1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Expansion of pesticide specific intermediate and synthetic organic chemicals manufacturing Facility by Deepak Nitrite Limited Plot No 1 to 8, 26 to 34, MIDC Roha, Dist Raigad, Maharashtra. | (b)Name of the Company / Organisation | DEEPAK NITRITE LTD | (c)Registered Address | Plot No.1-8, 26-34, MIDC Dhatav, Tal Roha, Dist. Raigad,,Raigad,Maharashtra-402116 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sunil Desai | (b)Designation (Owner/ Partner/ CEO) | SiteHeadOperation | (c)Address | Plot No.1-8, 26-34, MIDC Dhatav, Tal Roha, Dist. Raigad,,Roha,Raigad,Maharashtra-402116 | (d)Pin code | 402116 | (e)E-mail | gadeshpande@godeepak.com | (f)STD Code. | 2194(f)Telephone No. | 263550 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/MH/IND2/63448/2016 | (d)Master Proposal Number(Single Window) | SW/120778/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No 1-8, 26-34 | (b)Pincode | 402116 | (c)Bounded Latitudes (North) | | From | | Degree | 18.25 | Minutes | | Second | | From | | Degree | 18.25 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.9 | Minutes | | Second | | From | | Degree | 73.9 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43H2 E43H3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 12 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Raigad | Roha | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J- 11011/363/2016-IA.II(I) | (c)Date of Issue of TOR | 28 Feb 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 27 Apr 2017 | (c)Date of Issue of EC | 03 Jan 2018 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | project within notified industrial area | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-696/RON/2018-NGP/5722 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 5 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 2,3NXL or 2,4NXL or 3,4NXL or 2,6NXL | 0 | 1330 | 1330 | Others | Ton per month | Road | | (2.) | PNC or PC or ONC or OC | 0 | 300 | 300 | Others | Ton per month | Road | | (3.) | 2ABTF or 3ABTF or 2NBTF or 3NBTF or 4NBTF | 0 | 400 | 400 | Others | Ton per month | Road | | (4.) | OA or TMHQ | 0 | 100 | 100 | Others | Ton per month | Road | | (5.) | Aniline | 0 | 10 | 10 | Others | Ton per month | Road | | (6.) | sodium acetate | 0 | 150 | 150 | Others | Ton per month | Road | | (7.) | CMAA | 0 | 50 | 50 | Others | Ton per month | Road | | (8.) | 3 AAP | 0 | 48 | 48 | Others | Ton per month | Road | | (9.) | CL BTF or OHBTF or OA BTF | 0 | 25 | 25 | Others | Ton per month | Road | | (10.) | 2,3 or 2,4 or 2,5 Xylenol | 0 | 120 | 120 | Others | Ton per month | Road | | (11.) | OT | 0 | 46 | 46 | Others | Ton per month | Road | | (12.) | Adenine or PMPA or S alcohol or DBTZ or TMP | 0 | 30 | 30 | Others | Ton per month | Road | | (13.) | 2- cyanophenol | 0 | 150 | 150 | Others | Ton per month | Road | | (14.) | PPO | 0 | 150 | 150 | Others | Ton per month | Road | | (15.) | PAR or MMDPA | 0 | 100 | 100 | Others | Ton per month | Road | | (16.) | 3 NAP | 0 | 60 | 60 | Others | Ton per month | Road | | (17.) | 3 HAP | 0 | 30 | 30 | Others | Ton per month | Road | | (18.) | 2MePPDA or DBPPDA or 1,3 CHD | 0 | 100 | 100 | Others | Ton per month | Road | | (19.) | SMIA | 0 | 25 | 25 | Others | Ton per month | Road | | (20.) | ChlorophenesinorMMePPDAor 2AFor MABFor NMBAor NMDO | 0 | 30 | 30 | Others | Ton per month | Road | | (21.) | Pilot plant | 0 | 10 | 10 | Others | Ton per month | Road | | (22.) | 1,2,4 Triazinone or TCH or DCP | 0 | 100 | 100 | Others | Ton per month | Road | | (23.) | TFMAP | 0 | 200 | 200 | Others | Ton per month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Reactors vessels tanks Columns | yes | yes | yes | No | (2.) | Cooling tower boiler TFH | yes | yes | yes | No | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Mar 2018 | (iv)Valid Upto | 30 Jun 2019 | (v)File No. | 1803000099 | (vi)Application No. | 31393 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 156 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 15 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.17 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.37 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1 | (b)Existing quantity of raw material/fuel | 1 | (c)Total quantity of raw material/fuel | 2 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Methanol | 7525 | Others | Ton | nearby | Road | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 79.2 | 61.2 | 78.7 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 18.5 | 11.6 | 18 | 80 | (3.) | Others | CO | Mili Gram per Meter Cube | 0.44 | 0.2 | 0.44 | 2 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 37.5 | 29.4 | 37.4 | 60 | (5.) | NOx | | Micro Gram per Meter Cube | 32.8 | 19.5 | 32.