1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Ramagundam Opencast-III Expansion Phase-II Project | (b)Name of the Company / Organisation | The Singareni Collieries Company Limited | (c)Registered Address | M/s. Singareni Collieries Company Limited
PO: Kothagudem Collieries - 507 101
Dist: KHAMMAM, T.Sr,,Khammam,Telangana-507101 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shri G Venkateswara Reddy | (b)Designation (Owner/ Partner/ CEO) | Director (Planning & Projects) | (c)Address | Kothagudem P.O -507101 Bhadradri Kothagudem District,,,Bhadradri Kothagudem,Telangana-507101 | (d)Pin code | 507101 | (e)E-mail | gm_env@scclmines.com | (f)STD Code. | 8744(f)Telephone No. | 243059 | (g)Fax No. | 08744244115 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TG/CMIN/120211/2019 | (d)Master Proposal Number(Single Window) | SW/120209/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Allur Village: Sy. No. 49, 50, 51, 53 to 57, 77 (L | (b)Pincode | 505211 | (c)Bounded Latitudes (North) | | From | | Degree | 184057 | Minutes | | Second | | From | | Degree | 184246 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 792958 | Minutes | | Second | | From | | Degree | 793415 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 56N/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 156 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Peddapalli | Peddapalle | Jallaram | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/52/A.P/1458 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 16 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 2070.10 ha | 6800000 | 2720000 | 9520000 | Tons per Annum(TPA) | | Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | 9.52 MT in 2070.10 ha Dragline & Shovel- Dumper | 6.80 MT in 2070.10 ha Dragline & Shovel- Dumper | 9.52 MT in 2070.10 ha Dragline & Shovel- Dumper | 9.52 MT in 2070.10 ha Dragline & Shovel- Dumper | 40% Capacity Expansion | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Oct 2016 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | 16052196979 | (vi)Application No. | RG2/ENV/2016/22,Dt.04.02.2016 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 627.41 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 116.43 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.92 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.307 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 101368 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 101368 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Water | 5740 | Kilo Litre per Day | | From Project Itself | Others | Pipeline | 1 | Others | NA | Copy of Linkage | (2.) | Explosives | 26166 | Tons per Annum | | Purchase From Explosive Companies | Road | | 10 | MoU | | Copy of Linkage | (3.) | Diesel | 101368 | Others | KL/Annum | Purchase from oil companies | Road | | 15 | MoU | | Copy of Linkage | (4.) | Power | 3.750 | Mega Watt(MW) | | 132 kv Ramagundam Substation | Others | OHT Lines | 15 | LOA | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.97 To 10.80 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 9.96 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 5740 | 1 | Copy of Permission Letter | Pipeline | | Others | Pumping | 3050/T/2014 | 20 Nov 2014 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine Water | 8996 | 8996 | Settling ponds/Slow sand filters | Others | Discharge in to near by tanks | 5740 | 3256 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 8996 | (b)Total Discharged Water (Kilolitre per Day) | 3256 | (c)Total Reused Water (Kilolitre per Day) | 5740 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Hard OB | Others | Hard OB | 125715000 | Tons | 2 | Others | Dumpers | Others | Storage in Dumps | (2.) | To Soil | Others | Top Soil | 4800000 | Tons | 2 | Others | Dumpers | Others | Spreading Over Dumps | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 220.00 | 0 | 9.00 | 229.01 | 250 | (2.) | PM2.5 | | Microgram per Meter Cube | 85.00 | 0 | 3.61 | 88.611 | NS | (3.) | SO2 | | Microgram per Meter Cube | 14.9 | 0 | 0.22 | 15.13 | 120 | (4.) | NOx | | Microgram per Meter Cube | 20.2 | 0 | 0.68 | 20.881 | 120 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 8044 | (b)Source | From NTPC Ramagundam and 240 kV / 132 kV Manthani | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Nil | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1655.23 | (c)Government Land (ha.) | 414.87 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2070.10 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1642.02 | (b)Waste/Barren Land (ha.) | 85.68 | (c)Grazing/ Community Land (ha.) | 108.16 | (d)Surface Water Bodies (ha.) | 141.12 | (e)Settlements (ha.) | 88.95 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Roads | 4.17 | Total (ha.) | 2070.1 