Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Ramagundam Opencast-III Expansion Phase-II Project
(b)Name of the Company / Organisation The Singareni Collieries Company Limited
(c)Registered Address M/s. Singareni Collieries Company Limited PO: Kothagudem Collieries - 507 101 Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri G Venkateswara Reddy
(b)Designation (Owner/ Partner/ CEO) Director (Planning & Projects)
(c)Address Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101
(d)Pin code 507101
(e)E-mail gm_env@scclmines.com
(f)STD Code. 8744(f)Telephone No. 243059
(g)Fax No. 08744244115
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/CMIN/120211/2019
(d)Master Proposal Number(Single Window) SW/120209/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Allur Village: Sy. No. 49, 50, 51, 53 to 57, 77 (L
(b)Pincode 505211
(c)Bounded Latitudes (North)
From
Degree 184057
Minutes
Second
From
Degree 184246
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 792958
Minutes
Second
From
Degree 793415
Minutes
Second
(e)Survey of India Topo Sheet No. 56N/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 156
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaPeddapalliPeddapalleJallaram
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/52/A.P/1458
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 16 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2070.10 ha680000027200009520000Tons per Annum(TPA)Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)9.52 MT in 2070.10 ha Dragline & Shovel- Dumper6.80 MT in 2070.10 ha Dragline & Shovel- Dumper9.52 MT in 2070.10 ha Dragline & Shovel- Dumper9.52 MT in 2070.10 ha Dragline & Shovel- Dumper40% Capacity Expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Oct 2016
(iv)Valid Upto 31 Mar 2021
(v)File No. 16052196979
(vi)Application No. RG2/ENV/2016/22,Dt.04.02.2016
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 627.41
(b) Funds Allocated for Environment Management (Capital) (in Crores) 116.43
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.92
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.307
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 101368
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 101368
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water5740Kilo Litre per DayFrom Project ItselfOthersPipeline1 OthersNACopy of Linkage
(2.)Explosives26166Tons per AnnumPurchase From Explosive CompaniesRoad10 MoUCopy of Linkage
(3.)Diesel101368OthersKL/AnnumPurchase from oil companiesRoad15 MoUCopy of Linkage
(4.)Power3.750Mega Watt(MW)132 kv Ramagundam SubstationOthersOHT Lines15 LOACopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.97 To 10.80
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 9.96
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater57401Copy of Permission LetterPipelineOthersPumping3050/T/201420 Nov 20140
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine Water89968996Settling ponds/Slow sand filtersOthersDischarge in to near by tanks57403256
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8996
(b)Total Discharged Water (Kilolitre per Day) 3256
(c)Total Reused Water (Kilolitre per Day) 5740
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Hard OBOthersHard OB125715000Tons2OthersDumpersOthersStorage in Dumps
(2.)To SoilOthersTop Soil4800000Tons2OthersDumpersOthersSpreading Over Dumps
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube220.0009.00229.01250
(2.)PM2.5Microgram per Meter Cube85.0003.6188.611NS
(3.)SO2Microgram per Meter Cube14.900.2215.13120
(4.)NOxMicrogram per Meter Cube20.200.6820.881120
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8044
(b)Source From NTPC Ramagundam and 240 kV / 132 kV Manthani
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Nil
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1655.23
(c)Government Land (ha.) 414.87
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2070.10
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1642.02
(b)Waste/Barren Land (ha.) 85.68
(c)Grazing/ Community Land (ha.) 108.16
(d)Surface Water Bodies (ha.) 141.12
(e)Settlements (ha.) 88.95
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Roads 4.17
    Total (ha.) 2070.1
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area1229.41
(2.)OB Dump Area474.50
(3.)Safety Zone236.44
(4.)LandFill24.85Embankment
(5.)Built Up Area71.19
(6.)OthersDiversion of Nallah33.71Diversion of Nallah
Total (ha.) 2070.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area-0NA
(2.)NPA-0NA
(3.)ESAs-0NA
(4.)ESZs-0NA
(5.)Corridors-0NA
(6.)Wildlife Corridors-0NA
(7.)WLS-0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest-0Nil
(2.)Archaeological Sites-0Nil
(3.)Defence Installations-0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1990.29
(b)Land yet to be acquired(Ha) 79.81
(c)Status of Land acquisition if not acquired Under Process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Jallaram Nallah
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Jallaram Nallah was already along the southern boundary and further diverted towards south through the undisturbed area along the project boundary in a phase manner to maintain the natural drainage sy
(ii)Details of Study Conducted NA
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. EE/ID/PDPL/DB/D3/94/M/1
(iii)Date of issue 03 Jun 2014
(iv)Recommendation Nil
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Godavari River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 1780
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 550
(e)No. of working days 360
(f)Total Manpower 2330
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt383.23778.131161.3600000000001
(2.)Percentage of Total Project Area3367100
(3.)No. of Plants95807519453252903400
(4.)Funds Allocated9.920.130
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalOf the total project area of 2070.10 ha, 1161.36 ha will be reclaimed with plantation at the end of post closure stage.
