1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Chhindwaraplus
(b)Name of the Company / Organisation Chhindwara Plus Developers Ltd.
(c)Registered Address 9, Imambada Road, Nagpur-18,9, Imambada Road, Nagpur-18,Nagpur,Maharashtra-440018
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sunil Puri
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address NIL
(d)Pin code 440018
(e)E-mail mail@chhindwaraplus.com
(f)STD Code. 712(f)Telephone No. 2724293
(g)Fax No. 2720716
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/NCP/25386/2014
(d)Master Proposal Number(Single Window) SW/120569/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1/2,1/3,20/1,20/2,21,22,23,24/1,24/2,24/3,24/4,24/
(b)Pincode 480106
(c)Bounded Latitudes (North)
From
Degree 212944.86
Minutes
Second
From
Degree 213109.21
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 784807.53
Minutes
Second
From
Degree 785222.27
Minutes
Second
(e)Survey of India Topo Sheet No. 55 N
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 652
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 15
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshChhindwaraSausar
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 21-54/2017-IA-III
(c)Date of Apply of TOR 03 Nov 2016
(d)Date of Issue of TOR / Standard ToR 20 Mar 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :14
PWD Rest House Compound, Sausar
State :Madhya Pradesh
District :Chhindwara
Tehsil :Sausar
Village :Sausar
300Mainly Revenue Related issues of LandDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SEZ Industrial Park1320.065 Hectares
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1320.0651320.065HectaresRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 57.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.02
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 7.45
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 27240
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 27240
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water27240Cubic Meter per DayKanhan River and Gondhiwadhona DamPipe Conveyor3 OthersWater Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube714.280
(2.)PM10Micro Gram per Meter Cube40732.2100
(3.)SO2Micro Gram per Meter Cube614.880
(4.)PM2.5Micro Gram per Meter Cube31721.260
(5.)OthersCOMicro Gram per Meter Cube5.975.96104
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.17.16.58.5
(2.)TDSmg/l12263625002000
(3.)Chloridesmg/l4651062501000
(4.)Fluoridemg/l0.960.0411.5
(5.)Heavy MetalsZINCmg/l10.6515
(6.)Total Hardnessmg/l23360200600
(7.)TSSmg/l218112605002000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.17.6A
(2.)BODmg/l33A
(3.)DOmg/l6.15.1A
(4.)CODmg/l4412A
    14.4.     No. of Ambient Noise monitoring locations : 35
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.630.465
(2.)Leq(Day)A-weighted decibels(dB(A))62.133.475
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.87.6
(2.)N(Nitrogen)Kilogram per hectare213.237.60
(3.)Electric ConductivityMillisiemens per Centimetre8020
(4.)P(Phosphorus)Kilogram per hectare28.41.2
(5.)K(Potassium)Kilogram per hectare459.629.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 19.33 To 2.35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 19.33 To 2.35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersKANHAN RIVER AND GONDHIWADHONA DAM272403Copy of Permission LetterPipelineOthersRADIAL WELL/ JACK WELL AND PUMPED FROM DAM167731 Dec 201627240
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial wastewater1960819608CETPReuse within the Plant & Recycling19608
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 19608
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 19608
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal solid wasteMunicipal Solid Waste43.3Tons15RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube32.26.368.1840.39100
(2.)SO2Microgram per Meter Cube10711260
(3.)NOxMicrogram per Meter Cube10821360
(4.)PM2.5Microgram per Meter Cube1012112122
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel300.5PM101.7
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500000
(b)Source MP Poorv Khetra Vidyut Vitran Co Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1890 kVA
(e)Stack Height (in m) 50
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 80.737
(b)Private Land (ha.) 574.27
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 167.405
(e)Other Land (ha.) 497.653
    Total Land (ha.) 1320.065
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 506.447
(b)Waste/Barren Land (ha.) 718.073
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 80.737
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Cart road 14.808
    Total (ha.) 1320.065
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant701.53
(2.)Township90.87
(3.)Green belt150.45
(4.)OthersCommercial and public377.21
Total (ha.) 1320.06
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNil0-
(2.)NPANil0-
(3.)Critically Polluted AreaNil0-
(4.)Wildlife CorridorsPench Tiger Researve30-
(5.)WLSPench Tiger Researve30-
(6.)CorridorsSatpura Pench Corridor18-
(7.)ESZsNil0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0-
(2.)Defence InstallationsNil0Nil
(3.)ForestPachmadi Biosphere Researve84Very far from the proposed SEZ site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/MP/Others/27128/2017
(ii)Date of In-Principle (Stage-I) approval 11 Feb 2020
(iii)Area diverted 0
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Revenue
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 500
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1320.065
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired -
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 9
(b)No. of Households 11
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 329
(e)Funds Allocated for R&R(in INR) (in Lacs) 289
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kanhan River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 15000
(c)Temporary Employment- During Construction 10000
(d)Temporary Employment- During Operation 14500
(e)No. of working days 365
(f)Total Manpower 40000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 449.777
(b)Percentage of Total Project Area 34.07
(c)No. of Plants to be Planted 55000
(d)Funds Allocated for Plantation 15000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe various Environmental facilities and infrastructure planned in the SEZ area, once become fully operational will certainly improve the Environmental condition of the entire area. This includes solid waste management facility, water treatment plant, and water harvesting facility, etc.
(2.)SocialAt the project site, SEZ needs to practice number of community welfare activities in the following areas and the same will be further improved in collaboration with District Administration. • Health and Family Welfare • Education • Social development activities • Environmental activities The SEZ should also provide assistance in improving the development of infrastructural facilities to the nearby villages through following: • Development of communication facilities within the villages like road
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 30
(b)Total No. of Flats to be Build 2000
(c)No. of Buildings 1326
(d)Total plot area (sqm) 13198749.1
(e)Total built up area (sqm) 13198749.1
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 32
(d)Capacity 3200
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 28800
5.
Energy Saving Measures:
(a)Source/Mode Solar, CFL, LED
(b)Percentage 2
(c)Quantity 10
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0088
(ii)Name of the EIA Consultant National Environmental ENgineering Research Instit
(iii)Address Nehru Marg, Nagpur 440020
(iv)Mobile No. 9422300590
(v)Landline No. 0712224988
(vi)Email Id ms_kumar@neeri.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 17 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. EIA/EMP following the generic structure strictly as per EIA Notification, 2006 as amended from time to time. EIA report should include the Social Impact Assessment and R&R Plan. 2. Comparison table of issues raised during public hearing and commitment made by the project proponent with time bound action plan and sufficient fund provision 3. Submit the activities wise fund provision (calculated on slab basis) for CER as per Ministry’s OM dated 1st May, 2018. 4. English version of approved public hearing (PH) minutes. 15 Nov 2019
2.NAThe correction have been made as per the instruction received 12 Dec 2019
3.NAAs per the generic structure of Appendix III Social Impct assessment and R&R action plan in chapter 7 of the EIA/EMP is required Please submit revised EIA/EMP by incorporating the same 24 Dec 2019
4.NAThe correction have been made as per the instruction received 02 Jan 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSunil Puri
DesignationDirector
Name of Company (Applicant Name should not be given here)Chhindwara Plus Developers Ltd.
Address9, Imambada Road, Nagpur-18
Print