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 1229.41 | | (2.) | OB Dump Area | | 474.50 | | (3.) | Safety Zone | | 236.44 | | (4.) | LandFill | | 24.85 | Embankment | (5.) | Built Up Area | | 71.19 | | (6.) | Others | Diversion of Nallah | 33.71 | Diversion of Nallah | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | - | 0 | NA | (2.) | NPA | - | 0 | NA | (3.) | ESAs | - | 0 | NA | (4.) | ESZs | - | 0 | NA | (5.) | Corridors | - | 0 | NA | (6.) | Wildlife Corridors | - | 0 | NA | (7.) | WLS | - | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | - | 0 | Nil | (2.) | Archaeological Sites | | - | 0 | Nil | (3.) | Defence Installations | | - | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1990.29 | (b)Land yet to be acquired(Ha) | 79.81 | (c)Status of Land acquisition if not acquired | Under Process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Jallaram Nallah | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | Jallaram Nallah was already along the southern boundary and further diverted towards south through the undisturbed area along the project boundary in a phase manner to maintain the natural drainage sy | (ii)Details of Study Conducted | NA | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | EE/ID/PDPL/DB/D3/94/M/1 | (iii)Date of issue | 03 Jun 2014 | (iv)Recommendation | Nil | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Godavari River | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 1.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 1780 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 550 | (e)No. of working days | 360 | (f)Total Manpower | 2330 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 383.23 | 778.13 | 1161.3600000000001 | (2.) | Percentage of Total Project Area | 33 | 67 | 100 | (3.) | No. of Plants | 958075 | 1945325 | 2903400 | (4.) | Funds Allocated | 9.9 | 20.1 | 30 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Of the total project area of 2070.10 ha, 1161.36 ha will be reclaimed with plantation at the end of post closure stage. | (2.) | Social | The Social infrastructure in terms of Road transport, Communication, Housing, Water supply and sanitation, Power, Educational, Banking, Communication, Medical, Recreation, Business establishments and Plantation & Parks will be improved | (3.) | Financial | Indirect employment opportunities to local people in contractual works like civil construction, transportation, sanitation, supply of goods and provision of services to the project and other community services. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 9.52 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 38011/12/2017-PCA | (b)Date of Approval | 17 Jun 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 2070.10 | (f)Approved Capacity | 9.52 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 317.96 | (b)Mineable Reserves (Million Ton) | 235.14 | (c)Extractable Reserves(Million Ton) | 223.74 | (d)Percent(%) of Extraction | 70.73 | (e)Grade of Coal /Ore /Mineral | G9 and G11 | (f)Stripping Ratio | 1 : 7.89 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Degree-I | (h)Average Gradient(Degree) | 1 in 5.5 to 1 in 12 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 13 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 10 | (c)Thickness of seams to be worked on | 24.68 | (d)Maximum Thickness of Seams (metres) | 1A1-2.00, 1A3-2.64, 1Seam-6.60, 2Top-1.82, 2Bot-6.50, 3BSeam-2.60, 3ASeam-2.20, 3Seam-11.80, 4Seam-5.25 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 2070.10 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 27 Nov 2018 | (iii)Validity of LOI | 15 | (iv)Reference No. of LOI | 1133/PR(A1)/2018 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 1807.36 | (iii)Validity of the lease deed | From : 17 Sep 2005 To : 31 Dec 2014 | (iv)Date of Execution of Mining Lese | 12 Nov 2008 | (v)Reference Number | Procgs.No.4531/M/2003 | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Renewal | 12 Jan 2015 | From : 01 Jan 2015 To : 31 Dec 2034 | Copy of Earlier Lease | G.O.Ms.No.2 | 6848 | Existing ML for 1162.76 | (2.) | Renewal | 31 Jul 2008 | From : 17 Sep 2005 To : 16 Sep 2025 | Copy of Earlier Lease | G.O.Ms.No.201 | 1554 | Existing ML for 644.60 | (3.) | Renewal | 11 Jun 1986 | From : 01 May 1985 To : 31 Dec 2014 | Copy of Earlier Lease | G.O.Ms.No.291 | 26.44 | I Renewal For 1162.76 ha | (4.) | Initial | 01 Jan 1900 | From : 17 Oct 1957 To : 31 Dec 1984 | Copy of Earlier Lease | G.O.Ms.No.1485 IND | 26.44 | Initial ML For 1162.76 ha | (5.) | Initial | 01 Jan 1900 | From : 17 Sep 1975 To : 16 Sep 2005 | Copy of Earlier Lease | G.O.Ms.No.900 | 6.00 | Initial ML For 644.60 ha | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 17.18 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 17.18 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 671 (hectare) at a Depth of 280 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 877.14 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Belt Conveyors | (b)Surface to Siding/Loading | Belt Conveyors | (c)Transportation / Conveyor Details | Rail | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 133.35 | 7.77 | 141.12 | (2.) | AGRICULTURE LAND | | 1399.10 | 242.92 | 1642.02 | (3.) | SETTLEMENTS | | 24.37 | 0 | 24.37 | (4.) | FOREST LAND | | 0 | 0 | 0 | (5.) | WASTE LAND | | 85.68 | 0 | 85.68 | (6.) | GRAZING LAND | | 108.16 | 0 | 108.16 | (7.) | OTHERS(Specify) | Roads | 56.7 | 12.05 | 68.75 | |
