Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Shri Chandreshwari Chemicals Pvt. Ltd.
(b)Name of the Company / Organisation SHRI CHANDRESHWARI CHEMICALS PRIVATE LIMITED
(c)Registered Address A/P: Nej, Tal.: Chikkodi, Dist.: Belgaum, Karnataka.,,Belgaum,Karnataka-591239
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajendra Devappa Nigave
(b)Designation (Owner/ Partner/ CEO) CMD
(c)Address LIG-104,New Hudco colony,near KLE CBSE School, Nipani.,,Chikodi,Belgaum,Karnataka-591237
(d)Pin code 591237
(e)E-mail r.nigave@gmail.com
(f)STD Code. 8338(f)Telephone No. 222628
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/IND2/73280/2018
(d)Master Proposal Number(Single Window) SW/120490/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 82/1, A/P - Nej, Tal. Chikodi, Dist. Belgaum
(b)Pincode 591239
(c)Bounded Latitudes (North)
From
Degree 16295740
Minutes
Second
From
Degree 1630422
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 7430651
Minutes
Second
From
Degree 7430811
Minutes
Second
(e)Survey of India Topo Sheet No. 47L/6, 47L/7.47L/10, 47L/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 578
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.13
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBelgaumChikodi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/79/2018-IA-II(I)
(b)Date of Apply of TOR 01 Mar 2018
(c)Date of Issue of TOR / Standard ToR 05 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
A/P - Nej, Tal. Chikodi, Dist. Belgaum
State :Karnataka
District :Belgaum
Tehsil :Chikodi
Village :Nej
85No issues were raised during Public HearingDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Organic Chemicals Manufacturing Unit15 TPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Formaldehyde (37 %)10OthersTPDRoad
(2.)Di-ethyl Pthalate5OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 5.95
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.148
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.19
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20991
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20991
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulfuric Acid45Tons per AnnumOpen MarketRoad700 Open MarketCopy of Linkage
(2.)Phthalic Anhydride1050Tons per AnnumOpen MarketRoad700 Open MarketCopy of Linkage
(3.)ethyl alcohol780Tons per AnnumOpen MarketRoad700 Open MarketCopy of Linkage
(4.)Methanol1800Tons per AnnumOpen MarketRoad800 Open MarketCopy of Linkage
(5.)Bagasse17280Tons per AnnumOpen MarketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2018 To 30 Apr 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube38.127.238.180
(2.)PM10Micro Gram per Meter Cube51.944.551.9100
(3.)SO2Micro Gram per Meter Cube30.025.330.080
(4.)PM2.5Micro Gram per Meter Cube20.615.020.660
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l36.1725.6300
(2.)TDSmg/l809.42536.345002000
(3.)Heavy MetalsMercurymg/l000.010.01
(4.)pHNA7.607.158.58.5
(5.)Fluoridemg/l0.350.1311.5
(6.)Chloridesmg/l59.4742.362501000
(7.)Total Hardnessmg/l381.05211.58200600
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.64.2E
(2.)BODmg/l22.683.21E
(3.)pHNA7.837.50E
(4.)CODmg/l59.368.53E
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))49.731.770
(2.)Leq(Day)A-weighted decibels(dB(A))63.843.975
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram1460.21538.65
(2.)K(Potassium)Milligram per Kilogram198.63115.63
(3.)Electric ConductivityMillisiemens per Centimetre0.350.13
(4.)pH7.567.18
(5.)P(Phosphorus)Milligram per Kilogram563.8356.21
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 2.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.05 To 26
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 218
(f)Date of Issue 16 Jun 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface476.13Copy of Permission LetterPipelineJack Well0101 Apr 201920
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial waste water9.210ETPReuse within the Plant & Recycling9.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 9.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Boiler AshFly Ash432Tons0RoadOthersGiven to brick manufacturers or manure
(2.)Drums & Empty ContaimersPlastic Waste600Tons0RoadOthersBy sale as scrap
(3.)Pklastic and Paper wasteOthersplastic & Paper waste0.96Tons0RoadOthersBy sale as scrap
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube51.91.860.0251.922100
(2.)PM2.5Microgram per Meter Cube19.41.860.00619.4160
(3.)SO2Microgram per Meter Cube29.55.280.1029.60180
(4.)NOxMicrogram per Meter Cube34.33.800.0634.36180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBagasse300.7SO230
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 600
(b)Source HESCOM Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 60 & 125 KVA capacity DG set
(e)Stack Height (in m) 2.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.60759
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.60759
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1.5685
(b)Waste/Barren Land (ha.) 0.31
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0.013
(e)Settlements (ha.) 0.1374
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub Land, Fallow land, Mining area, Scrub land 1.1123
    Total (ha.) 3.1412000000000004
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.084146
(2.)Green belt0.203905
(3.)OthersOpen Space0.319541
Total (ha.) 0.607592
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0There is no presence of WLS in 10 Km radius of Project
(2.)NPANA0There is no presence of NPA in 10 Km radius of Project
(3.)CorridorsNA0There is no presence of corridors in 10 Km radius of Project
(4.)Wildlife CorridorsNA0There is no presence of Wildlife corridors in 10 Km radius of Project
(5.)Critically Polluted AreaNA0There is no presence of Critically polluted area in 10 Km radius of Project
(6.)ESAsNA0There is no presence of ESA's in 10 Km radius of Project
(7.)ESZsNA0There is no presence of ESZ's in 10 Km radius of Project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0There is no presense of Archaeological site in 10 Km radius of Project
(2.)Defence InstallationsNA0There is no presence of Defense installations in 10 Km radius of Project
(3.)ForestNA0There is no presence of forest land in 10 Km radius of Project
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Vedganga river
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 01
(iii)Date of issue 01 Apr 2019
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 29
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 49
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.2039
(b)Percentage of Total Project Area 33.56
(c)No. of Plants to be Planted 304
(d)Funds Allocated for Plantation 300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financial1. The community that resides in the nearby areas will be benefited directly or indirectly by this project 2. After establishment, the industry will meet the national interest of economical growth through sustainable development, as alcohol has been a great source of revenue through excise duty levied by the Government.
(2.)Social1. Employment generation 2. Improvement in the Physical & Social Infrastructure 3. Up-liftment of local peoples
(3.)Environmental1. Augmentation of green belt and plantation of additional trees in the industrial area and its surrounding shall help in improving the aesthetic beauty of the surrounding environment giving a pleasant look and improvising the air quality. 2. Green belt will help in arresting dust emissions as well as noise.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0135
(ii)Name of the EIA Consultant Equinox Environmets (I) Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 ā€˜Eā€™ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajendra Devappa Nigave
DesignationCMD
Name of Company (Applicant Name should not be given here)SHRI CHANDRESHWARI CHEMICALS PRIVATE LIMITED
AddressA/P: Nej, Tal.: Chikkodi, Dist.: Belgaum, Karnataka.
Print