(2.)SocialThe Social infrastructure in terms of Road transport, Communication, Housing, Water supply and sanitation, Power, Educational, Banking, Communication, Medical, Recreation, Business establishments and Plantation & Parks will be improved
(3.)FinancialIndirect employment opportunities to local people in contractual works like civil construction, transportation, sanitation, supply of goods and provision of services to the project and other community services.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 9.52
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 38011/12/2017-PCA
(b)Date of Approval 17 Jun 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 2070.10
(f)Approved Capacity 9.52
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 317.96
(b)Mineable Reserves (Million Ton) 235.14
(c)Extractable Reserves(Million Ton) 223.74
(d)Percent(%) of Extraction 70.73
(e)Grade of Coal /Ore /Mineral G9 and G11
(f)Stripping Ratio 1 : 7.89
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Degree-I
(h)Average Gradient(Degree) 1 in 5.5 to 1 in 12
(i)Mining Method Opencast
(j)Life of Mine (Years) 13
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 10
(c)Thickness of seams to be worked on 24.68
(d)Maximum Thickness of Seams (metres) 1A1-2.00, 1A3-2.64, 1Seam-6.60, 2Top-1.82, 2Bot-6.50, 3BSeam-2.60, 3ASeam-2.20, 3Seam-11.80, 4Seam-5.25
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 2070.10
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 27 Nov 2018
(iii)Validity of LOI 15
(iv)Reference No. of LOI 1133/PR(A1)/2018
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 1807.36
(iii)Validity of the lease deed From : 17 Sep 2005 To : 31 Dec 2014
(iv)Date of Execution of Mining Lese 12 Nov 2008
(v)Reference Number Procgs.No.4531/M/2003
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 12 Jan 2015 From : 01 Jan 2015 To : 31 Dec 2034 Copy of Earlier LeaseG.O.Ms.No.2 6848 Existing ML for 1162.76
(2.)Renewal 31 Jul 2008 From : 17 Sep 2005 To : 16 Sep 2025 Copy of Earlier LeaseG.O.Ms.No.201 1554 Existing ML for 644.60
(3.)Renewal 11 Jun 1986 From : 01 May 1985 To : 31 Dec 2014 Copy of Earlier LeaseG.O.Ms.No.291 26.44 I Renewal For 1162.76 ha
(4.)Initial 01 Jan 1900 From : 17 Oct 1957 To : 31 Dec 1984 Copy of Earlier LeaseG.O.Ms.No.1485 IND 26.44 Initial ML For 1162.76 ha
(5.)Initial 01 Jan 1900 From : 17 Sep 1975 To : 16 Sep 2005 Copy of Earlier LeaseG.O.Ms.No.900 6.00 Initial ML For 644.60 ha
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 17.18
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 17.18
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 671 (hectare) at a Depth of 280 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 877.14
13.
