Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of "V3S East Centre" (Commercial Complex)
(b)Name of the Company / Organisation V3S INFRATECH LIMITED
(c)Registered Address A-20, Naraina Industrial Area, Phase-I, New Delhi,,New Delhi,Delhi-110028
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Tarun Sharma
(b)Designation (Owner/ Partner/ CEO) Authorizedsignatory
(c)Address A-20, Naraina industrial Area, Phase-I, New Delhi,,Chanakya Puri,New Delhi,Delhi-110028
(d)Pin code 110028
(e)E-mail swamy.tarun@gmail.com
(f)STD Code. 11(f)Telephone No. 25896612
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/120350/2006
(d)Master Proposal Number(Single Window) SW/120346/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 12
(b)Pincode 110092
(c)Bounded Latitudes (North)
From
Degree 723400.56
Minutes
Second
From
Degree 723605.83
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 723446.14
Minutes
Second
From
Degree 723520.99
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 207
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.93
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-8/2020-IA-III
(c)Date of Issue of TOR 02 Mar 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 Jan 2020
(c)Date of Issue of EC 09 Mar 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since, it is a building construction project. Henc
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. -
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 14 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up Area3.90930.45904.3683Hectares(ha)Road
(2.)Plot Area1.254001.254Hectares(ha)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)No. of floors2B+G+31 Floor2B+G+4
(2.)No. of basements202
(3.)No. of Blocks101
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 May 2016
(iv)Valid Upto 04 Aug 2020
(v)File No. DPCC/CMC/2016/37000
(vi)Application No. 0-025194
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000OthersNA0OthersNA0 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 08 Jun 2019 To 10 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube35.132.434.180
(2.)PM10Micro Gram per Meter Cube182.4179.8181.4100
(3.)SO2Micro Gram per Meter Cube8.78.57.780
(4.)PM2.5Micro Gram per Meter Cube98.196.397.160
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.10.111
(2.)TDSmg/l81.381.3500500
(3.)Total Hardnessmg/l1212200200
(4.)TSSmg/l0011
(5.)pHNA6.66.68.58.5
(6.)Chloridesmg/l1818250250
(7.)Heavy MetalsLeadmg/l0.010.010.010.01
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.38.3E
(2.)BODmg/l28.228.2E
(3.)DOmg/l3.53.5E
(4.)CODmg/l112112E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.360.365
(2.)Leq(Night)A-weighted decibels(dB(A))53.253.255.0
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.67.6
(2.)K(Potassium)Milligram per Kilogram24.624.6
(3.)P(Phosphorus)Milligram per Kilogram12.212.2
(4.)Electric ConductivityOthersMicrosimens per centimeter190.9190.9
(5.)N(Nitrogen)Milligram per Kilogram33.433.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15.74 To 3.60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.89 To 3.23
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board2061 Not Appliacble PipelineOthersPipelinesF5(208) AE-III/ED-9/DDA/1512 Sep 2007205
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing, Cooling etc.162200STPReuse within the Plant & Recycling,Others17 KLD- Water Losses1620
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 162
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 162
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BiodegradableMunicipal Solid Waste91.25Tons0.1RoadOthersOrganic Waste Converter
(2.)RecyclableMunicipal Solid Waste47.45Tons0.1RoadAuthorized Recyclers
(3.)E-WasteE Waste1.82Tons0.1RoadAuthorized Recyclers
(4.)PlasticMunicipal Solid Waste29.2Tons0.1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube182.40.93.04185.45100
(2.)PM2.5Microgram per Meter Cube98.10.90.999.160
(3.)SO2Microgram per Meter Cube8.70.90.559.2680
(4.)NOxMicrogram per Meter Cube35.10.90.5039.4480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3 x 1500 KVAHSD340.3NOx830
(2.)3 x 1500 KVAHSD340.3OthersCO79
(3.)3 x 1500 KVAHSD340.3OthersNMHC10
(4.)2 x 500 KVAHSD32.50.2OthersNMHC15.8
(5.)3 x 1500 KVAHSD340.3PM1010
(6.)2 x 500 KVAHSD32.50.2OthersCO53
(7.)2 x 500 kvaHSD32.50.2PM1013
(8.)2 x 500 KVAHSD32.50.2NOx394
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source BSES Yamuna Power Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3 X 1500 & 1 X 500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.2540
    Total Land (ha.) 1.2540
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot Area 1.2540
    Total (ha.) 1.254
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlot Area1.2540
Total (ha.) 1.254
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaOkhla Critically polluted Area11.19It is in SSW direction.
(2.)ESAsNA0-
(3.)ESZsAsola Wild Life Sanctuary14.93It is in SSW direction.
(4.)CorridorsNA0-
(5.)Wildlife CorridorsNA0-
(6.)WLSAsola Wild Life Sanctuary13.95It is in SSW direction.
(7.)NPANA0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestGarhi Mendu Protective Forest7.56It is in NW direction.
(2.)Archaeological SitesLal Qila4.81It is in NW direction.
(3.)Defence InstallationsHindon Airforce10.90It is in SSW direction.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.2540
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 1.2540
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond Near Mandoli
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond Near Mandoli
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.93
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 300
(e)No. of working days 365
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.188100.1881
(2.)Percentage of Total Project Area15015
(3.)No. of Plants11046156
(4.)Funds Allocated33000023000353000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1881 sqm (15 % of total plot area) has been developed which reduces pollution load in the area.
(2.)SocialEmployment will be generated.
(3.)FinancialTax and Revenue will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 23.8
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 12540
(e)Total built up area (sqm) 43585.809
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 105
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 445
5.
Energy Saving Measures:
(a)Source/Mode Solar heaters, Solar Panels , LED, VFD , BMS
(b)Percentage 11
(c)Quantity 330
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be discharge of waste water into near b
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA?1619/SA 078
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 505, 5th Floor, NN Mall, Mangalam Palace, Sector-3, rohini, New Delhi-110085
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit the following; 1. This is an Expansion project. Kindly provide details of previous environmental clearance if obtained alongwith Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the existing project. 2. Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. 07 Nov 2019
2.NAThe correction have been made as per the instruction received 07 Jan 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantTarun Sharma
DesignationAuthorizedsignatory
Name of Company (Applicant Name should not be given here)V3S INFRATECH LIMITED
AddressA-20, Naraina Industrial Area, Phase-I, New Delhi
Print