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | Manganese | mg/l | | 0 | 0 | 0.1 | 0.1 | (2.) | pH | | | NA | | 6.62 | 6.62 | 8.5 | 8.5 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 90 | 90 | 500 | 500 | (5.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1 | (6.) | Others | Calcium | | mg/l | | 20 | 20 | 75 | 75 | (7.) | Total Hardness | | | mg/l | | 74 | 74 | 200 | 200 | (8.) | Chlorides | | | mg/l | | 24 | 24 | 150 | 150 | |
14.3. No. of Surface Water monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.1 | 6.1 | E | (2.) | pH | | NA | | 7.56 | 7.56 | E | (3.) | BOD | | mg/l | | 8 | 8 | E | (4.) | COD | | mg/l | | 0 | 0 | E | (5.) | Others | TDS | mg/l | | 70 | 70 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 61.4 | 61.4 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.1 | 67.1 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 19.3 | 19.3 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 830.3 | 830.3 | (3.) | pH | | | 7.1 | 7.1 | (4.) | N(Nitrogen) | Kilogram per hectare | | 1020 | 1020 | (5.) | K(Potassium) | Kilogram per hectare | | 82 | 82 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.95 To 7.7 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.1 To 4.05 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | from MIDC | 1647 | 0 | Not Appliacble | Pipeline | | Others | from MIDC pipeline | 00 | 07 Oct 2019 | 1164 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic, Process, washing, Utilities | 777 | 880 | ETP, RO, MEE, stripper | Others | partly recycle and partly discharge | 530 | 247 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 777 | (b)Total Discharged Water (Kilolitre per Day) | 247 | (c)Total Reused Water (Kilolitre per Day) | 530 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Insulation Material | Industrial Waste | | 4 | Tons | 0 | Road | | Others | Sale to Authorized party | (2.) | Iron Sludge/ Iron Oxide | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1488 | Tons | 0 | Road | | Others | Sale to Authorized party or TSDF | (3.) | Charcoal Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 260 | Tons | 0 | Road | | Others | Sale to Authorized party or TSDF | (4.) | Filter pad or bag | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 24 | Tons | 0 | Road | | Others | Sale to Authorized party | (5.) | E waste | Others | E waste | 0.6 | Tons | 0 | Road | | Others | Sale to Authorized party | (6.) | Distillation Residues | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3922 | Tons | 0 | Road | | Others | Coprocessing or TSDF | (7.) | MEE salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 564 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | MS/SS scrap | Industrial Waste | | 84 | Tons | 0 | Road | | Others | Sale to Authorized party | (9.) | Boiler ash | Bottom Ash | | 3630 | Tons | 0 | Road | | Others | Sale to Authorized party | (10.) | Canteen waste | Others | canteen waste | 8.4 | Tons | 0 | Road | | Others | Vermicomposting | (11.) | Used/spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 116 | Tons | 0 | Road | | Authorized Recyclers | | (12.) | Wastes or residues containing oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 0 | Road | | Others | Auth Recycler or CHWTSDF | (13.) | Spent Chemicals | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1092 | Tons | 0 | Road | | Others | sale to user | (14.) | Sludge from wastewater | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4288 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (15.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Authorized Recyclers | | (16.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Others | recycler | (17.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Others | recycler | (18.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Authorized Recyclers | | (19.) | Spent or Mix solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2496 | Tons | 0 | Road | | Others | Sale to Authorized party | (20.) | Lead acid battery | Others | E waste in nos | 20 | Tons | 0 | Road | | Others | Sale to Authorized party | (21.) | Glass ware/ broken/discarded glass | Industrial Waste | | 24 | Tons | 0 | Road | | Others | Sale to Authorized party | (22.