TOTAL | 1807.36 | 262.74 | 2070.1 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXTERNAL OB DUMPS | | 474.50 | 0 | 0 | | 474.5 | (2.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (3.) | INTERNAL OB DUMPS | | 558.41 | 0 | 0 | | 558.41 | (4.) | ROADS | | 0 | 0 | 0 | | 0 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 71.19 | | 71.19 | (6.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (7.) | EXCAVATION/QUARRY | | 0 | 671.00 | 0 | | 671 | (8.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (9.) | Other | Safe Barrier+DiversionNallah+Embankment | 128.45 | 50.87 | 115.68 | | 295 | |
TOTAL | 1161.36 | 721.87 | 186.87 | 0 | 2070.1 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 474.50 | (b)Internal Dump(in hectare) | 558.41 | (c)Quarry(in hectare) | 00 | (d)Safety Zone(in hectare) | 103.60 | (e)Final Void of 671 (hectare) at a Depth of 280 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 24.85 | (h)Total afforestation plant (in hectare) | 1161.36 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2017..18 | 6.8 | 6.8 | 6.8 | 6.8 | 0 | (2.) | 2015..16 | 6.3 | 6.3 | 6.3 | 5 | 0 | (3.) | 2018..19 | 6.8 | 6.8 | 6.8 | 6.354 | 0 | (4.) | 2016..17 | 6.8 | 6.8 | 6.8 | 6.014 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/19/0981 | (ii)Name of the EIA Consultant | EPTRI | (iii)Address | EPTRI,91/4 Gachibowli | (iv)Mobile No. | 9885236493 | (v)Landline No. | 0406756750 | (vi)Email Id | dgeptri@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 29 May 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. May kindly peruse the certificate of compliance of earlier EC. There were several observations and non-compliance reported by Regional Officer. For consideration of the instant proposal, you are requested to submit the action taken report/plan duly endorsed by the regional officer.
2. Copy of mining plan approved by the MoC for the proposed capacity | 11 Oct 2019 | 2. | NA | The correction have been made as per the instruction received | 13 Dec 2019 | 3. | NA | In S. No. 35(4) of Form 2, approval letter of MP is uploaded, however PP shall upload the copy of Mine Plan alongwith the approval letter for appraisal before the EAC.
In Sr. No. 35 (9) and (11) of Form #2 – details of OB Dump and Final Mine void are not filled.
The proposal is seeking PH exemption for 40% increase in capacity. May kindly provide the compliance of Ministry’s OM 15th September, 2017
Validity period of Consultant EPTRI has expired. May kindly provide valid consultant certificate. | 09 Jan 2020 | 4. | NA | The correction have been made as per the instruction received | 10 Jan 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS Reply for the MoM of 53rd EAC meeting held on 5th Mar, 2020. | 09 Dec 2020 | 2. | NA | The EAC, after detailed deliberation agreed the proposal @ 20% expansion,
however while deliberating the compliance of EC which is very poor and as mentioned in
Certified Compliance of RO, MoEFCC Chennai, there are 10 number of non-compliances
reported during visit.
The EAC noted that PP has not yet obtained the permission for diversion of nalla
(Jallaram nallah at two different places and road (Two public roads are proposed for
diversion) involved in the proposal. Alternate access should be provided accordingly for
public use before diversion of the road. Effect of diversion of jallaramvagu on river
Godavari at siripuram village needs to be studied. Also height of OB dump is proposed
to be about 120 above ground level, necessary permission is desired from DGMS for
this. The Committee also noted that there are schedule –I species present in the study
area. PP shall take the approval of the Wildlife conservation plan. The PP is operating
the mine without the said approval.
The Committee deliberated the issues and deferred the proposal. The proposal may be
considered after submission of the above necessary compliances. | 05 Mar 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shri G Venkateswara Reddy | Designation | Director (Planning & Projects) | Name of Company (Applicant Name should not be given here) | The Singareni Collieries Company Limited | Address | Kothagudem P.O -507101
Khammam Dt |
|