Molasses12000OthersMT/MRoad
(6.)Bagasse90000OthersMT/MConveyor Belt
(7.)RS / ENA/ Ethanol6000OthersKL/MRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 620
(b) Funds Allocated for Environment Management (Capital) (in Crores) 73
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 7.33
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 10000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lime3240Tons per AnnumLocal VendorRoad20 OthersLocal VendorCopy of Linkage
(2.)Sugar cane1800000Tons per AnnumNear By FarmsRoad35 OthersNear By FarmsCopy of Linkage
(3.)Sulphur1080Tons per AnnumLocal VendorRoad20 OthersLocal VendorCopy of Linkage
(4.)Molasses244530Tons per AnnumOwn Sugar Factory / Outside PurchaseRoad50 OthersOwn Sugar Factory / Outside PurchaseCopy of Linkage
(5.)Urea2640Tons per AnnumLocal VendorsRoad20 OthersLocal VendorCopy of Linkage
(6.)Bagasse720000Tons per AnnumOwn Sugar FactoryConveyor Belt0 OthersOwn Sugar FactoryCopy of Linkage
(7.)Yeast198Tons per AnnumLocal VendorsRoad50 OthersLocal VendorsCopy of Linkage
(8.)De-Foaming Oil7590Tons per AnnumLocal VendorsRoad20 OthersLocal VendorCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube0.160.050.162 (8Hrs)
(2.)PM10Micro Gram per Meter Cube64.9551.0664.91100
(3.)PM2.5Micro Gram per Meter Cube28.7819.7628.1660
(4.)SO2Micro Gram per Meter Cube30.5418.3930.1880
(5.)NOxMicro Gram per Meter Cube34.3325.5734.2180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.847.486.58.5
(2.)Fluoridemg/l0.63011
(3.)TDSmg/l787.27330.90500500
(4.)Total Hardnessmg/l295.04123.88200200
(5.)Chloridesmg/l211.4794.17250250
(6.)TSSmg/l55.1212.64100100
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l3.100.10E
(2.)pHNA7.927.58E
(3.)BODmg/l40.1511.45E
(4.)CODmg/l98.6524.13E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))60.438.970
(2.)Leq(Day)A-weighted decibels(dB(A))69.750.175
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.947.50
(2.)N(Nitrogen)Milligram per Kilogram468.97260.47
(3.)P(Phosphorus)Milligram per Kilogram100.2449.21
(4.)Electric ConductivityMillisiemens per Centimetre1858.161145.77
(5.)K(Potassium)Milligram per Kilogram316.98198.14
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface10619.5Copy of Permission LetterPipelineJack Well0724 Aug 20171500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial (Distillery - Spentwash)15601600Concentrated in MEE followed by IncinerationOthersIncineration15600
(2.)Industrial (Distillery - Other)16401680Treated in Proposed Condensate Polishing Unit (CPU)Reuse within the Plant & Recycling1640
(3.)Domestic (Sugar, Co-gen & Distillery)6775Proposed STPReuse within the Plant & Recycling67
(4.)Industrial (Sugar & Co-gen)565600Proposed ETPOthersIrrigation5650
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3832
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3832
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CPU SludgeIndustrial Waste528Tons0RoadOthersBurnt in Incineration boiler
(2.)Boiler ash (Bagasse)Bottom Ash10800Tons10RoadOthersUsed as manure
(3.)Boiler Ash (Spentwash & Coal)Bottom Ash35970Tons10RoadOthersGiven to brick manufacturers or cement industry
(4.)ETP SludgeIndustrial Waste102Tons10RoadOthersBurnt in Incineration boiler
(5.)Yeast SludgeIndustrial Waste6270Tons0RoadOthersBurnt in Incineration boiler
(6.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons10RoadOthersBurnt in Incineration boiler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube30.182.20.0130.19180
(2.)NOxMicrogram per Meter Cube32.482.030.0132.49180
(3.)PM2.5Microgram per Meter Cube25.372.010.0125.38160
(4.)PM10Microgram per Meter Cube64.912.060.0164.921100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)200 TPH BoilerBagasse - 2400 MT/D906SO230.18
(2.)75 TPH Incineration BoilerSpentwash (320 MT/D) & Coal (216 MT/D)823.2SO230.18
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 23000
(b)Source Own Co-gen plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000 KVA (2 Nos. )
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 20.64
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 20.64
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 12380
(b)Waste/Barren Land (ha.) 1850
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0185
(e)Settlements (ha.) 0970
(f)Industrial (ha.) 0
(g)Forest (ha.) 2070
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land & Open Scrub Land 13960
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area6.80
(2.)Green belt6.87
(3.)OthersOpen Space6.97
Total (ha.) 20.64
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
(2.)ESZsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
(3.)Critically Polluted AreaNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
(4.)NPANA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
(5.)ESAsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
(6.)CorridorsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
(7.)Wildlife CorridorsNA0There is no presence of any CPA, NPA, ESAs, ESZ corridor and wildlife corridors in 10 km radius of project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0There is no defence installations within 10 km from project site
(2.)ForestNA0There is no forest land within 10 km from project site
(3.)Archaeological SitesNA0There is no any archaeological sites within 10 km from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 20.64
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Blackbuck, Indian wolf, Indian monitor lizard, Indian peafowl, Leopard.