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Others | recycler | (23.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Authorized Recyclers | | (24.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1200 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (25.) | Dilute Sulfuric Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 35652 | Tons | 0 | Road | | Others | sale to actual user | (26.) | Wood, Paper, PVC, rubber, plastic etc | Industrial Waste | | 84 | Tons | 0 | Road | | Others | Sale to Authorized party | (27.) | Thermo pack Ash | Bottom Ash | | 24 | Tons | 0 | Road | | Others | Sale to Authorized party | (28.) | Discarded containers/ barrels/ liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1800 | Tons | 0 | Road | | Others | recycler | (29.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 172 | Tons | 0 | Road | | Others | Sale to Authorized party or TSDF | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 71.3 | 1.9 | 0.48 | 71.79 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 37.5 | 1.9 | 0 | 37.6 | 60 | (3.) | NOx | | Microgram per Meter Cube | 26.1 | 1.9 | 2.53 | 28.7 | 80 | (4.) | Others(Specify) | CO | NA | 0 | 0 | 0 | 1 | 0 | (5.) | SO2 | | Microgram per Meter Cube | 15.3 | 1.9 | 4.22 | 19.6 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 8 TPH Boiler & 6 Lakh Thermopack | coal 32.83 TPD | 34 | 1.2 | PM10 | | 0 | (2.) | 2 750 KVA DG & 1 500 KVA DG | HSD 562 Lit/ Hr | 3.5 | 0.4 | PM10 | | 0 | (3.) | 2 DG set of 1000 KVA | 500 Lit/ Hr | 3.5 | 0.4 | PM10 | | 0 | (4.) | 4 Lakh kcal Hot oil unit | FO 20.83 kg/Hr | 20 | 0.6 | PM10 | | 0 | (5.) | 20 TPH Boiler & 10 Lakh kcal Thermopack | Coal 75 TPD | 36 | 1.25 | PM10 | | 0 | (6.) | 3 nos. of NOx, SOx & HCl scrubber each | 0 | 8.5 | 0.3 | PM10 | | 0 | (7.) | 8 TPH Boiler & 4 Lakh Hot oil unit | coal 4 TPD, FO 11.25 KLD | 24.5 | 1 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 5000 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 nos. of 1000 KVA, 2 nos. of 750 KVA, 1 no. of 50 | (e)Stack Height (in m) | 8.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 3.4816 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 3.4816 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1358.36 | (b)Waste/Barren Land (ha.) | 8850.2 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 367.54 | (e)Settlements (ha.) | 81.76 | (f)Industrial (ha.) | 216.19 | (g)Forest (ha.) | 2154.01 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 13028.060000000003 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.3676 | | (2.) | Main Plant | | 3.114 | | (3.) | Others | NA | 0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | NA | 0 | NA | (2.) | ESAs | Village Dhatav as per WG draft notification | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | Critically Polluted Area | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | WLS | NA | 0 | NA | (7.) | ESZs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Others | NA | NA | 0 | NA | (3.) | Forest | | Reserve forest | 1.5 | reserve forest | (4.) | Archaeological Sites | | Avchitgad | 6.46 | notified | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kundalika river | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 6 | (f)Total Manpower | 100 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 0.3676 | 0.3676 | (2.) | No. of Plants | 100 | 400 | 500 | (3.) | Percentage of Total Project Area | 0 | 33 | 33 | (4.) | Funds Allocated | 0 | 10 | 10 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Social upliftment through CER | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0117 rev 01 | (ii)Name of the EIA Consultant | Aditya Environmental Services Pvt. Ltd | (iii)Address | 107 Hiren Light Industrial estate Mumbai | (iv)Mobile No. | 9821513367 | (v)Landline No. | 0224212750 | (vi)Email Id | rajiv@aespl.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 24 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply letter to ADS | 17 Dec 2019 | 2. | NA | The EAC, during
deliberations noted that the project
details mentioned in the EIA report were not consistent with that presented
during the meeting. The EAC, after detailed
deliberations has asked for clarification/inputs, in respect of the | 10 Dec 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sunil Desai | Designation | SiteHeadOperation | Name of Company (Applicant Name should not be given here) | DEEPAK NITRITE LTD | Address | Plot No.1-8, 26-34, MIDC Dhatav, Tal Roha, Dist. Raigad |
|