Details of Transportation:
(a)In Pit/Underground to Surface Belt Conveyors
(b)Surface to Siding/Loading Belt Conveyors
(c)Transportation / Conveyor Details Rail
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES133.357.77141.12
(2.)AGRICULTURE LAND1399.10242.921642.02
(3.)SETTLEMENTS24.37024.37
(4.)FOREST LAND000
(5.)WASTE LAND85.68085.68
(6.)GRAZING LAND108.160108.16
(7.)OTHERS(Specify)Roads56.712.0568.75
TOTAL1807.36262.742070.1
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS474.5000474.5
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS558.4100558.41
(4.)ROADS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0071.1971.19
(6.)GREEN BELT0000
(7.)EXCAVATION/QUARRY0671.000671
(8.)VIRGIN AREA0000
(9.)OtherSafe Barrier+DiversionNallah+Embankment128.4550.87115.68295
TOTAL1161.36721.87186.8702070.1
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 474.50
(b)Internal Dump(in hectare) 558.41
(c)Quarry(in hectare) 00
(d)Safety Zone(in hectare) 103.60
(e)Final Void of 671 (hectare) at a Depth of 280 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 24.85
(h)Total afforestation plant (in hectare) 1161.36
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2017..186.86.86.86.80
(2.)2015..166.36.36.350
(3.)2018..196.86.86.86.3540
(4.)2016..176.86.86.86.0140
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/19/0981
(ii)Name of the EIA Consultant EPTRI
(iii)Address EPTRI,91/4 Gachibowli
(iv)Mobile No. 9885236493
(v)Landline No. 0406756750
(vi)Email Id dgeptri@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 29 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. May kindly peruse the certificate of compliance of earlier EC. There were several observations and non-compliance reported by Regional Officer. For consideration of the instant proposal, you are requested to submit the action taken report/plan duly endorsed by the regional officer. 2. Copy of mining plan approved by the MoC for the proposed capacity 11 Oct 2019
2.NAThe correction have been made as per the instruction received 13 Dec 2019
3.NAIn S. No. 35(4) of Form 2, approval letter of MP is uploaded, however PP shall upload the copy of Mine Plan alongwith the approval letter for appraisal before the EAC. In Sr. No. 35 (9) and (11) of Form #2 – details of OB Dump and Final Mine void are not filled. The proposal is seeking PH exemption for 40% increase in capacity. May kindly provide the compliance of Ministry’s OM 15th September, 2017 Validity period of Consultant EPTRI has expired. May kindly provide valid consultant certificate. 09 Jan 2020
4.NAThe correction have been made as per the instruction received 10 Jan 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply for the MoM of 53rd EAC meeting held on 5th Mar, 2020. 09 Dec 2020
2.NAThe EAC, after detailed deliberation agreed the proposal @ 20% expansion, however while deliberating the compliance of EC which is very poor and as mentioned in Certified Compliance of RO, MoEFCC Chennai, there are 10 number of non-compliances reported during visit. The EAC noted that PP has not yet obtained the permission for diversion of nalla (Jallaram nallah at two different places and road (Two public roads are proposed for diversion) involved in the proposal. Alternate access should be provided accordingly for public use before diversion of the road. Effect of diversion of jallaramvagu on river Godavari at siripuram village needs to be studied. Also height of OB dump is proposed to be about 120 above ground level, necessary permission is desired from DGMS for this. The Committee also noted that there are schedule –I species present in the study area. PP shall take the approval of the Wildlife conservation plan. The PP is operating the mine without the said approval. The Committee deliberated the issues and deferred the proposal. The proposal may be considered after submission of the above necessary compliances. 05 Mar 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri G Venkateswara Reddy
DesignationDirector (Planning & Projects)
Name of Company (Applicant Name should not be given here)The Singareni Collieries Company Limited
AddressKothagudem P.O -507101 Khammam Dt