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Krishna river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 9.36
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 640
(c)Temporary Employment- During Construction 80
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 720
32.
Green Belt in Ha:
(a)Total Area of Green Belt 6.88
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 10220
(d)Funds Allocated for Plantation 7000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. Augmentation of proposed green belt in the industrial area and its surrounding shall help in improving the aesthetic beauty of the surrounding environment giving a pleasant look and improvising the air quality. 2. Green belt will help in arresting dust emissions as well as noise.
(2.)Social1. Employment generation 2. Improvement in the Physical & Social Infrastructure 3. Upliftment of local peoples
(3.)Financial1. The community that resides in the nearby areas will be benefited directly or indirectly by this project 2. After establishment, the industry will meet the national interest of economical growth through sustainable development, as alcohol has been a great source of revenue through excise duty levied by the Government
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0135
(ii)Name of the EIA Consultant Equinox Environments (I) Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 ā€˜Eā€™ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are hereby submitting the Compliance Report of Additional Detail Sought (ADS) raised on 24.03.2023 06 Apr 2023
2.NAPlease furnish the following information : (i)why previous public hearing was not accepted and had to be reconducted? (ii) Fresh public hearing report and copy Advt. (iii) How close are the habitations from the project as there are many complaints in PH regarding pollution from project? 24 Mar 2023
3. ADS Reply LetterWe are hereby submitting the Compliance Report of Additional Detail Sought (ADS) raised on 05.06.2021 01 Mar 2023
4.NAPl. refer EDS dated 7th April, 2021, as per Chairman statement, PH is not concluded/valid, the same shall be conducted again following the procedure mentioned in EIA Notification, 2006. After compliance of the above points, your proposal will be considered further. Apart from this, also submit: 1.Surface water permission in true/attested English copy clearly mentioning validity and quantity of water withdrawal permitted. 2.Air quality impact prediction: incremental concentrations need to be revised/rechecked. 3.Schedule 1 species are present in study area, kindly prepare a conservation plan and submit to DFO and upload both the documents in Form 2. 4.Land and land conversion documents to be uploaded. 05 Jun 2021
5. ADS Reply LetterWe are hereby submitting the Compliance Report of Additional Detail Sought (ADS) raised during 17th EAC meeting for industry-II held on 27.02.2020. 16 Apr 2021
6.NAPl. refer MoM of 17th EAC (Ind -2) meeting dated 25th to 27th February, 2020, Committee desired certain additional information/document which is still not complied by you. Further,the PH is not concluded/valid, the same shall be conducted following the procedure mentioned in EIA Notification, 2006. After compliance of the above points, your proposal will be considered further. 07 Apr 2021
7. ADS Reply LetterWe are hereby submitting the Additional Detail Sought (ADS) reply raised during 17th EAC meeting for industry-II held on 27.02.2020. 27 Mar 2021
8.NAThe Committee after detailed deliberations desired for the following additional information/documents: (i) Clarification from the SPCB/ADM regarding sanctity and conclusion of the public hearing already conducted. If the public hearing is not concluded/valid, the same shall be conducted following the procedure mentioned in the EIA Notification, 2006. (ii) Site visit report from the Regional Office of the Ministry regarding the status of existing project, details of activities started in the complex, etc. (iii) Water balance and effluent management scheme shall be revised reducing the fresh water requirement (viz. zero fresh water requirement utilizing the water from sugar crushing) and with ZLD scheme (treatment system, incineration, etc). MINUTES OF THE 17th MEETING OF THE EAC (INDUSTRY-2 SECTOR) HELD DURING FEBRUARY 25-27, 2020 Page 99 of 185 The proposal was accordingly deferred for the needful. 11 Mar 2020
9. ADS Reply LetterRequest for reconsidering our proposal - M/s. Shivneri Sugars Ltd, Ganesh Tekadi, Nhavi, Tal: Koregaon, Dist: Satara, Maharashtra in upcoming EAC meeting for grant of Environmental Clearance (EC). 19 Feb 2020
10.NAThe project proponent, vide email dated 31.12.2019, has informed their inability to attend the EAC meeting and requested to defer the proposal. Based on the request of the project proponent, the Committee has accordingly decided to defer the proposal. 15 Jan 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSushant Shrimant Patil
DesignationExecutiveDirector
Name of Company (Applicant Name should not be given here)SHIVNERI SUGARS LTD.
AddressA/p. Ganesh tekadi, Nhavi (Bk.), Tal. Koregaon, Dist. Satara, Maharashtra
Print